Closeout Workflow
Schedule final walkthrough with the GC and project manager
Step 1: Coordinate with GC and Project Manager to Determine Availability
-
Contact the General Contractor (GC) and project manager to determine their availability for the final walkthrough
-
Offer several date and time options to accommodate their schedules
Step 2: Confirm the Agenda and Objectives for the Walkthrough
-
Prepare an agenda for the final walkthrough that outlines the key areas to be reviewed, such as completed roofing work and any outstanding issues
-
Confirm the agenda and objectives of the walkthrough with the GC and project manager
Step 3: Send Calendar Invitations and Meeting Reminders
-
Send calendar invitations to all participants, confirming the date, time, and location of the walkthrough
-
Include a meeting reminder one day before the scheduled walkthrough to ensure all stakeholders are prepared
Step 4: Prepare Necessary Documentation and Reports for the Walkthrough
-
Prepare all necessary documentation and reports for the walkthrough, such as punch lists, inspection checklists, and progress reports
-
Ensure that all documents are up-to-date and easily accessible for reference
Step 5: Communicate Walkthrough Details to the Roofing Crew
-
Communicate the details of the final walkthrough to the roofing crew, emphasizing any remaining tasks or touch-ups that need to be completed before the inspection
-
Confirm that all crew members are aware of their responsibilities
Step 6: Verify Completion of All Pre-Walkthrough Preparations
-
Conduct a final review of the roofing work to verify that all preparations for the walkthrough have been completed
-
Address any minor issues or last-minute adjustments needed to meet project standards
Step 7: Document the Scheduled Walkthrough and Participants
-
Document the scheduled walkthrough in the project records, including the date, time, and list of participants
-
Save the agenda and all related documents in the project files for future reference
Conduct final inspection to ensure all roofing work is completed to satisfaction
Step 1: Begin the Walkthrough with a Brief Overview
-
Start the final inspection by providing a brief overview of the inspection process and key areas to be reviewed
-
Confirm the objectives of the inspection with all participants, including the GC and project manager
Step 2: Inspect All Roofing Components and Key Areas
-
Conduct a thorough inspection of all roofing components, focusing on critical areas such as flashing, roof penetrations, shingles, and moisture barriers
-
Use an inspection checklist to systematically review each section of the roof
Step 3: Verify Compliance with Project Specifications and Standards
-
Verify that all roofing work complies with the approved project specifications, manufacturer guidelines, and local building codes
-
Pay special attention to any previously identified issues or areas that required corrective actions
Step 4: Address Any Questions or Concerns Raised During the Inspection
-
Allow the GC and project manager to raise any questions or concerns during the inspection
-
Provide clear explanations and document any additional feedback or action items that arise
Step 5: Confirm Completion of Roofing Work to the GCโs Satisfaction
-
Confirm with the GC and project manager that all roofing work has been completed to their satisfaction
-
Address any remaining minor issues on-site, if feasible, or plan for immediate follow-up actions
Step 6: Document the Final Inspection Results and Approval
-
Document the results of the final inspection, including any feedback from the GC and project manager
-
Obtain their verbal or written approval for the completed roofing work
Step 7: Save Final Inspection Records in Project Files
-
Save the final inspection records, photos, and notes in the project files for future reference
-
Confirm that all related documents are up-to-date and accessible
Address any last-minute concerns or issues raised by the GC
Step 1: Promptly Review Any Last-Minute Concerns Raised by the GC
-
Review any last-minute concerns or issues raised by the GC during the final walkthrough or inspection
-
Determine the severity and impact of each concern on the overall project completion
Step 2: Assign Responsibilities to the Roofing Crew for Immediate Action
-
Assign responsibilities to the roofing crew or relevant subcontractors to address each concern or issue raised by the GC
-
Confirm that all team members understand their tasks and the urgency of completing them
Step 3: Develop a Plan for Corrective Actions or Final Adjustments
-
Develop a plan to address each identified concern, including specific corrective actions, materials needed, and an estimated timeline for completion
-
Communicate the plan to the GC and project manager for their approval
Step 4: Monitor Progress and Verify Completion of Corrective Actions
-
Monitor the progress of the assigned tasks to ensure that corrective actions are being completed according to the plan and timeline
-
Conduct follow-up inspections as needed to verify that all issues have been resolved
Step 5: Communicate Resolution of Issues to the GC and Project Manager
-
Once all corrective actions are completed, communicate the resolution of each issue to the GC and project manager
-
Provide documentation or photos as needed to confirm the quality of the completed work
Step 6: Obtain Final Sign-Off on Addressed Issues from the GC
-
