SOP Templates > Home Builder > Custom Home Construction > Quality Control > Insulation – Pre-Work Inspection Checklist
Insulation – Pre-Work Inspection Checklist
This checklist ensures that the home is prepared for insulation installation by confirming all necessary prerequisites are complete, including inspections, site cleanliness, and the readiness of HVAC, plumbing, and electrical systems. It emphasizes sealing exterior openings, protecting fixtures, and ensuring the site is safe and accessible for efficient insulation installation.
Review the plans, including details for the finished basement
Receive or pick up the purchase order
Verify that rough inspections are complete and the house has passed inspections
Ensure the house is clean and free of debris
Inspect all windows to confirm they are intact and unbroken
Verify that exterior doors are weatherstripped and sealed
Ensure all windows are weatherstripped and sealed
Confirm the bottom plate is sill sealed
Install temporary stairs, if required
Install temporary handrails
Ensure temporary safety bracing is in place
Confirm HVAC ductwork is installed
Cover and protect ducts
Verify that plumbing pipes, tubs, and showers are installed and undamaged
Ensure electrical wiring and boxes are in place
Verify that exterior insulation and sheathing board are installed, undamaged, and repaired as needed with no gaps or missing pieces
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.