Construction Workflow
Welcome to the Construction Workflow SOP Template Library for New Construction Residential Roofing. Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final installation, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Notify Roofing Crew
• Inform all roofing crew members of the mobilization schedule
• Confirm the date time and location for assembling at the project site
Step 2: Transport Equipment to Site
• Arrange transportation for all necessary roofing equipment and tools
• Ensure all equipment is securely loaded and transported safely to the site
Step 3: Conduct Site Orientation
• Upon arrival conduct a brief site orientation with the crew
• Review the site layout access points and designated areas for equipment storage
Step 4: Set Up Equipment Storage Area
• Designate a secure area for storing roofing equipment and materials
• Ensure the area is organized and easily accessible for the crew
Step 5: Inspect Equipment
• Check all roofing equipment and tools to ensure they are in good working condition
• Perform any necessary maintenance or repairs before use
Step 6: Assemble Roofing Equipment
• Set up all required roofing equipment such as ladders scaffolding and safety barriers
• Ensure equipment is positioned correctly and securely
Step 7: Install Safety Measures
• Set up fall protection systems including guardrails harnesses and safety nets
• Ensure all safety measures comply with OSHA regulations and site-specific safety plans
Step 8: Verify Utility Connections
• Confirm that all necessary utility connections such as electricity for power tools are available and functioning
• Set up temporary utilities if needed
Step 9: Distribute PPE
• Ensure all crew members have the required personal protective equipment (PPE)
• Verify that PPE is in good condition and fits properly
Step 10: Conduct Final Check
• Perform a final check to ensure all equipment is set up correctly and safely
• Confirm that the crew is ready to begin work according to the project schedule
Conduct site safety briefing with roofing crew
Step 1: Prepare Safety Materials
• Gather all necessary safety materials including safety plans PPE and emergency procedures
• Prepare a list of key safety points to cover during the briefing
Step 2: Assemble Roofing Crew
• Gather the roofing crew at a designated meeting area on the site
• Ensure everyone is present and paying attention
Step 3: Review Safety Plans
• Discuss the site-specific safety plan including fall protection electrical safety and material handling
• Highlight any unique hazards or challenges specific to the project site
Step 4: Distribute PPE
• Ensure all crew members have the required PPE such as helmets harnesses gloves and safety glasses
• Review the proper use and maintenance of PPE
Step 5: Explain Emergency Procedures
• Detail the emergency procedures including the location of first aid kits emergency exits and contact information for emergency services
• Ensure everyone knows what to do in case of an accident or emergency
Step 6: Outline Safe Work Practices
• Discuss safe work practices for roofing tasks such as proper ladder usage safe lifting techniques and maintaining a clean work area
• Emphasize the importance of reporting unsafe conditions or near-miss incidents
Step 7: Assign Safety Roles
• Designate safety roles and responsibilities to specific crew members such as safety monitors or first aid responders
• Ensure everyone understands their roles and responsibilities
Step 8: Encourage Questions and Feedback
• Invite crew members to ask questions or provide feedback on the safety plan
• Address any concerns or suggestions to improve site safety
Step 9: Document the Briefing
• Record the details of the safety briefing including the date attendees and topics covered
• Keep a copy of the documentation for your records and compliance purposes
Coordinate with general contractor (GC) and other subcontractors on site
Step 1: Schedule Coordination Meeting
• Arrange a meeting with the GC and other subcontractors to discuss the project timeline and coordination needs
• Confirm the date time and location for the meeting
Step 2: Prepare Agenda
• Draft an agenda covering key points for discussion such as project milestones task sequencing and potential conflicts
• Share the agenda with all participants ahead of the meeting
Step 3: Attend Coordination Meeting
• Attend the coordination meeting with the GC and other subcontractors
• Discuss the roofing schedule dependencies and any site-specific requirements
Step 4: Identify Overlapping Tasks
• Identify any overlapping tasks or potential conflicts with other subcontractors
• Work together to develop a plan to minimize disruptions and ensure smooth workflow
Step 5: Establish Communication Channels
• Set up communication channels for ongoing coordination such as a project management app regular check-in meetings or a dedicated group chat
