SOP Templates > Home Builder > Custom Home Construction > Quality Control > HVAC (Final) – Final Inspection Checklist
HVAC (Final) – Final Inspection Checklist
This checklist ensures that HVAC systems and components are installed correctly, tested, and functioning as required before the trade contractor leaves the jobsite. It emphasizes the proper fitting of grills, verification of airflow, thermostat testing, and ensuring all manuals are provided. Additionally, it confirms the site is clean, systems are operating efficiently, and the final HVAC inspection has been passed.
Remove coverings from ductwork
Install grills square and level; ensure grills in vinyl areas are flush to the floor and do not tilt more than 1/4 inch when stepped on
Fit all ceiling grills flush with the ceiling and ensure they are properly sealed
Ensure all other grills fit snugly
Test HVAC units to verify correct airflow
Install thermostats square and level
Test thermostats for functionality
Place instruction and warranty manuals for the thermostat, air conditioner, and heater in the kitchen drawer to the left of the range
Set the air conditioning condensation unit level and confirm it is operating properly
Ensure the condensation pump, if applicable, is clean, free of debris, and operating properly
For attic units, confirm the condensation pan and drain pipe are free of obstructions
Install the hot water tank vent pipe
After passing the gas inspection, remove the pressure gauge and cap the pipe
Ensure the house is clean and free of debris
Confirm the house has passed the final HVAC inspection
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.