SOP Templates > Home Builder > Custom Home Construction > Quality Control > Plumbing (Final) – Final Inspection Checklist
Plumbing (Final) – Final Inspection Checklist
This checklist ensures that all final plumbing installations are completed, operational, and meet project specifications before the trade contractor leaves the jobsite. It emphasizes testing for functionality, verifying alignment, and ensuring that all warranties, tags, and manuals are in place. Additionally, it focuses on cleanliness and the proper condition of the site.
Set all fixtures
Verify all fixtures and faucets (brand and type) match the purchase order and plans
Test all fixtures for operation
Ensure there are no leaks
Verify no excessive noise is heard from water pipes
Inspect faucets, tubs, and showers to confirm there are no surface defects
Ensure tubs and showers are fully secured to the wall
If pedestal sinks are installed, ensure water shutoff valves are accessible and usable
Align all faucets and showerheads, ensuring they are level and straight
Ensure all regular water shutoffs are accessible and in working order
Verify the correct number of water shutoffs
Test the water shutoff at the street to ensure it works correctly
Tag all hot and cold water shutoffs
Tag the main water shutoff
Verify clothes washer faucets are working and tagged with hot and cold labels
Verify the correct number of outside faucets and ensure all are working
Place the strainer and stopper in good condition in the kitchen drawer
Place the emergency key for the garbage disposal in the kitchen drawer with the strainer and stopper
Place warranty and instruction manuals for the hot water tank and garbage disposal in the kitchen drawer to the left of the range
Verify the hot water tank is working
Ensure the hot water tank is on a metal stand and secured per manufacturer’s instructions
Affix a tag with the name and phone number, including an emergency phone number, to the hot water tank and cabinet door
Ensure all inspections have been passed
Clean the house, ensuring it is broom-swept and free of debris
Clear the jobsite of debris, boxes, and other materials