Poured Wall Foundations – Final Inspection Checklist

This checklist ensures the quality and accuracy of poured wall foundations before the trade contractor leaves the jobsite. It emphasizes precise alignment, proper sealing, and cleanup to meet project specifications and prepare the site for subsequent construction phases.

Ensure all walls are true, plumb, and square

Inspect for cracks and confirm there are none

Verify the foundation variance does not exceed 1/2 inch out of level over 20 feet, with no ridges or depressions greater than 1/4 inch within any 32-inch measurement

Confirm foundation walls are no more than 1 inch out of level over the entire surface and no more than 1/2 inch out of square when measured along the diagonal of a 6x8x10-foot triangle at any corner

Fill all lines and pinholes

Inspect for honeycombs and ensure there are none

Break off all ties and fill all tie holes

Seal seams between the foundation and footing to be watertight

Ensure trenches are free and clear of all debris

Install anchor bolts 6 feet on center and no more than 12 inches from corners

Stack and protect all excess materials from weather

Clean the jobsite, ensuring all debris is removed, and relocate excess concrete to the driveway

Remove all formboards and stack them with excess material

Ensure field measurements match those on the Trade Contractors invoice