Obtain the GCโs final sign-off on all addressed issues, confirming that they are satisfied with the quality and compliance of the roofing work
-
Document the sign-off in the project records
Step 7: Update Project Files and Close Out the Roofing Scope
-
Update the project files with all documentation related to the resolution of last-minute concerns
-
Confirm that the roofing scope is officially closed and communicate this status to the project team
Complete all remaining documentation and paperwork for roofing work
Step 1: Gather Project Documentation
-
Collect all relevant project documentation including inspection reports punch lists change orders and progress reports
-
Ensure all documents are complete and organized
Step 2: Review Documentation for Completeness
-
Check each document to ensure it is complete and accurately reflects the roofing work performed
-
Address any missing information or discrepancies
Step 3: Prepare Final Report
-
Create a comprehensive final report summarizing the roofing work completed
-
Include key details such as project scope timeline materials used and any issues encountered and resolved
Step 4: Update Project Management System
-
Enter all final documentation and information into the project management system
-
Ensure the system is up-to-date with accurate and complete records
Step 5: Compile Supporting Documents
-
Compile all supporting documents required for project closeout such as permits inspection certificates and compliance reports
-
Ensure these documents are readily accessible and organized
Step 6: Review with Project Manager
-
Discuss the final documentation with the project manager to ensure all items are accurately documented
-
Make any necessary adjustments based on their feedback
Step 7: Prepare Document Packet for GC
-
Assemble a document packet for the GC including the final report and all supporting documents
-
Ensure the packet is clearly labeled and organized for easy review
Ensure all warranties and manuals related to roofing are compiled and provided to the GC
Step 1: Identify Warranty Requirements
-
Review the project specifications and contract to identify all required warranties and manuals related to the roofing work
-
Ensure you understand the terms and conditions for each warranty
Step 2: Gather Warranty Documentation
-
Collect all warranty documents from manufacturers and suppliers including product warranties installation warranties and workmanship guarantees
-
Ensure all documents are complete and accurately reflect the products used in the project
Step 3: Compile Product Manuals
-
Gather all relevant product manuals including installation guides maintenance instructions and user manuals for roofing materials and equipment
-
Ensure all manuals are complete and easy to understand
Step 4: Prepare Warranty and Manual Packet
-
Create a comprehensive packet that includes all warranties and product manuals
-
Ensure the packet is clearly organized with each document labeled and categorized
Step 5: Review with Project Manager
-
Discuss the warranty and manual packet with the project manager to ensure all items are included and accurately documented
-
Make any necessary adjustments based on their feedback
Obtain final approvals and sign-offs from relevant authorities for roofing work
Step 1: Obtain Written Approvals
-
Once the inspections are successfully completed obtain written approvals and sign-offs from the relevant authorities
-
Ensure the approvals are clearly documented and include any conditions or notes provided by the inspectors
Step 2: Document Approvals
-
Record the details of the final approvals and sign-offs in your project management system
-
Include copies of the written approvals and any related documentation
Step 3: Inform Project Team
-
Notify the Project Manager and other relevant internal stakeholders that the final approvals and sign-offs have been obtained
-
Provide any necessary instructions for accessing and reviewing the documentation
Step 4: Store Approvals Securely
-
Ensure copies of all final approvals and sign-offs are securely stored in the project records
-
Maintain easy access to these documents for future reference or audits
Remove all roofing equipment and clean up the site
Step 1: Plan Equipment Removal
-
Create a detailed plan for removing all roofing equipment from the site
-
Identify the order in which equipment will be dismantled and removed ensuring minimal disruption to the site
Step 2: Coordinate with Roofing Crew
-
Inform the roofing crew of the schedule for equipment removal and site cleanup
-
Ensure everyone understands their responsibilities and the timeline for completion
Step 3: Gather Cleanup Supplies
-
Collect all necessary cleanup supplies such as brooms shovels trash bags and dumpsters
-
Ensure you have access to safety equipment such as gloves and safety glasses
Step 4: Dismantle Roofing Equipment
-
Safely dismantle and remove all roofing equipment such as ladders scaffolding and safety barriers
-
Ensure equipment is cleaned inspected and prepared for transport
Step 5: Transport Equipment
-
Arrange transportation for all roofing equipment and tools back to the storage facility
-
Ensure all equipment is securely loaded and transported safely
Step 6: Remove Roofing Debris
-
Clear the roof and surrounding areas of any remaining debris such as shingle scraps nails and packaging materials
-
Use brooms and blowers to ensure a thorough cleanup
Step 7: Dispose of Waste Properly
-
Dispose of waste materials in accordance with local regulations and environmental guidelines
