Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for Roof Replacement (Residential). Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your roof replacement projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Identify Key Stakeholders
• Identify all key stakeholders involved in the project
• Confirm availability of the client project manager lead foreman and any other critical team members
Step 2: Propose Meeting Times
• Prepare a list of potential meeting times
• Cross-check with stakeholder schedules for availability
Step 3: Send Meeting Invitations
• Send out calendar invites to all stakeholders
• Include a clear agenda for the kickoff meeting
Step 4: Confirm Meeting Details
• Follow up with stakeholders to confirm attendance
• Address any scheduling conflicts that arise
Step 5: Prepare Project Documents
• Compile necessary project documents including initial plans contracts and schedules
• Share these documents with attendees ahead of the meeting
Step 6: Verify Meeting Logistics
• Ensure that the meeting venue (virtual or physical) is ready
• Confirm necessary equipment like projectors or conference software
Step 7: Finalize Meeting Agenda
• Review the agenda to confirm all essential topics are covered
• Send a reminder email with finalized details to all attendees
Hold project kickoff meeting
Step 1: Introduce Project Team and Roles
• Introduce each key team member and outline their roles
• Provide contact information for each key role
Step 2: Review Project Scope and Goals
• Present the project’s main objectives
• Outline the key milestones and timelines
Step 3: Discuss Project Deliverables
• Go through each major deliverable and its timeline
• Highlight any critical constraints or risks
Step 4: Set Communication Protocols
• Establish the primary communication channels (e.g. email project management software)
• Define regular update meetings and reports
Step 5: Confirm Safety and Quality Requirements
• Outline safety guidelines and protocols
• Discuss quality standards and inspection processes
Step 6: Allow for Questions and Feedback
• Open the floor for questions or clarifications
• Document any concerns raised for follow-up
Step 7: Wrap Up and Recap Key Points
• Summarize the key points discussed
• Confirm action items and deadlines
Introduce client to project manager and key team members
Step 1: Schedule Client Introduction Meeting
• Determine a suitable time for the client introduction meeting
• Confirm availability of key team members
Step 2: Prepare a Team Overview Document
• Create a document that introduces each key team member and their role
• Include brief biographies and areas of responsibility
Step 3: Conduct Introduction Meeting
• Begin with introductions of each team member
• Highlight their specific contributions to the project
Step 4: Review Client Expectations
• Discuss client expectations for communication and project updates
• Set a cadence for regular meetings and touchpoints
Step 5: Outline Key Contact Information
• Provide direct contact information for the project manager and client liaison
• Confirm preferred contact methods and times
Step 6: Address Client Questions
• Allow time for the client to ask questions
• Note any specific client concerns for further action
Step 7: Confirm Next Steps
• Summarize key actions and upcoming meetings
• Reiterate project goals and objectives
Conduct detailed roof inspection and assessment
Step 1: Prepare Inspection Checklist
• Create a detailed checklist covering all aspects of the roof including structural integrity ventilation and drainage
• Review checklist items for completeness
Step 2: Gather Inspection Tools and PPE
• Ensure that all necessary tools such as moisture meters drones and ladders are available
• Verify that all personnel have the required personal protective equipment (PPE)
Step 3: Inspect Roof Exterior and Interior
• Conduct a visual inspection of the roof’s exterior for damage wear or leaks
• Check the interior for signs of moisture insulation issues or other structural concerns
Step 4: Document Findings with Photos and Notes
• Take clear photos of any damaged or suspect areas
• Record detailed notes regarding the condition and location of each issue
Step 5: Evaluate Roofing Materials
• Assess the condition and age of the roofing materials
• Identify areas where materials need repair or replacement
Step 6: Conduct Structural Assessments
• Evaluate the roof’s structural supports for integrity
• Check for signs of sagging warping or excessive wear
Step 7: Prepare Inspection Report
• Compile findings into a comprehensive report
• Include recommendations for repairs replacements or further inspections
Finalize project plans and specifications
Step 1: Review Initial Project Plans
• Go through the initial project plans and specifications in detail