• Ensure everyone knows how to reach each other for updates and problem-solving
Step 6: Define Roles and Responsibilities
• Clarify the roles and responsibilities of each party involved
• Ensure everyone understands their tasks and how they fit into the overall project plan
Step 7: Discuss Safety Protocols
• Review safety protocols and ensure all subcontractors are aware of and adhere to the site safety plan
• Coordinate on shared safety measures and emergency procedures
Step 8: Agree on Site Logistics
• Discuss site logistics including equipment storage access points and material delivery schedules
• Ensure there is a clear plan for managing site resources and avoiding congestion
Step 9: Document Agreements
• Document all agreements and action items from the meeting
• Share the documented agreements with all participants to ensure everyone is aligned
Step 10: Monitor and Adjust
• Regularly monitor the progress and adherence to the coordination plan
• Adjust the plan as needed based on project developments and feedback from the GC and subcontractors
Verify delivery and inventory of roofing materials
Step 1: Prepare Material List
• Create a detailed list of all roofing materials expected for delivery including quantities and specifications
• Ensure the list is comprehensive and matches the purchase orders
Step 2: Coordinate Delivery Schedule
• Confirm the delivery schedule with suppliers to ensure materials arrive on time
• Communicate the delivery schedule to the project team and site manager
Step 3: Inspect Delivered Materials
• Upon delivery inspect all roofing materials to ensure they match the specifications and quantities on the material list
• Check for any signs of damage or defects
Step 4: Document Delivery
• Record the details of the delivery including the date time and condition of the materials
• Take photographs of any damaged items for documentation and claims
Step 5: Compare Against Purchase Orders
• Compare the delivered materials against the purchase orders and the material list
• Ensure all items are accounted for and meet the required specifications
Step 6: Report Discrepancies
• If there are any discrepancies such as missing or damaged items report them to the supplier immediately
• Document the discrepancies and follow up to resolve them
Step 7: Store Materials Safely
• Store the materials in a designated secure area on-site
• Ensure they are protected from weather conditions and potential damage
Step 8: Update Inventory Records
• Update the inventory records to reflect the received materials
• Include details such as quantities specifications and storage locations
Step 9: Communicate with Team
• Inform the project team and relevant stakeholders about the received materials
• Ensure everyone is aware of the inventory status and any issues that need addressing
Step 10: Set Up Replenishment Plan
• If necessary set up a replenishment plan for materials that may need to be reordered or supplemented during the project
• Coordinate with suppliers to ensure timely restocking
Prepare roof deck for installation (e.g., clean, inspect)
Step 1: Conduct Initial Inspection
• Inspect the roof deck to identify any existing damage debris or potential issues
• Look for signs of rot mold or structural weaknesses that need to be addressed
Step 2: Clear Debris and Clean Surface
• Remove all debris such as leaves dirt and old roofing materials from the roof deck
• Use brooms blowers or pressure washers to clean the surface thoroughly
Step 3: Repair Damage
• Address any damage found during the initial inspection
• Replace rotten or damaged decking secure loose boards and fill any gaps or holes
Step 4: Check for Levelness
• Ensure the roof deck is level and smooth
• Use a leveling tool to check for uneven areas and make necessary adjustments
Step 5: Inspect Flashing and Penetrations
• Examine flashing around chimneys skylights and other roof penetrations
• Repair or replace damaged flashing to ensure a watertight seal
Step 6: Verify Fasteners
• Check that all nails and screws are properly secured and flush with the roof deck
• Remove any protruding fasteners and replace missing ones
Step 7: Ensure Proper Ventilation
• Confirm that roof ventilation is adequate and unobstructed
• Ensure vents are clear and properly installed to allow airflow
Step 8: Document Preparations
• Record the steps taken to prepare the roof deck including photographs of repaired areas
• Keep documentation for quality control and project records
Step 9: Confirm Readiness
• Conduct a final walkthrough with the project supervisor to confirm the roof deck is ready for installation
• Address any remaining issues before proceeding to the next step
Install roofing underlayment and moisture barrier
Step 1: Select Appropriate Materials
• Choose the correct type of underlayment and moisture barrier for the roofing project