-
Separate recyclable materials from non-recyclable waste and transport them to the appropriate facilities
Step 8: Inspect Site for Completeness
-
Conduct a final inspection of the site to ensure all debris and equipment have been removed
-
Address any remaining areas that need attention
Step 9: Document Cleanup
-
Record the details of the site cleanup including the date participants and any issues encountered
-
Take photographs of the cleaned site for documentation purposes
Step 10: Communicate Completion
-
Inform the GC and relevant stakeholders that the final site cleanup has been completed
-
Provide any necessary documentation and address any final concerns
Perform a final safety check and remove all safety equipment
Step 1: Prepare Safety Checklist
-
Create a comprehensive checklist covering all safety equipment and measures that need to be inspected and removed
-
Ensure the checklist includes items such as fall protection systems safety barriers and PPE
Step 2: Gather Safety Inspection Tools
-
Collect all necessary tools and equipment needed for the safety inspection such as a notepad camera and PPE
-
Ensure everything is in good working condition
Step 3: Conduct Safety Inspection
-
Perform a thorough inspection of the roofing site to ensure all safety measures are still in place and functioning correctly
-
Check fall protection systems safety barriers and any other safety equipment used during the project
Step 4: Document Findings
-
Record detailed notes and take photographs of the current state of all safety equipment
-
Use the safety checklist to ensure all aspects are covered
Step 5: Verify Equipment Condition
-
Inspect each piece of safety equipment for any signs of wear damage or malfunction
-
Ensure all equipment is in good condition and safe to use
Step 6: Dismantle Safety Systems
-
Safely dismantle and remove all safety equipment from the site
-
Ensure fall protection systems safety barriers and other equipment are carefully taken down and packed
Step 7: Transport Safety Equipment
-
Arrange transportation for all safety equipment back to the storage facility
-
Ensure all equipment is securely loaded and transported safely
Step 8: Dispose of Damaged Equipment
-
Properly dispose of any damaged or worn-out safety equipment according to local regulations
-
Ensure disposal is done in an environmentally responsible manner
Step 9: Store Equipment Securely
-
Ensure all safety equipment is securely stored at the storage facility
-
Maintain an inventory of equipment to ensure nothing is missing or damaged
Step 10: Record Safety Check Completion
-
Document the completion of the final safety check and removal of safety equipment in your project management system
-
Include details such as the date participants and any issues encountered
Conduct a project debrief with the roofing team to review successes and areas for improvement
Step 1: Schedule Debrief Meeting
-
Coordinate with the roofing team to schedule the project debrief meeting
-
Confirm the date time and location for the meeting
Step 2: Prepare Meeting Agenda
-
Create a detailed agenda for the debrief meeting covering key topics such as project successes challenges and lessons learned
-
Share the agenda with the team ahead of the meeting to ensure everyone is prepared
Step 3: Gather Project Documentation
-
Collect all relevant project documentation including final reports inspection records and feedback from the GC
-
Ensure you have copies for reference during the meeting
Step 4: Conduct Debrief Meeting
-
Hold the project debrief meeting with the roofing team
-
Discuss the project from start to finish highlighting key achievements and areas for improvement
Step 5: Identify Successes
-
Encourage team members to share their experiences and identify what went well during the project
-
Document the successful aspects and strategies that can be applied to future projects
Step 6: Discuss Challenges
-
Review any challenges or issues encountered during the project
-
Identify the root causes and discuss how they were addressed and resolved
Step 7: Gather Feedback
-
Solicit feedback from the team on the overall project process including communication resource allocation and support
-
Use this feedback to identify areas for improvement
Step 8: Document Lessons Learned
-
Record the key lessons learned from the project including both successes and areas for improvement
-
Ensure the documentation is clear and easily accessible for future reference
Step 9: Develop Action Plan
-
Based on the feedback and lessons learned develop an action plan for improving future projects
-
Assign responsibilities and set deadlines for implementing the improvements
Step 10: Share Debrief Outcomes
-
Share the documented outcomes and identified improvements with relevant stakeholders including project managers and company leadership
-
Ensure everyone is aware of the lessons learned and how they will be applied to future projects
Archive all project documents and records related to roofing work
Step 1: Gather Project Documents
-
Collect all relevant project documents including contracts permits inspection reports punch lists warranties and final approvals
-
Ensure all documents are complete and organized
Step 2: Review Documentation for Completeness
-
Check each document to ensure it is complete and accurately reflects the roofing work performed
-
Address any missing information or discrepancies
Step 3: Digitize Physical Documents