• Verify that all project elements align with the client’s expectations
Step 2: Confirm Material Specifications
• Review the list of materials and their specifications
• Ensure all materials meet quality standards and project requirements
Step 3: Cross-Check Plans with Client Requirements
• Cross-reference final plans with client feedback or adjustments
• Identify any discrepancies or updates needed
Step 4: Verify Compliance with Regulations
• Confirm that plans adhere to all relevant codes and regulations
• Document any required permits or compliance checks
Step 5: Coordinate with Key Team Members
• Share finalized plans with the project manager and lead foreman
• Confirm understanding of key details and deadlines
Step 6: Obtain Client Approval
• Present the finalized plans and specifications to the client
• Obtain formal approval and document their acceptance
Step 7: Distribute Finalized Plans
• Distribute the approved plans to all relevant stakeholders
• Confirm that each stakeholder has the latest version of the project plans
Verify material pricing and lead times
Step 1: Review Material List
• Identify and verify the complete list of materials needed for the project
• Cross-check the list with project requirements and plans
Step 2: Contact Suppliers
• Contact primary and alternative suppliers
• Request updated pricing for all listed materials
Step 3: Confirm Availability
• Verify availability of all materials with each supplier
• Document any supply constraints or potential delays
Step 4: Document Lead Times
• Record lead times for each material based on supplier input
• Highlight critical items with longer lead times
Step 5: Review Pricing Quotes
• Analyze the received pricing quotes from suppliers
• Compare quotes against the project budget and expected costs
Step 6: Negotiate Terms
If necessary, negotiate pricing or terms to align with project budget
Step 7: Update Project Budget
Adjust the project budget based on confirmed material costs and lead times
Develop detailed project schedule
Step 1: Outline Project Phases
• Break the project into key phases, such as demolition, installation, and final inspection
• Ensure each phase includes specific goals and deliverables
Step 2: Identify Milestones
• Identify critical milestones within each project phase
• Set deadlines for each milestone based on project scope
Step 3: Assign Responsibilities
• Assign tasks to appropriate team members for each phase
• Define the roles and responsibilities for each team member
Step 4: Estimate Timeframes
• Estimate the time required to complete each task and milestone
• Account for potential delays in critical tasks
Step 5: Review Dependencies
• Identify dependencies between tasks, such as prerequisite tasks
• Address potential bottlenecks early in the planning phase
Step 6: such as prerequisite tasks * Address potential bottlenecks early in the planning phase
Develop a Timeline
Step 7: Create a comprehensive project timeline using project scheduling software
Review with Project Team
Step 8: * Present the schedule to the project team * Confirm that each team member understands their tasks and deadlines
Confirm client's final selections (materials colors etc.)
Step 1: Schedule Selection Review Meeting
Schedule a meeting with the client to review their final selections and preferences
Step 2: Prepare Selection Samples
• Prepare physical or digital samples of the chosen materials and colors
• Ensure samples are accessible during the meeting
Step 3: Review Each Selection
• Go through each selection with the client
• Confirm and note any changes requested by the client
Step 4: Discuss Alternatives if Needed
• If a selected item is unavailable, present alternative options
• Discuss the pros and cons of each alternative
Step 5: Document Final Selections
• Record the client’s final selections and obtain their written confirmation
• Update the selection records in the project management system
Step 6: Update Project Plans
• Incorporate the final selections into the project plans
• Verify that updated plans are distributed to all relevant stakeholders
Order materials and equipment
Step 1: Review Finalized Material List
• Review the finalized list of required materials and equipment
• Double-check quantities and specifications against project plans
Step 2: Place Orders with Suppliers
• Place orders with approved suppliers using verified pricing and lead times
• Confirm that all order details align with the project schedule
Step 3: Confirm Order Details
• Confirm the order details, including quantities and delivery schedules with each supplier
• Ensure delivery times are within acceptable windows
Step 4: Schedule Delivery Dates
• Coordinate and schedule delivery dates to align with project phases
• Adjust delivery schedules as needed based on project progress