• Ensure materials meet project specifications and manufacturer guidelines
Step 2: Measure and Cut Underlayment
• Measure the roof area and cut the underlayment to fit allowing for overlaps
• Ensure pieces are cut accurately to avoid gaps and ensure proper coverage
Step 3: Install Drip Edge
• Install a drip edge along the eaves and rakes of the roof to direct water away from the fascia
• Secure the drip edge with roofing nails ensuring it is flush with the roof deck
Step 4: Apply Underlayment
• Starting at the lowest point of the roof roll out the underlayment horizontally across the roof deck
• Secure the underlayment with roofing nails or staples following the manufacturer’s spacing recommendations
Step 5: Overlap Edges
• Ensure each row of underlayment overlaps the row below by the recommended amount (typically 2-4 inches)
• Overlap end joints by at least 6 inches to prevent water infiltration
Step 6: Seal Penetrations
• Cut and fit the underlayment around roof penetrations such as vents and chimneys
• Use roofing cement or adhesive to seal the edges and ensure a watertight barrier
Step 7: Install Moisture Barrier (if required)
• If an additional moisture barrier is required install it over the underlayment
• Follow the same installation and overlapping procedures to ensure full coverage
Step 8: Check for Wrinkles and Bubbles
• Smooth out any wrinkles or bubbles in the underlayment to ensure a flat surface
• Use a broom or roller to press the underlayment firmly against the roof deck
Step 9: Inspect Installation
• Conduct a thorough inspection of the installed underlayment and moisture barrier
• Ensure all areas are covered secured and sealed properly
Step 10: Document Installation
• Record the installation process with photographs and notes
• Keep documentation for quality control and project records
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Select Roofing Materials
• Choose the appropriate roofing materials based on project specifications and GC preferences
• Ensure all materials meet quality standards and are suitable for the roof’s design and climate conditions
Step 2: Prepare Roofing Materials
• Lay out the roofing materials on the ground near the installation area for easy access
• Pre-cut materials as necessary to fit around roof penetrations and edges
Step 3: Start at the Bottom
• Begin installing the roofing materials at the lowest point of the roof typically the eaves
• Work your way up to ensure proper water runoff and overlapping
Step 4: Install Starter Strip
• Install a starter strip or the first row of shingles tiles or panels along the eaves
• Ensure it is straight and securely fastened to provide a solid base for the rest of the roofing material
Step 5: Lay Roofing Material in Rows
• Lay the roofing materials in overlapping rows following the manufacturer’s guidelines
• Ensure each piece overlaps the one below to prevent water infiltration
Step 6: Secure Materials Properly
• Use the appropriate fasteners for the roofing material (e.g., nails for shingles clips for metal panels)
• Ensure fasteners are driven flush with the surface and are spaced according to manufacturer specifications
Step 7: Install Flashing
• Install flashing around roof penetrations such as chimneys vents and skylights
• Ensure flashing is properly integrated with the roofing material to create a watertight seal
Step 8: Trim and Finish Edges
• Trim roofing materials at the edges ridges and valleys to ensure a clean and finished look
• Secure the edges with appropriate fasteners and cover with ridge caps or edge tiles
Step 9: Inspect Installation
• Conduct a thorough inspection of the installed roofing materials
• Check for proper alignment secure fastening and any potential issues
Step 10: Document Installation
• Record the installation process with photographs and notes
• Keep documentation for quality control and project records
Install flashing and other roof penetrations
Step 1: Prepare Flashing Materials
• Select the appropriate type and size of flashing for the roof penetrations
• Ensure all materials meet project specifications and are compatible with the roofing material
Step 2: Clean Roof Penetrations
• Clean the area around roof penetrations such as chimneys vents and skylights
• Ensure surfaces are free of debris dirt and old roofing material
Step 3: Measure and Cut Flashing
• Measure the roof penetrations and cut the flashing to fit snugly around them
• Ensure pieces are cut accurately to cover the entire penetration area and overlap the roofing material
Step 4: Install Base Flashing
• Install the base flashing at the bottom of the roof penetration
• Secure it with roofing nails or screws ensuring it is flush with the roof surface
Step 5: Apply Sealant
• Apply a generous amount of roofing sealant around the base of the penetration
• Ensure the sealant creates a watertight barrier between the flashing and the roof surface
Step 6: Install Step Flashing
