SOP Templates > Custom Home Construction > HVAC (Rough) – Pre-Work Inspection Checklist

HVAC (Rough) – Pre-Work Inspection Checklist

This checklist ensures the site is prepared for the rough HVAC installation, focusing on verifying plans, permits, and material readiness. It confirms that framing, plumbing, and electrical prerequisites are complete and the work environment is safe, clean, and accessible. These steps ensure that HVAC installation proceeds efficiently and adheres to project requirements.

Pick up and sign for the plans

Receive the purchase order

Obtain the necessary permits

Ensure framing, such as chases, is complete

Install temporary stairs

Install temporary handrails

Ensure safety bracing is in place

Verify the plumbers work is complete and pipes are installed

Clean the interior work area and remove debris

Clean the site and ensure it is free of debris

Confirm electricity is available

If units are to be set in the attic, frame the scuttle hole for access, floor the HVAC unit area, and ensure adequate working space

Verify that the house is roofed and shingles are installed

Ensure HVAC units are verified for correct type and tonnage