Step 5: Track Order Status
• Monitor order status with each supplier
• Address any issues, such as delays or backorders, immediately
Step 6: Verify Order Confirmation
• Obtain written order confirmations from suppliers
• File all confirmations and related documentation in project records
Verify subcontractor availability and schedules (if applicable)
Step 1: Identify Required Subcontractors
• Identify all subcontractors needed for the project
• Verify that each subcontractor’s scope aligns with the project requirements
Step 2: Contact Subcontractors
• Reach out to each subcontractor to confirm their availability for the project timeline
Step 3: Review Subcontractor Schedules
• Review each subcontractor’s proposed schedule for alignment with the main project timeline
• Confirm that all work sequences are in the correct order
Step 4: Confirm Scope of Work
• Confirm each subcontractor’s scope of work, including their deliverables and deadlines
• Ensure they understand their responsibilities clearly
Step 5: Address Scheduling Conflicts
• Identify and address any scheduling conflicts or overlaps between subcontractors
• Adjust timelines and sequences to resolve issues
Step 6: Obtain Written Confirmations
• Obtain written confirmations from subcontractors on their availability and agreed schedules
• Document these confirmations in the project records
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Review Subcontractor Scope of Work
• Assess the proposed scope of work submitted by the subcontractor
• Ensure that it aligns with the project requirements, timelines, and quality standards
Step 2: Discuss Contractual Terms
• Meet with the subcontractor to discuss and negotiate key terms such as the payment schedule, deadlines, deliverables, and any contingencies
• Reach mutual agreements and document all agreed terms
Step 3: Finalize Payment and Deliverables Schedule
• Establish a clear payment schedule based on project milestones or completion percentages
• Define specific deliverables linked to each payment phase
Step 4: Prepare Subcontract Documents
• Draft the final subcontract agreement using the approved terms and conditions
• Include all supporting documents such as the finalized scope of work, payment schedules, and any special instructions
Step 5: Review Documents Internally
• Conduct a thorough internal review of the subcontract documents
• Verify that all project requirements, responsibilities, and legal terms are correctly included
Step 6: Seek Legal Approval (if necessary)
• Submit the subcontract documents to the legal team for approval
• Address any revisions suggested by the legal team
Step 7: Obtain Client Approval
• Present the finalized subcontract documents to the client
• Obtain written approval or feedback from the client
Obtain client signatures on subcontract (if applicable)
Step 1: Present Subcontract to Client
• Schedule a meeting with the client to present the finalized subcontract agreement
• Provide the client with a summary of key points for their review
Step 2: Explain Key Terms
• Review the essential terms of the subcontract with the client, including deadlines, payment schedules, and responsibilities
• Ensure that the client fully understands each key term
Step 3: Address Client Concerns
• Allow the client to ask questions and clarify any concerns they may have regarding the subcontract
• Document any changes requested by the client
Step 4: Obtain Client Signatures
• Guide the client through the signing process
• Ensure all necessary fields are completed correctly
Step 5: Review Signed Document
• Verify that all required signatures are present and correctly dated
• Double-check that all documents align with the project records
Step 6: Record and File Subcontract
• Record the signed subcontract in the project documentation system
• Store a physical and digital copy in secure project files
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Prepare Signed Copy
• Make a complete copy of the signed subcontract agreement
• Include any annexes or supporting documents
Step 2: Verify Accuracy
• Check that all copies include required signatures and dates
• Ensure no documents are missing from the subcontract package
Step 3: Send Copy to Subcontractor
• Send the signed subcontract agreement to the subcontractor through the agreed-upon delivery method (e.g., email, courier, or in person)
• Confirm that the document package is securely transmitted
Step 4: Confirm Receipt
• Request an acknowledgment of receipt from the subcontractor
• Keep a record of their confirmation for project documentation
Review permitting requirements
Step 1: Identify Required Permits
• List all required permits based on the project scope, location, and regulations
• Include permits for construction, electrical, plumbing, and any other relevant work
