Shower Doors – Final Inspection Checklist for Home Builder
This checklist ensures that shower door installation is completed to quality and safety standards before the trade contractor leaves the jobsite. It emphasizes proper alignment, secure installation, and cleanliness of the work area. The process includes a thorough inspection of the installation area, verification of installation accuracy, and final cleanup to ensure the site is left in pristine condition.
Inspect windows to confirm they are intact and unbroken
Step 1: Visually inspect all bathroom windows
Walk around the bathroom and visually inspect each window for cracks, chips, or other signs of damage. Pay close attention to the corners and edges, as these areas are more prone to damage.
Step 2: Check window seals and frames
Examine the seals and frames of the windows to ensure they are intact and not compromised. This helps maintain the integrity of the window and prevents potential water leakage.
Ensure the shower stall is undamaged
Step 1: Inspect shower stall surfaces
Carefully inspect all surfaces of the shower stall, including walls, floor, and any fixtures, for chips, cracks, or other damage. Use a flashlight to check for any hidden imperfections.
Step 2: Verify the stability of the shower stall
Gently apply pressure to various parts of the shower stall to ensure it is stable and securely attached. Any movement or instability should be addressed before proceeding.
Install shower doors level, plumb, and square
Step 1: Use a level to check alignment
Place a level on the top and sides of the shower doors to ensure they are perfectly horizontal and vertical. Adjust as necessary to achieve the correct alignment.
Step 2: Secure doors with appropriate hardware
Use the specified screws and anchors to secure the shower doors in place. Ensure all fasteners are tightened properly to prevent future loosening.
Step 3: Check door operation
Open and close the shower doors several times to ensure smooth operation. Make any necessary adjustments to the hinges or tracks to eliminate sticking or misalignment.
Ensure shower doors are installed according to plan
Step 1: Review installation plans
Compare the installed shower doors with the project plans to ensure all specifications are met, including door type, size, and placement.
Step 2: Confirm compliance with local codes
Ensure that the installation complies with local building codes and regulations. This may include checking for proper clearances and safety features.
Clean the house, ensuring it is broom-swept
Step 1: Sweep the bathroom floor
Use a broom to sweep the entire bathroom floor, paying special attention to corners and under fixtures where dust and debris may accumulate.
Step 2: Wipe down all surfaces
Use a damp cloth to wipe down all surfaces, including countertops, fixtures, and the shower stall, to remove any dust or residue from the installation process.
Remove all debris to the designated area
Step 1: Collect all installation debris
Gather all debris, including packaging materials, excess sealant, and any leftover hardware, into a container or bag for disposal.
Step 2: Transport debris to designated disposal area
Carry the collected debris to the designated disposal area, ensuring that no waste is left behind in the work area. Follow any site-specific disposal protocols.
Conduct final inspection with client
Step 1: Schedule a walkthrough with the client
Coordinate with the client to schedule a convenient time for the final inspection. Ensure that all parties involved are present for the walkthrough.
Step 2: Review installation with the client
Walk through the completed installation with the client, explaining the work that was done and highlighting any features or details that may be of interest.
Step 3: Address any client concerns
Listen to any concerns or questions the client may have and address them promptly. Make note of any issues that require follow-up or additional work.
Document completion and obtain client sign-off
Step 1: Complete project documentation
Fill out all required documentation, including installation checklists, warranty information, and any other relevant paperwork.
Step 2: Obtain client signature
Present the completed documentation to the client for review and obtain their signature to confirm their satisfaction with the work.
Step 3: File documentation appropriately
Ensure that all signed documents are filed in the appropriate location for future reference. This may include both physical and digital filing systems.
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.