• Install step flashing around the sides of the roof penetration overlapping each piece with the previous one
• Secure each piece with roofing nails or screws ensuring a tight fit
Step 7: Install Counter Flashing
• Install counter flashing over the base and step flashing
• Secure it to the penetration structure such as a chimney or vent pipe with appropriate fasteners
Step 8: Seal Flashing Edges
• Apply roofing sealant to the edges of the flashing to ensure a watertight seal
• Smooth the sealant with a trowel or putty knife for a clean finish
Step 9: Install Additional Flashing (if needed)
• If additional flashing is required for complex penetrations such as skylights or roof valleys install it according to manufacturer guidelines
• Ensure all pieces are properly overlapped and secured
Step 10: Inspect Flashing Installation
• Conduct a thorough inspection of the installed flashing and roof penetrations
• Check for proper alignment secure fastening and any potential issues
Step 11: Document Installation
• Record the installation process with photographs and notes
• Keep documentation for quality control and project records
Conduct weekly quality control inspections
Step 1: Schedule Inspections
• Set a regular schedule for weekly quality control inspections throughout the duration of the roofing project
• Inform the roofing crew and relevant stakeholders of the inspection schedule
Step 2: Prepare Inspection Checklist
• Create a comprehensive inspection checklist covering all critical aspects of the roofing work
• Include items such as material quality installation techniques safety compliance and site cleanliness
Step 3: Gather Necessary Tools
• Collect all tools and equipment needed for the inspection such as a camera measuring tape notepad and PPE
• Ensure you have access to the project plans and specifications for reference
Step 4: Conduct Visual Inspection
• Perform a thorough visual inspection of the roofing work
• Look for visible defects such as misaligned shingles gaps in flashing and improperly secured materials
Step 5: Check Installation Quality
• Verify that the roofing materials are installed according to manufacturer guidelines and project specifications
• Ensure proper overlaps fastening and integration with roof penetrations
Step 6: Assess Safety Compliance
• Ensure that all safety measures such as fall protection systems and PPE usage are being followed
• Check for any potential hazards or unsafe practices on the site
Step 7: Evaluate Site Cleanliness
• Inspect the site for cleanliness and organization
• Ensure that debris is being regularly removed and materials are stored safely and securely
Step 8: Document Findings
• Record detailed notes and take photographs of any issues or areas of concern
• Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 9: Communicate with Crew
• Discuss the inspection findings with the roofing crew and address any issues immediately
• Provide guidance and corrective actions to ensure quality standards are met
Step 10: Follow Up on Corrections
• Monitor the progress of corrective actions and verify that issues identified during the inspection are resolved
• Schedule additional inspections if needed to ensure continuous quality control
Step 11: Report to Internal Stakeholders
• Prepare a summary report of the inspection findings and share it with relevant internal stakeholders such as the project manager
• Include any necessary follow-up actions and deadlines
Perform site cleanup and waste disposal of roofing materials
Step 1: Identify Cleanup Areas
• Determine the specific areas of the site that require cleanup including the roof ground level and material storage areas
• Create a plan for systematically addressing each area
Step 2: Gather Cleanup Supplies
• Collect all necessary cleanup supplies such as brooms shovels trash bags and dumpsters
• Ensure you have access to safety equipment such as gloves and safety glasses
Step 3: Sort Waste Materials
• Separate recyclable materials from non-recyclable waste
• Identify items that can be reused such as undamaged shingles or metal scraps
Step 4: Remove Debris from Roof
• Clear the roof of any debris such as loose nails shingle scraps and packaging materials
• Use brooms and blowers to ensure a thorough cleanup
Step 5: Collect Ground-Level Debris
• Collect debris that has fallen to the ground around the site
• Use shovels and rakes to gather and bag the waste for disposal
Step 6: Dispose of Waste Properly
• Transport waste materials to the designated disposal area or dumpster
• Ensure all waste is disposed of in accordance with local regulations and environmental guidelines
Step 7: Recycle Materials
• Transport recyclable materials to a recycling facility or arrange for pickup
• Ensure that recycling is done in compliance with local recycling programs and policies
Step 8: Store Remaining Materials Safely
