Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for New Construction (Commercial) Roofing. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your commercial roofing projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Identify Participants
- List all key participants who need to attend the project kickoff meeting
- Include internal team members the GC subcontractors and any other relevant stakeholders
Step 2: Propose Meeting Times
- Contact all participants to propose three potential dates and times for the meeting
- Ensure the proposed times are within normal business hours and convenient for all parties
Step 3: Confirm Availability
- Wait for responses from all participants and confirm a mutually convenient time
- If the initial suggestions dont work propose alternative dates
Step 4: Send Confirmation
- Send a calendar invitation to all participants with the confirmed date time and location (or virtual meeting link)
- Include a brief agenda outlining the purpose of the meeting
Step 5: Prepare Agenda
- Draft an agenda covering key points to discuss during the meeting such as project scope roles and responsibilities timelines and any initial concerns
- Share the agenda with all participants ahead of the meeting
Step 6: Gather Necessary Documents
- Collect all relevant materials or documents needed for the meeting including project plans initial schedules and any supporting information
- Ensure all documents are up-to-date and accurately reflect the project details
Step 7: Notify Internal Team Members
- Inform any internal team members who need to attend the meeting
- Brief them on their roles and the key points to discuss
Step 8: Confirm Meeting Details with GC
- Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes
- Ensure the GC has all the necessary information and is prepared for the meeting
Step 9: Set Up Meeting Space
- If the meeting is in-person ensure the meeting room is booked and properly set up
- If the meeting is virtual test the online meeting platform to ensure it is working correctly
Step 10: Document the Process
- Record the scheduled meeting details in your CRM or project management system
- Set reminders for the meeting and any follow-up tasks
Hold project kickoff meeting
Step 1: Prepare Meeting Materials
- Ensure all necessary materials are prepared and organized including project plans schedules and any supporting documents
- Bring copies of these materials for all participants or ensure digital access if the meeting is virtual
Step 2: Set Up Meeting Space
- Arrive early to set up the meeting space if the meeting is in-person
- Ensure all equipment such as projectors or video conferencing tools is functioning properly
Step 3: Introduce Participants
- Begin the meeting by introducing yourself and any team members present
- Allow each participant to briefly introduce themselves and their role in the project
Step 4: Outline Meeting Agenda
- Review the meeting agenda to set expectations and ensure all key points will be covered
- Clarify the objectives of the meeting and the desired outcomes
Step 5: Discuss Project Scope and Objectives
- Present an overview of the project scope goals and objectives
- Highlight the key deliverables and success criteria for the project
Step 6: Review Roles and Responsibilities
- Clarify the roles and responsibilities of each team member and stakeholder
- Ensure everyone understands their tasks and how they contribute to the projects success
Step 7: Present Project Timeline
- Walk through the project timeline including key milestones and deadlines
- Discuss any potential challenges or critical paths that may impact the schedule
Step 8: Address Questions and Concerns
- Encourage participants to ask questions and express any concerns they may have
- Provide clear and concise answers to ensure everyone is on the same page
Step 9: Summarize Key Points and Next Steps
- Summarize the main points discussed during the meeting
- Outline the next steps and any immediate actions required from the participants
Step 10: Document Meeting Minutes
- Record detailed minutes of the meeting capturing all key discussions decisions and action items
- Distribute the meeting minutes to all participants and relevant stakeholders
Introduce client and General Contractor (GC) to project manager and key team members
Step 1: Schedule an Introduction Meeting with Client and GC
- Coordinate with the client and GC to schedule an introduction meeting with the project manager and key team members
- Confirm a date and time that works for all participants
Step 2: Prepare and Share an Introduction Agenda
- Prepare an agenda for the meeting, including key topics such as team introductions, project overview, and role clarification
- Share the agenda with all participants at least 24 hours before the meeting
