SOP Templates > Home Builder > Custom Home Construction > Quality Control > Insulation – Final Inspection Checklist
Insulation – Final Inspection Checklist
This checklist ensures that insulation installation meets quality and performance standards before the trade contractor leaves the jobsite. It emphasizes proper fitting, sealing, and insulation coverage for walls, ceilings, and floors to achieve optimal energy efficiency. Additionally, it focuses on ensuring the site is clean and free of debris.
Inspect all windows to confirm they are intact
Verify that tubs, showers, and other fixtures are undamaged
Ensure all temporary handrails and safety bracing are intact
Seal all penetrations to the outside
Place a minimum of three rulers in the attic, ensuring they are in contact with the ceiling decking
Fit all wall batts snugly at the top, bottom, and sides, and fasten them correctly to cover all areas
Install batt insulation in vaults and tray ceilings
Ensure insulation is of the correct R-value in all areas
Insulate basement walls, including the block foundation, if the basement is finished
Insulate ceilings of garages and basements beneath heated areas
Insulate walls between unheated and heated areas
Weatherstrip all attic access areas
Seal ceiling plates and headers
Place insulation behind wiring, ensuring it is not stuffed around or covering wiring
Ensure insulation behind receptacle and switch boxes does not block the front
Place insulation in jacks and headers of all windows and exterior doors
Clean the house and broom-sweep all areas
Remove all building debris to the dumpster
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.