• Organize and store any remaining materials safely on-site
• Ensure they are protected from weather conditions and potential damage
Step 9: Inspect Site for Completeness
• Conduct a final walkthrough of the site to ensure all debris and waste have been removed
• Check for any overlooked areas and address them as needed
Step 10: Document Cleanup Activities
• Record the details of the cleanup activities including the amount of waste disposed of and any recyclable materials processed
• Keep documentation for project records and compliance purposes
Step 11: Communicate with Team
• Inform the project team and relevant stakeholders that the site cleanup is complete
• Provide any necessary instructions for maintaining site cleanliness throughout the remainder of the project
Conduct final inspection of the roofing work
Step 1: Schedule Final Inspection
• Coordinate with the project manager roofing crew and relevant stakeholders to schedule the final inspection
• Confirm the date and time ensuring all necessary participants are informed
Step 2: Prepare Inspection Checklist
• Create a comprehensive checklist for the final inspection covering all critical aspects of the roofing work
• Include items such as material quality installation techniques flashing and roof penetrations
Step 3: Gather Necessary Tools
• Collect all tools and equipment needed for the inspection such as a camera measuring tape notepad and PPE
• Ensure you have access to the project plans specifications and previous inspection reports for reference
Step 4: Perform Visual Inspection
• Conduct a thorough visual inspection of the entire roof
• Check for any visible defects such as misaligned shingles gaps in flashing and improperly secured materials
Step 5: Verify Installation Quality
• Ensure that all roofing materials are installed according to manufacturer guidelines and project specifications
• Check for proper overlaps fastening and integration with roof penetrations
Step 6: Inspect Flashing and Penetrations
• Examine flashing around chimneys vents skylights and other roof penetrations
• Ensure flashing is properly installed and sealed to prevent water infiltration
Step 7: Check for Uniformity
• Verify that the roofing materials are uniform in appearance and correctly aligned
• Ensure that there are no color mismatches uneven surfaces or aesthetic issues
Step 8: Test for Leaks
• Perform a water test if applicable to check for leaks
• Simulate rain conditions and inspect the interior of the building for any signs of water infiltration
Step 9: Document Findings
• Record detailed notes and take photographs of any issues or areas of concern
• Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 10: Communicate with Crew
• Discuss the inspection findings with the roofing crew and address any issues immediately
• Provide guidance and corrective actions to ensure quality standards are met
Step 11: Report to Internal Stakeholders
• Prepare a summary report of the final inspection findings and share it with relevant internal stakeholders such as the project manager
• Include any necessary follow-up actions and deadlines
Notify GC that roofing work is substantially complete
Step 1: Prepare Substantial Completion Documentation
• Gather all necessary documentation to support the substantial completion of the roofing work
• Include inspection reports quality control records and photographs of the completed roof
Step 2: Draft Notification Letter
• Write a formal notification letter to the GC indicating that the roofing work is substantially complete
• Include a summary of the work performed the date of completion and any remaining minor items to be addressed
Step 3: Attach Supporting Documents
• Attach supporting documents to the notification letter such as the final inspection report and any punch list items
• Ensure all attachments are clearly labeled and organized
Step 4: Review with Project Manager
• Review the notification letter and supporting documents with the project manager
• Ensure all information is accurate and complete before sending
Step 5: Send Notification to GC
• Email or deliver the notification letter and supporting documents to the GC
• Ensure you use the correct contact information and request confirmation of receipt
Step 6: Confirm Receipt
• Follow up with the GC to confirm they have received the notification and supporting documents
• Address any questions or concerns they may have about the substantial completion
Step 7: Update Project Records
• Record the details of the notification in your project management system
• Include the date sent the recipient’s contact information and a copy of the notification letter
Step 8: Communicate with Team
• Inform the roofing crew and relevant stakeholders that the roofing work is substantially complete
• Provide any necessary instructions for addressing remaining punch list items
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!