SOP Templates > Home Builder > Custom Home Construction > Quality Control > Cleaning (Final) – Pre-Work Inspection Checklist
Cleaning (Final) – Pre-Work Inspection Checklist
This checklist ensures that the house is fully prepared for the final cleaning process by verifying the completion of prior work and the installation of key components. It focuses on ensuring the house is clean, safe, and free of obstructions, while all necessary protections and installations are in place. By completing this inspection, the cleaning team can work efficiently and prepare the home for its final presentation.
Verify any special items with the Site Superintendent
Receive the purchase order
Confirm the house is clean and free of trash or debris
Ensure protection for tubs, sinks, and other fixtures is in place
Check that faceplates are installed on all switches and receptacles
Verify that cabinets are complete with hardware and shelves installed
Confirm all appliances are installed
Ensure drywall and painting work is complete
Verify that all trim is installed
Confirm vinyl flooring is installed
Check that hardwood or parquet flooring is installed
Verify that carpet is installed
Ensure all doors are installed
Check that all hardware is installed
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.