Step 3: Begin the Meeting with Team Introductions
- Start the meeting by introducing the client, GC, project manager, and key team members
- Provide a brief background of each persons role and responsibilities
Step 4: Present an Overview of the Project and Team Structure
- Present an overview of the project, including its objectives, key deliverables, and timelines
- Outline the project team structure and communication hierarchy
Step 5: Clarify the Roles and Responsibilities of Each Key Member
- Clarify the roles and responsibilities of each key team member, focusing on areas of client and GC interaction
- Confirm the primary point of contact for each party involved
Step 6: Establish Communication Channels and Points of Contact
- Establish clear communication channels and confirm the main points of contact for the client and GC
- Ensure that everyone understands the preferred methods of communication and reporting frequency
Step 7: Document and Distribute Meeting Notes
- Document key introductions, roles, and communication protocols discussed during the meeting
- Distribute meeting notes to all participants for reference
Conduct detailed site assessment
Step 1: Prepare for the Site Visit
- Review all available project plans site maps and relevant documentation specific to the roofing project
- Ensure you have the necessary tools and equipment for the assessment such as measuring tapes cameras ladders and safety gear (e.g. harnesses helmets)
Step 2: Schedule the Site Visit
- Coordinate with the GC and any necessary team members to schedule the site visit
- Confirm the date time and location and ensure all participants are informed
Step 3: Conduct Initial Walkthrough
- Upon arrival conduct an initial walkthrough of the site to get an overall sense of the building and roof area
- Identify key areas to focus on during the detailed assessment
Step 4: Inspect Roof Condition
- Thoroughly inspect the current condition of the roof
- Look for signs of wear and tear damage leaks and any areas that may need repair or replacement
Step 5: Take Detailed Measurements
- Measure key areas of the roof including dimensions slope and pitch
- Record the measurements of roof sections penetrations (such as chimneys and skylights) and any other relevant features
Step 6: Document Roof Materials
- Identify and document the existing roofing materials (e.g. shingles tiles metal etc.)
- Note the condition and type of underlayment flashing and gutters
Step 7: Capture Photographs and Videos
- Take clear photographs and videos of the roofs condition including close-ups of any damage or areas of concern
- Ensure you capture multiple angles and perspectives to provide a comprehensive visual record
Step 8: Identify Potential Challenges
- Adjust the project budget and schedule based on the verified material costs and lead times
- Ensure all changes are documented and communicated to the relevant team members
Step 9: Consult with Team Members
- Ensure all team members understand the master schedule and their responsibilities
- Address any questions or clarifications needed to ensure alignment
Step 10: Summarize Findings
- Set reminders to periodically check for any updates or changes to the master schedule from the GC
- Ensure the project team stays informed of any modifications
Review and confirm project plans and specifications
Step 1: Organize and Prepare All Relevant Project Documents
- Gather and organize all relevant project documents, including plans, drawings, specifications, and client-approved changes
- Ensure that the latest versions of all documents are available for review
Step 2: Schedule a Review Meeting with Key Stakeholders
- Schedule a review meeting with key stakeholders, such as the project manager, design team, and client representatives
- Confirm the meeting date, time, and agenda with all participants
Step 3: Conduct a Section-by-Section Review of Project Plans
- Review the project plans section by section, focusing on critical areas such as design elements, technical specifications, and construction methods
- Confirm that all project requirements are clearly defined and achievable
Step 4: Verify Compliance with Client Requirements and Regulations
- Cross-check the project plans and specifications against client requirements and relevant regulations
- Identify any discrepancies or compliance issues that need to be addressed
Step 5: Confirm Alignment of Plans with Site Conditions
- Ensure that the project plans align with the current site conditions and constraints identified during the site assessment
- Make any necessary adjustments to the plans based on the assessment findings
Step 6: Document Agreed Changes or Updates to the Project Plans
- Document any changes or updates agreed upon during the review meeting and update the project plans accordingly