Step 2: Review Regulatory Guidelines
• Consult local, state, and federal regulatory guidelines to identify compliance requirements
• Document specific regulations that pertain to the project
Step 3: Contact Regulatory Authorities
• Reach out to local regulatory authorities to clarify any ambiguous requirements
• Establish a point of contact within each regulatory agency for future follow-ups
Step 4: Prepare Necessary Documents
• Compile and prepare all documents needed for permit applications, including project plans, safety documentation, and contractor licenses
• Ensure all documents are properly signed and dated
Step 5: Assign Responsibility
• Assign a team member to take responsibility for managing the permitting process
• Provide them with a checklist of permit requirements and timelines
Step 6: Set Permitting Timeline
• Establish a timeline for submitting permit applications and obtaining approvals
• Plan contingencies for delays in permit processing
Step 7: Set Permitting Timeline
• Establish a timeline for submitting permit applications and obtaining approvals
• Plan contingencies for delays in permit processing
Procure permit
Step 1: Submit Permit Applications
• Submit all required permit applications to the relevant regulatory authorities
• Include all supporting documents and pay necessary fees
Step 2: Track Permit Status
• Regularly monitor the status of each submitted permit application
• Document all updates in a central tracking system
Step 3: Follow Up with Authorities
• Proactively follow up with regulatory authorities to address any pending issues or delays
• Respond promptly to any requests for additional information
Step 4: Obtain Approved Permits
• Collect all approved permits and verify their validity
• Confirm that each permit includes correct project details and approval dates
Step 5: File and Distribute Permits
• File copies of the approved permits in the project records
• Distribute copies to key stakeholders such as the project manager and site supervisor
Create site safety plan
Step 1: Conduct Risk Assessment
• Identify potential hazards specific to the job site and project scope
• Assess the level of risk for each identified hazard
Step 2: Establish Safety Protocols
• Define safety protocols for each identified risk
• Include emergency response procedures and first aid measures
Step 3: Develop Safety Training Plan
• Create a training plan covering key safety protocols for all workers
• Schedule safety training sessions prior to project commencement
Step 4: Assign Safety Responsibilities
• Assign a site safety officer to oversee daily safety measures
• Designate team members responsible for specific safety tasks
Step 5: Plan Safety Equipment Deployment
• List and procure necessary safety equipment, such as harnesses, warning signs, and first aid kits
• Allocate equipment to designated areas on-site
Step 6: Document Safety Plan
• Prepare a comprehensive site safety plan document
• Include site maps, safety protocols, and emergency contact information
Step 7: Review and Approve Plan
• Review the safety plan with key stakeholders
• Obtain approval from the project manager or safety officer
Create fall protection plan
Step 1: Identify Fall Hazards
• Conduct a site assessment to identify areas where falls could occur
• Focus on roof edges, skylights, ladders, and scaffolding
Step 2: Select Fall Protection Systems
• Choose appropriate fall protection systems such as guardrails, safety nets, or personal fall arrest systems
• Ensure systems comply with OSHA regulations
Step 3: Develop Fall Protection Procedures
• Create step-by-step procedures for the safe use of fall protection systems
• Include guidelines for inspection and maintenance
Step 4: Train Workers on Fall Protection
• Schedule mandatory training sessions for all workers on fall prevention measures
• Provide hands-on demonstrations of equipment usage
Step 5: Assign Fall Safety Monitors
• Designate experienced team members as fall safety monitors
• Instruct monitors on their duties and responsibilities
Step 6: Implement Inspection Schedule
• Establish a regular inspection schedule for all fall protection equipment
• Document inspections and report any issues immediately
Step 7: Review and Update Fall Protection Plan
• Review the fall protection plan periodically for effectiveness
• Make necessary updates based on project changes or incidents
Establish project communication plan
Step 1: Identify Communication Channels
• Determine the primary channels for project communication, such as email, project management software, and meetings
• Decide on secondary channels for urgent communications
Step 2: Assign Communication Roles
• Assign roles to key team members responsible for communicating specific updates
• Ensure each role is clear and documented
