Closeout Workflow
Schedule final walkthrough with the client and project manager
Step 1: Coordinate Final Walkthrough Date
-
Communicate with the client and project manager to agree on a date and time for the final walkthrough
-
Send calendar invitations to confirm the schedule
Step 2: Prepare Walkthrough Checklist
-
Create a checklist of key areas and tasks to review during the final walkthrough
-
Include items related to quality, safety, and functionality
Step 3: Review Project Documentation
-
Organize all relevant project documentation, including inspection reports and client communications
-
Ensure documents are ready for reference during the walkthrough
Step 4: Conduct a Pre-Walkthrough Inspection
-
Perform a pre-walkthrough inspection with the project team to identify any last-minute issues
-
Address any concerns before the client arrives
Step 5: Confirm Final Walkthrough Agenda
-
Review the final walkthrough agenda with the project manager
-
Ensure that all key topics and areas are covered in the agenda
Step 6: Communicate Walkthrough Plan to Client
-
Provide the client with an overview of the walkthrough plan
-
Confirm the client’s understanding and agreement with the agenda
Step 7: Reconfirm Final Walkthrough Schedule
-
Send a reminder to the client and project manager one day before the walkthrough
-
Reconfirm the date, time, and meeting location
Conduct final inspection to ensure all roofing maintenance work is completed to client's satisfaction
Step 1: Schedule the Final Inspection with the Client and Project Team
-
Schedule the final inspection with the client and project team, confirming the inspection date, time, and key participants
-
Ensure that all necessary documents and inspection tools are prepared in advance
Step 2: Use a Comprehensive Final Inspection Checklist
-
Use a comprehensive final inspection checklist to systematically review key areas, such as roofing materials, flashing, drainage systems, and overall workmanship
-
Include specific criteria for each item to confirm compliance with project specifications and client expectations
Step 3: Review Each Section of the Roof Thoroughly
-
Review each section of the roof thoroughly to ensure that all maintenance tasks have been completed according to the project plan and client requirements
-
Take detailed notes and photos of any areas needing minor adjustments or additional touch-ups
Step 4: Confirm the Client's Satisfaction During the Inspection
-
Confirm the client’s satisfaction during the inspection by inviting them to provide feedback or point out any remaining concerns
-
Address any questions they may have about the completed work or the final inspection process
Step 5: Document Inspection Findings and Address Remaining Issues
-
Document the findings of the final inspection, noting any remaining issues or client requests for final adjustments
-
Assign action items to relevant team members and confirm deadlines for completing corrections
Step 6: Communicate Inspection Results and Next Steps to the Client
-
Communicate the results of the final inspection to the client, highlighting areas of excellence and any final touch-ups planned
-
Confirm the next steps for project closure and obtaining final sign-offs
Step 7: Save the Final Inspection Report in Project Records
-
Save the final inspection report in project records and CRM, linking it to the client’s file for reference during closeout and warranty management
Address any last-minute concerns or issues raised by the client
Step 1: Schedule a Meeting with the Client
-
Arrange a meeting or call with the client to discuss any last-minute concerns
-
Confirm the meeting time and location with the client in advance
Step 2: Listen to Client's Concerns
-
Allow the client to express any final issues, concerns, or suggestions
-
Take detailed notes to ensure each concern is clearly understood
Step 3: Assess the Client's Concerns
-
Assess the validity and impact of the client’s concerns
-
Determine if the issues are related to quality, functionality, or safety
Step 4: Develop a Plan of Action
-
Develop a specific plan to address each concern raised by the client
-
Prioritize urgent issues and allocate resources accordingly
Step 5: Communicate the Plan to the Client
-
Present the plan of action to the client for approval
-
Provide clear explanations and timelines for resolving each concern
Step 6: Implement the Action Plan
-
Assign tasks to relevant team members or subcontractors to address the client’s concerns
-
Confirm that all corrective actions are completed promptly
Step 7: Follow Up with Client for Confirmation
-
Follow up with the client to confirm that their concerns have been fully addressed
-
Document the client’s satisfaction with the final results
Complete all remaining documentation and paperwork for roofing maintenance work
Step 1: Review All Project Documentation for Accuracy and Completeness
-
Review all project documentation for accuracy and completeness, including contracts, inspection reports, change orders, and communication logs
-
Confirm that each document aligns with the project scope and final work completed
Step 2: Compile All Necessary Paperwork into a Comprehensive Package