- Obtain client approval on any modifications made to the original plans
Step 7: Distribute Finalized Project Plans to All Team Members
- Distribute the finalized and client-approved project plans to all relevant team members for implementation
- Save the final version of the plans in the project records for reference
Verify material pricing and lead times
Step 1: Review Project Requirements
- Examine the project scope and identify all materials required for the roofing project
- Ensure you have a comprehensive list of materials with specifications
Step 2: Contact Suppliers
- Reach out to multiple suppliers to request current pricing and lead times for the required materials
- Ensure you provide detailed specifications to get accurate quotes
Step 3: Compare Quotes
- Collect and compare quotes from different suppliers
- Evaluate the pricing lead times and any additional terms or conditions
Step 4: Verify Lead Times
- Confirm the lead times provided by each supplier
- Ensure the lead times align with the project schedule and identify any potential delays
Step 5: Check Supplier Reliability
- Assess the reliability of each supplier based on past performance references and reviews
- Ensure they can consistently meet the required delivery schedules
Step 6: Negotiate Terms
- If necessary negotiate better pricing or lead times with the preferred suppliers
- Discuss bulk purchasing discounts or expedited shipping options
Step 7: Document Findings
- Record the verified pricing and lead times for each material
- Include supplier contact information quotes and any negotiated terms
Step 8: Update Project Budget and Schedule
- Inform the project team of the ordered materials and equipment
- Provide details on expected delivery dates and any special handling instructions
Develop detailed project schedule
Step 1: Outline Project Phases
- Break the project into key phases, such as demolition, installation, and final inspection
- Ensure each phase includes specific goals and deliverables
Step 2: Identify Milestones
- Identify critical milestones within each project phase
- Set deadlines for each milestone based on project scope
Step 3: Assign Responsibilities
- Assign tasks to appropriate team members for each phase
- Define the roles and responsibilities for each team member
Step 4: Estimate Timeframes
- Estimate the time required to complete each task and milestone
- Account for potential delays in critical tasks
Step 5: Review Dependencies
- Identify dependencies between tasks, such as prerequisite tasks
- Address potential bottlenecks early in the planning phase, such as prerequisite tasks
- Address potential bottlenecks early in the planning phase
Step 6: Develop a Timeline
- Create a comprehensive project timeline using project scheduling software
Step 7: Review with Project Team
- Present the schedule to the project team
- Confirm that each team member understands their tasks and deadlines
Request master schedule from GC
Step 1: Prepare Request Details
- Identify the specific information needed from the master schedule such as key milestones deadlines and critical path activities relevant to the roofing project
- Ensure you have a clear understanding of the project scope and requirements
Step 2: Draft Request for Master Schedule
- Write a clear and concise request for the master schedule
- Include a brief explanation of why the schedule is needed and specify any particular details you require
Step 3: Contact the GC
- Send the request to the GC via email or your preferred communication platform
- Ensure you use the correct contact information and address the request to the appropriate person
Step 4: Follow Up
- If no response is received within a few days follow up with a polite reminder
- Ensure the follow-up is documented and maintains a professional tone
Step 5: Receive the Master Schedule
- Once the GC provides the master schedule acknowledge receipt promptly
- Thank the GC for their cooperation and confirm that you have received the document
Step 6: Review the Master Schedule
- Examine the master schedule to ensure it includes all the necessary details
- Identify any potential conflicts or critical dates that impact the roofing project
Step 7: Share with Relevant Team Members
- Distribute the master schedule to internal team members and any relevant subcontractors
- Ensure everyone involved in the project is informed and aware of the key milestones
Step 8: Document the Schedule
- Organize fall protection training sessions for all team members
- Ensure everyone understands the fall protection plan the use of equipment and their individual responsibilities
Step 9: Confirm Understanding
Step 10: Monitor for Updates
Confirm client's final selections (materials, colors, etc.)
