SOP Templates > Custom Home Construction > Plumbing (Rough) – Final Inspection Checklist

Plumbing (Rough) – Final Inspection Checklist

This checklist ensures rough plumbing work is completed to standard and the house is prepared for the next phase of construction. It includes verifying the proper installation of piping, drains, and fixtures, while ensuring cleanliness and passing the rough plumbing inspection.

Dig and complete plumbing lines

Set tubs, showers, and other fixtures

Verify all piping is installed

Verify all drains are installed

Ensure no solder or flux is left on floor areas

Verify all safety bracing and temporary handrails are still in place

Pass the rough plumbing inspection

Clean the house and remove all debris

Broom-sweep the house

Dig and complete plumbing lines

Set tubs, showers, and other fixtures

Verify all piping is installed

Verify all drains are installed

Ensure no solder or flux is left on floor areas

Verify all safety bracing and temporary handrails are still in place

Pass the rough plumbing inspection

Clean the house and remove all debris

Broom-sweep the house