Step 3: Set Communication Protocols
• Establish protocols for reporting issues, updates, and progress
• Define the frequency and format of communications, such as daily check-ins or weekly reports
Step 4: Create Meeting Schedule
• Plan a regular schedule for key meetings, including kickoff, status, and review meetings
• Outline the agenda and goals for each meeting
Step 5: Establish Document Sharing Procedures
• Define procedures for sharing and storing project documents
• Choose a central repository for project files and set access permissions
Step 6: Develop Emergency Communication Plan
• Create a protocol for emergency communications, such as accidents or critical project changes
• Provide contact information for emergency roles
Step 7: Review and Confirm Plan
• Present the communication plan to the project team and stakeholders
• Confirm that all members understand their responsibilities and protocols
Prepare equipment for mobilization
Step 1: Inspect Equipment Condition
• Conduct a detailed inspection of all equipment to ensure it’s in good working order
• Record any issues or maintenance requirements
Step 2: Schedule Maintenance and Repairs
• Perform or schedule necessary maintenance and repairs for all equipment
• Document completed maintenance tasks and update equipment logs
Step 3: Organize Equipment by Phase
• Arrange equipment based on the sequence of project phases
• Ensure that critical equipment is readily accessible for initial phases
Step 4: Verify Equipment Safety Features
• Check that all safety features, such as alarms and safety locks, are functioning correctly
• Test backup systems for critical equipment
Step 5: Secure Transport Logistics
• Coordinate transportation for heavy equipment and tools to the job site
• Ensure that all equipment is securely loaded and protected during transport
Step 6: Create Equipment Inventory List
• Prepare a detailed inventory list of all mobilized equipment
• Include serial numbers, quantities, and assigned team members for each item
Step 7: Communicate Equipment Plan to Team
• Share the equipment mobilization plan with the project team
• Confirm that all members understand their roles and responsibilities
Prepare site for construction
Step 1: Set Up Site Access Control
• Establish entry and exit points for workers and equipment
• Implement security measures such as fencing and access badges
Step 2: Install Temporary Facilities
• Set up temporary facilities like restrooms, break areas, and tool storage
• Ensure these facilities are compliant with safety regulations
Step 3: Mark Work Zones and Hazards
• Clearly mark work zones and potential hazards using signage and barriers
• Designate areas for specific tasks, like materials storage and waste disposal
Step 4: Prepare Site Utilities
• Arrange for temporary utilities, such as power, water, and lighting
• Verify that utility setups are safe and adequate for project needs
Step 5: Conduct Initial Safety Walkthrough
• Perform a walkthrough of the site with the safety officer to identify any safety issues
• Address and document issues that need immediate correction
Step 6: Verify Environmental Protection Measures
• Install environmental protection measures, such as erosion controls or dust suppression
• Confirm that all measures are in compliance with regulations
Step 7: Review Site Readiness with Team
• Hold a meeting with the project team to review site readiness
• Confirm that all members are aware of their initial tasks and responsibilities
Conduct final pre-construction review meeting
Step 1: Review Project Scope and Objectives
• Reiterate the project scope and primary objectives to the team
• Ensure all members understand their roles and responsibilities
Step 2: Confirm Permits and Compliance
• Verify that all required permits have been obtained and are up to date
• Review compliance measures and documentation
Step 3: Discuss Safety and Quality Standards
• Reaffirm safety guidelines and protocols with the team
• Highlight quality standards and inspection processes
Step 4: Confirm Resource Availability
• Check the availability of materials, equipment, and personnel for the project start date
• Address any resource-related concerns
Step 5: Review Communication Protocols
• Go over the established communication plan, including reporting schedules and emergency contacts
• Confirm that all team members are clear on communication channels
Step 6: Establish Initial Task Assignments
• Assign the first set of tasks to team members based on the project schedule
• Provide any necessary resources or support for task completion
Step 7: Open the Floor for Questions
• Allow team members to ask questions or raise concerns
• Document any key issues or action items for follow-up
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.