Step 1: Review Clients Preferences and Requirements
- Review the clients preferences and requirements for materials, colors, and other selections based on initial discussions and discovery meetings
- Ensure that all preferences are documented accurately
Step 2: Present Material and Color Options
- Present the client with a selection of materials and colors that align with their preferences
- Provide samples or visual aids to help the client visualize their options
Step 3: Confirm Final Selections with Client
- Confirm the clients final selections for materials, colors, and finishes
- Clarify any questions or concerns they have about their choices
Step 4: Document Final Selections
- Document the clients final selections in the project records, including material specifications, colors, and any custom options
- Include confirmation of the clients approval in writing or via email
Step 5: Verify Availability with Suppliers
- Verify the availability of the selected materials with suppliers
- Confirm lead times and any potential delays in the delivery of custom or special-order items
Step 6: Communicate Final Selections to Project Team
- Communicate the clients final selections to the project team, including the project manager and procurement personnel
- Ensure that everyone involved is aware of the clients choices and any special requirements
Step 7: Prepare to Order Selected Materials
- Prepare to place orders for the confirmed materials based on the clients selections
- Confirm that all necessary specifications are included in the order documentation
Order materials and equipment
Step 1: Review Final Selections and Project Requirements
- Examine the GCs final selections and the project requirements
- Ensure you have a comprehensive list of all materials and equipment needed for the roofing project
Step 2: Verify Supplier Information
- Confirm the contact details and ordering procedures for preferred suppliers
- Ensure you have up-to-date information on pricing lead times and availability
Step 3: Prepare Purchase Orders
- Draft purchase orders (POs) for all required materials and equipment
- Include detailed specifications quantities and any specific delivery instructions
Step 4: Obtain Internal Approvals
- If necessary seek internal approvals for the purchase orders
- Ensure all relevant stakeholders sign off on the orders before proceeding
Step 5: Place Orders with Suppliers
- Submit the purchase orders to the selected suppliers via email phone or online ordering system
- Ensure you receive confirmation of receipt from each supplier
Step 6: Confirm Delivery Schedules
- Verify the delivery schedules provided by the suppliers
- Ensure the delivery dates align with the project schedule and adjust if necessary
Step 7: Track Order Status
- Monitor the status of each order to ensure timely delivery
- Follow up with suppliers if there are any delays or issues with the order
Step 8: Notify Project Team
Verify subcontractor availability and schedules (if applicable)
Step 1: Identify Required Subcontractors
- Identify all subcontractors needed for the project
- Verify that each subcontractors scope aligns with the project requirements
Step 2: Contact Subcontractors
- Reach out to each subcontractor to confirm their availability for the project timeline
Step 3: Review Subcontractor Schedules
- Review each subcontractors proposed schedule for alignment with the main project timeline
- Confirm that all work sequences are in the correct order
Step 4: Confirm Scope of Work
- Confirm each subcontractors scope of work, including their deliverables and deadlines
- Ensure they understand their responsibilities clearly
Step 5: Address Scheduling Conflicts
- Identify and address any scheduling conflicts or overlaps between subcontractors
- Adjust timelines and sequences to resolve issues
Step 6: Obtain Written Confirmations
- Obtain written confirmations from subcontractors on their availability and agreed schedules
- Document these confirmations in the project records
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Review Subcontractor Scope of Work
- Assess the proposed scope of work submitted by the subcontractor
- Ensure that it aligns with the project requirements, timelines, and quality standards
Step 2: Discuss Contractual Terms
- Meet with the subcontractor to discuss and negotiate key terms such as the payment schedule, deadlines, deliverables, and any contingencies
- Reach mutual agreements and document all agreed terms
Step 3: Finalize Payment and Deliverables Schedule
- Establish a clear payment schedule based on project milestones or completion percentages
- Define specific deliverables linked to each payment phase
Step 4: Prepare Subcontract Documents
- Draft the final subcontract agreement using the approved terms and conditions
- Include all supporting documents such as the finalized scope of work, payment schedules, and any special instructions
Step 5: Review Documents Internally
- Conduct a thorough internal review of the subcontract documents
- Verify that all project requirements, responsibilities, and legal terms are correctly included
Step 6: Seek Legal Approval (if necessary)
- Submit the subcontract documents to the legal team for approval
