Plumbing (Rough) – Pre-Work Inspection Checklist

This checklist ensures the site is ready for rough plumbing work by verifying framing and blocking are complete, safety measures are in place, and tubs are positioned correctly. It also emphasizes site cleanliness and preparation to allow plumbing work to proceed efficiently and safely.

Receive the purchase order

Ensure framing items for plumbing are complete

Install temporary stairs, if required

Install temporary handrails

Ensure safety bracing is in place

Place tubs in bathroom areas

Install deadwood behind shower stalls for door installation

Install blocking or deadwood as required

Clean the house, ensuring it is broom-swept and free of prior trade contractor debris