SOP Templates > Custom Home Construction > Siding and Cornice – Final Inspection Checklist

Siding and Cornice – Final Inspection Checklist

This checklist ensures that siding and cornice installation is completed to quality standards, with proper alignment, secure fastening, and no damage to materials. It also emphasizes thorough caulking and repair work, ensuring the site is clean and excess materials are properly stored before the trade contractor leaves.

Verify that all fasteners visible from the house interior are secured to framing members, and refasten any that have missed framing members

Repair and seal all broken insulation boards

Install siding according to the manufacturers instructions

Ensure siding is level and straight with no more than a 1/4-inch deviation over 10 feet

Verify that exterior trim is level, plumb, and undamaged

Ensure exterior trim is not split, broken, or has large knots or holes

Secure exterior trim tightly to framing members

Ensure gaps in exterior trim do not exceed 1/4 inch and have been caulked

Complete facia, rake boards, soffits, and soffit areas, ensuring all materials are undamaged with no holes, splits, broken boards, or large knots

Confirm that no siding boards are broken

Caulk and repair all holes, nicks, and gouges in siding

Clean the site, ensuring it is free of debris

Stack excess materials at the front of the lot