- Address any revisions suggested by the legal team
Step 7: Obtain Client Approval
- Thank the client, GC, and subcontractor for their time and cooperation in finalizing the subcontract
- Confirm the next steps in the project and any follow-up actions needed
Obtain client and GC signatures on subcontract (if applicable)
Step 1: Arrange a Meeting to Review and Sign the Subcontract
- Arrange a meeting with the client, GC, and subcontractor to review and sign the subcontract documents
- Confirm the date, time, and location of the meeting with all parties involved
Step 2: Provide Copies of the Subcontract for Review
- Provide copies of the subcontract documents to the client, GC, and subcontractor in advance of the meeting
- Encourage them to review the documents thoroughly and prepare any questions
Step 3: Review Key Terms and Responsibilities During the Meeting
- During the meeting, review the key terms, responsibilities, and expectations outlined in the subcontract
- Address any questions or concerns raised by the client, GC, or subcontractor
Step 4: Obtain Signatures from All Relevant Parties
- Obtain signatures from all relevant parties, including the client, GC, and subcontractor
- Ensure that all required pages are signed and dated correctly
Step 5: Verify Identification and Authorization for Signing
- Verify that the individuals signing the subcontract have the necessary authorization to do so
- Obtain additional identification or documentation if required for legal purposes
Step 6: Witness and Acknowledge the Subcontract Signing
- Act as a witness to the subcontract signing if required, and acknowledge the signing date and time
- Ensure that all parties have completed the signing process properly
Step 7: Thank All Parties for Finalizing the Subcontract
- Document the approved permits in the project records and communicate the approvals to the project team
- Update the project schedule and notify key stakeholders of authorized activities
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Prepare Signed Copy
- Make a complete copy of the signed subcontract agreement
- Include any annexes or supporting documents
Step 2: Verify Accuracy
- Check that all copies include required signatures and dates
- Ensure no documents are missing from the subcontract package
Step 3: Send Copy to Subcontractor
- Send the signed subcontract agreement to the subcontractor through the agreed-upon delivery method (e.g., email, courier, or in person)
- Confirm that the document package is securely transmitted
Step 4: Confirm Receipt
- Request an acknowledgment of receipt from the subcontractor
- Keep a record of their confirmation for project documentation
Review permitting requirements
Step 1: Identify Required Permits
- Determine the types of permits required for the roofing project such as building permits zoning permits or environmental permits
- Consult local building codes and regulations to ensure compliance
Step 2: Contact Local Authorities
- Reach out to local building departments or permitting authorities to confirm the specific requirements for your project
- Obtain information on application procedures necessary documentation and associated fees
Step 3: Create a Permit Checklist
- Develop a checklist outlining all the permits needed and the corresponding documentation for each
- Include deadlines for submission and any special conditions that must be met
Procure necessary permits
Step 1: Identify All Permits Required for the Project
- Review the project scope and legal requirements to identify all necessary permits for construction activities
- Confirm specific permit requirements based on local regulations, zoning laws, and project specifications
Step 2: Prepare All Permit Applications and Supporting Documents
- Gather all required forms, supporting documents, and details for each permit application, such as project plans, environmental reports, and fee payments
- Ensure that all forms are accurately completed and signed by authorized personnel
Step 3: Submit Permit Applications to Relevant Authorities
- Submit the completed permit applications to the relevant local authorities or permitting agencies
- Follow each authoritys specific guidelines for submission, including digital or physical documentation
Step 4: Track the Processing Status of Permit Applications
- Designate safety roles and responsibilities to team members
- Ensure each person understands their duties such as safety monitoring first aid and equipment inspections
Step 5: Address Any Requests for Additional Information or Revisions
- Designate fall protection responsibilities to team members
- Ensure each person understands their duties such as inspecting equipment setting up fall protection systems and monitoring compliance
Step 6: Obtain Approval and Collect the Necessary Permits
- List all required personal protective equipment (PPE) for fall protection such as harnesses lanyards and anchor points
- Ensure all team members are trained on the proper use and maintenance of PPE
Step 7: Document and Communicate Permit Approvals to Project Team
- Develop feedback mechanisms to allow team members and stakeholders to provide input and ask questions