-
Scan any physical documents to create digital copies
-
Ensure all scanned documents are clear and legible
Step 4: Organize Digital Files
-
Create a structured folder system on your computer or cloud storage to organize the digital copies of all project documents
-
Label each folder and document clearly for easy access
Step 5: Upload Documents to Subtrak
-
Log in to Subtrak and navigate to the project management section
-
Upload all collected project documents to the appropriate project folder in Subtrak Ensure each document is correctly labeled and organized
Step 6: Verify Document Accuracy
-
Review all uploaded documents in Subtrak to ensure they are accurate and complete
-
Correct any errors or omissions before finalizing the records
Step 7: Backup Digital Files
-
Create a backup of all digital files on an external hard drive or cloud storage service
-
Ensure the backup is secure and easily accessible
Step 8: Store Physical Copies Securely
-
Store any physical copies of project documents in a secure organized location
-
Ensure they are protected from damage and easy to retrieve if needed
Step 9: Record Archiving Completion
-
Document the completion of the archiving process in your project management system
-
Include details such as the date participants and any issues encountered
Step 10: Communicate Completion to Team
-
Inform the relevant stakeholders that all project documents and records have been archived
-
Provide any necessary instructions for accessing and reviewing the archived documents
Ensure all financials are settled and final invoices for roofing work are sent to the GC
Step 1: Review Project Financial Records with Accounting Team
-
Review the project financial records with the accounting team to confirm all expenses, payments, and outstanding invoices
-
Ensure that all financial entries are accurate and up-to-date
Step 2: Verify Outstanding Balances and Payment Schedules
-
Verify any outstanding balances and payment schedules, ensuring that all subcontractors, suppliers, and crew members have been paid according to the project terms
Step 3: Reconcile Final Project Expenses and Adjustments
-
Reconcile all final project expenses, including any adjustments for change orders, material substitutions, or additional labor
-
Confirm that all adjustments are reflected in the financial records
Step 4: Prepare Final Invoices for General Contractor
-
Prepare final invoices for the GC, detailing all completed work, materials used, and any additional charges
-
Include a clear breakdown of costs and any approved change orders
Step 5: Review and Approve Final Invoices with Project Manager
-
Review the final invoices with the project manager, confirming that all charges and descriptions align with the completed work
-
Obtain the project managerโs approval before submission
Step 6: Send Final Invoices to GC
-
Send the final invoices to the GC, following the specified submission process (e.g., email, postal service, or portal)
-
Confirm receipt of invoices by the GC and request any feedback if needed
Step 7: Document Financial Settlement and Invoice Submission in CRM
-
Document the financial settlement and final invoice submission in the CRM, noting the date, amount, and recipient confirmation
-
Update the project status to reflect financial completion
Prepare and submit final invoice and closeout documents to the GC
Step 1: Compile Final Costs
-
Gather all final costs including labor materials equipment and any additional expenses incurred during the project
-
Ensure all costs are supported by receipts and documentation
Step 2: Create Detailed Final Invoice
-
Prepare a detailed final invoice for the roofing work
-
Include itemized costs for all labor materials equipment and any additional expenses Ensure the invoice is clear accurate and reflects the terms agreed upon in the contract
Step 3: Prepare Closeout Documents
-
Compile all necessary closeout documents including final inspection reports punch list completion records warranties and manuals
-
Ensure all documents are complete accurate and organized
Step 4: Review with Project Manager
-
Discuss the final invoice and closeout documents with the project manager to ensure all items are accurately documented
-
Make any necessary adjustments based on their feedback
Step 5: Draft Cover Letter
-
Write a professional cover letter to accompany the final invoice and closeout documents
-
Include a summary of the project key accomplishments and a request for final payment
Step 6: Package Documents for Submission
-
Assemble the final invoice closeout documents and cover letter into a single organized package
-
Ensure all documents are clearly labeled and easy to review
Step 7: Submit to GC
-
Send the final invoice and closeout documents package to the GC
-
Ensure the package is delivered in a secure and trackable manner such as via certified mail or a reliable courier service
Step 8: Confirm Receipt and Track Payment
-
Follow up with the GC to confirm they have received the final invoice and closeout documents
-
Monitor the status of the final payment and address any questions or issues that arise
Step 9: Record Payment and Communicate with Team
-
Once the final payment is received record the details in your project management system
-
Inform the roofing crew and relevant stakeholders that the final invoice and closeout documents have been submitted and the final payment has been received
๐ Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.