Plumbing (Slab) – Final Inspection Report
This checklist ensures that plumbing installed in the slab is complete, capped, and protected as required before the trade contractor leaves the jobsite. It emphasizes proper placement and protection of the plumbing to prepare for the next construction phase.
Set plumbing in the slab, ensuring it is capped and protected as required