- Ensure there is a process for addressing and responding to feedback promptly
Create site safety plan
Step 1: Identify Potential Hazards
- Conduct a thorough assessment of the roofing site to identify potential hazards
- Consider factors such as fall risks weather conditions electrical hazards and material handling
Step 2: Review Safety Regulations
- Review relevant safety regulations and standards such as OSHA guidelines for roofing work
- Ensure your safety plan complies with all legal requirements
Step 3: Define Safety Procedures
- Develop specific safety procedures to address the identified hazards
- Include fall protection measures proper use of personal protective equipment (PPE) safe material handling practices and emergency response procedures
Step 4: Assign Safety Roles and Responsibilities
- Develop specific procedures for safe work practices to prevent falls
- Include guidelines for using fall protection equipment accessing and egressing the roof and working near roof edges
Step 5: Develop a Site Layout Plan
- Ensure all communication channels are set up and functioning properly
- Provide access and training to all team members on how to use the chosen communication tools
Step 6: Specify PPE Requirements
- Establish a clear flow of information to ensure that updates and important messages reach all relevant stakeholders
- Specify how information will be documented shared and stored
Step 7: Establish Communication Protocols
- Document the finalized site logistics plan and distribute it to all relevant parties, including the GC, subcontractors, and the project team
- Save a copy in the project records and review it regularly to address any changes
Step 8: Include Emergency Procedures
Step 9: Conduct Safety Training
Step 10: Document and Distribute the Plan
Create fall protection plan
Step 1: Create fall protection plan
- Conduct a thorough assessment of the roofing site to identify potential fall hazards
- Focus on areas such as roof edges skylights roof openings and ladders
Step 2: Review Regulatory Requirements
- Review relevant fall protection regulations and standards such as OSHA guidelines for roofing work
- Ensure your fall protection plan complies with all legal requirements
Step 3: Select Appropriate Fall Protection Systems
- Determine the most suitable fall protection systems for the identified hazards
- Options may include guardrails safety nets personal fall arrest systems and warning line systems
Step 4: Define Safe Work Procedures
- Create standardized templates for common communication needs such as project updates meeting agendas and safety alerts
- Ensure templates are clear concise and easy to use
Step 5: Assign Responsibilities
- Establish protocols for site access, including entry and exit points, visitor controls, and traffic management
- Coordinate with the GC to assign responsibilities for monitoring and enforcing these protocols
Step 6: Specify PPE Requirements
- Confirm waste management and clean-up procedures with the GC and subcontractors, including waste disposal schedules and recycling requirements
- Ensure that everyone understands their responsibilities for maintaining a clean and safe site
Step 7: Develop Rescue Procedures
- Share the equipment mobilization plan with the project team
- Confirm that all members understand their roles and responsibilities
Step 8: Conduct Fall Protection Training
Step 9: Install Fall Protection Systems
Step 10: Inspect and Maintain Equipment
Establish project communication plan
Step 1: Identify Communication Needs
- Determine the communication needs for the project including the types of information that need to be shared such as project updates schedule changes and safety alerts
- Consider the stakeholders involved such as the project team subcontractors and the GC
Step 2: Define Communication Methods
- Select the appropriate communication methods for the project such as email phone calls text messages project management software and in-person meetings
- Ensure the chosen methods are accessible and convenient for all stakeholders
Step 3: Establish Communication Schedule
- Create a communication schedule that outlines when and how often updates and meetings will occur
- Include regular progress meetings daily briefings and emergency communication protocols
Step 4: Develop Standardized Templates
- Discuss equipment usage and scheduling to avoid conflicts between subcontractors, such as crane operations, heavy machinery, and scaffolding
- Confirm that all equipment will be available and accessible as needed
Step 5: Set Up Communication Channels
- Coordinate transportation for heavy equipment and tools to the job site
- Ensure that all equipment is securely loaded and protected during transport
Step 6: Define Information Flow
- Prepare a detailed inventory list of all mobilized equipment
- Include serial numbers, quantities, and assigned team members for each item
Step 7: Implement Feedback Mechanisms
- Hold a meeting with the project team to review site readiness
- Confirm that all members are aware of their initial tasks and responsibilities
Step 8: Conduct Communication Training
Step 9: Monitor and Adjust the Plan
Coordinate site logistics with GC and other subcontractors
Step 1: Schedule a Logistics Coordination Meeting with GC and Subcontractors
- Schedule a meeting with the GC and key subcontractors to coordinate site logistics, such as material deliveries, equipment usage, and site access
- Confirm the meeting date, time, and location with all participants
Step 2: Create a Site Logistics Plan and Agenda for the Meeting
- Prepare a site logistics plan that includes key elements such as staging areas, equipment storage, delivery schedules, and waste management
- Draft an agenda for the meeting to ensure all key points are discussed
Step 3: Review and Confirm Material Delivery and Storage Areas
- Review and confirm designated areas for material delivery, storage, and staging with the GC and subcontractors
- Identify any access restrictions or special handling requirements for specific materials
Step 4: Discuss Equipment Usage and Scheduling to Avoid Conflicts
- Check that all safety features, such as alarms and safety locks, are functioning correctly
- Test backup systems for critical equipment
Step 5: Establish Protocols for Site Access and Traffic Management
- Perform a walkthrough of the site with the safety officer to identify any safety issues
- Address and document issues that need immediate correction
Step 6: Confirm Waste Management and Clean-Up Procedures
- Install environmental protection measures, such as erosion controls or dust suppression
- Confirm that all measures are in compliance with regulations
Step 7: Document and Distribute the Site Logistics Plan to All Parties
- Summarize the key takeaways from the meeting, including confirmed plans, updated timelines, and action items for each stakeholder
- Distribute meeting minutes to all participants and update project records accordingly
Prepare equipment for mobilization
Step 1: Inspect Equipment Condition
- Conduct a detailed inspection of all equipment to ensure its in good working order
- Record any issues or maintenance requirements
Step 2: Schedule Maintenance and Repairs
- Perform or schedule necessary maintenance and repairs for all equipment
- Document completed maintenance tasks and update equipment logs
Step 3: Organize Equipment by Phase
- Arrange equipment based on the sequence of project phases
- Ensure that critical equipment is readily accessible for initial phases
Step 4: Verify Equipment Safety Features
- Arrange for temporary utilities, such as power, water, and lighting
- Verify that utility setups are safe and adequate for project needs
Step 5: Secure Transport Logistics
- Review the site safety plan and any compliance requirements that need to be followed during construction
- Ensure that all stakeholders understand their roles and responsibilities related to safety and compliance
Step 6: Create Equipment Inventory List
- Invite stakeholders to ask questions or raise concerns about any aspect of the project, such as logistics, resource availability, or scheduling conflicts
- Provide clear answers and document any agreed-upon changes
Step 7: Communicate Equipment Plan to Team
Prepare site for construction
Step 1: Set Up Site Access Control
- Establish entry and exit points for workers and equipment
- Implement security measures such as fencing and access badges
Step 2: Install Temporary Facilities
- Set up temporary facilities like restrooms, break areas, and tool storage
- Ensure these facilities are compliant with safety regulations
Step 3: Mark Work Zones and Hazards
- Clearly mark work zones and potential hazards using signage and barriers
- Designate areas for specific tasks, like materials storage and waste disposal
Step 4: Prepare Site Utilities
- Review the project plans in detail, highlighting critical milestones, dependencies, and deadlines
- Confirm that the project schedule aligns with the expectations of all stakeholders
Step 5: Conduct Initial Safety Walkthrough
Step 6: Verify Environmental Protection Measures
Step 7: Review Site Readiness with Team
Conduct final pre-construction review meeting with GC and key stakeholders
Step 1: Schedule the Pre-Construction Review Meeting
- Schedule the final pre-construction review meeting with the General Contractor (GC) and key stakeholders, including project managers, subcontractors, and client representatives
- Confirm the date, time, and location of the meeting with all participants
Step 2: Prepare an Agenda and Relevant Documents for the Meeting
- Prepare an agenda for the meeting that includes key topics such as project plans, timelines, safety protocols, and stakeholder responsibilities
- Gather all relevant documents, such as project schedules, permits, and safety plans, to present at the meeting
Step 3: Begin the Meeting with Introductions and Objectives
- Start the meeting by introducing all participants and outlining the objectives of the pre-construction review
- Confirm that everyone understands the purpose of the meeting and the key outcomes to be achieved
Step 4: Review Project Plans, Timelines, and Key Milestones
Step 5: Discuss Safety Protocols and Compliance Requirements
Step 6: Address Any Open Questions or Concerns from Stakeholders
Step 7: Summarize Key Takeaways and Confirm Next Steps
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.