-
Compile all necessary paperwork into a comprehensive package for the client, including the final inspection report, warranty information, quality control checklists, and maintenance records
-
Organize the package into clear sections for easy client reference
Step 3: Verify Compliance with Contractual and Regulatory Requirements
-
Verify that all documentation complies with contractual obligations and regulatory requirements, such as building codes, safety standards, and environmental guidelines
-
Address any discrepancies or missing documents promptly to ensure full compliance
Step 4: Prepare Final Payment and Invoice Documents (if applicable)
-
Prepare final payment and invoice documents for the client, detailing all completed work, materials used, and any additional charges
-
Include a clear breakdown of costs to facilitate client understanding and approval
Step 5: Document All Project Communications and Closeout Activities in CRM
-
Document all project communications and closeout activities in CRM, ensuring that key details are recorded for future reference
-
Link all documents to the client’s project file for easy retrieval during warranty or maintenance periods
Step 6: Distribute Final Documentation Package to the Client
-
Distribute the final documentation package to the client, either as a physical binder or a digital folder, based on their preferences
-
Confirm receipt and address any questions the client may have about the documents
Step 7: Save All Finalized Documents in Project Records for Archiving
-
Save all finalized documents in project records and archiving systems, ensuring that physical and digital copies are securely stored
Ensure all warranties and manuals related to roofing maintenance are compiled and provided to the client
Step 1: Compile All Warranties and Maintenance Manuals
-
Compile all warranties and maintenance manuals related to the roofing work, including product warranties, manufacturer guidelines, and maintenance schedules
-
Confirm that each document is current and complete according to the project specifications
Step 2: Organize Warranty and Manual Documents into a Client Package
-
Organize the warranty and manual documents into a clear and concise client package, such as a binder or digital folder, for easy reference
-
Include a summary sheet that highlights key warranty terms, coverage periods, and contact information for claims
Step 3: Verify the Accuracy and Completeness of Warranty Information
-
Verify the accuracy and completeness of all warranty information, checking for any missing pages, discrepancies, or outdated terms
-
Confirm that the warranty documents cover all installed materials and completed repairs
Step 4: Provide Instructions for Warranty Claims and Maintenance Requirements
-
Provide instructions for warranty claims and maintenance requirements, explaining the steps the client should follow in case of an issue
-
Highlight key maintenance tasks that the client must perform to maintain warranty coverage
Step 5: Review Warranty and Manual Package with the Client
-
Review the warranty and manual package with the client, addressing any questions or concerns they may have about the documents or coverage terms
-
Confirm that the client understands their responsibilities and how to access support
Step 6: Document the Distribution of Warranty and Manual Package in CRM
-
Document the distribution of the warranty and manual package in CRM, linking it to the client’s file for reference during future communications or claims
-
Save a digital copy of the package in the project records for secure storage
Step 7: Communicate Ongoing Support and Follow-Up Services to the Client
-
Communicate your ongoing support and follow-up services to the client, reassuring them of your availability for future assistance or additional maintenance needs
Obtain final approvals and sign-offs from relevant authorities for roofing work
Step 1: Obtain Written Approvals
-
Once the inspections are successfully completed obtain written approvals and sign-offs from the relevant authorities
-
Ensure the approvals are clearly documented and include any conditions or notes provided by the inspectors
Step 2: Document Approvals
-
Record the details of the final approvals and sign-offs in your project management system
-
Include copies of the written approvals and any related documentation
Step 3: Inform Project Team
-
Notify the Project Manager and other relevant internal stakeholders that the final approvals and sign-offs have been obtained
-
Provide any necessary instructions for accessing and reviewing the documentation
Step 4: Store Approvals Securely
-
Ensure copies of all final approvals and sign-offs are securely stored in the project records
-
Maintain easy access to these documents for future reference or audits
Remove all roofing maintenance equipment and clean up the site
Step 1: Prepare a Site Cleanup and Equipment Removal Plan
-
Prepare a site cleanup and equipment removal plan that outlines key tasks such as dismantling equipment, collecting tools, and disposing of waste
-
Assign responsibilities to crew members for each cleanup and removal task
Step 2: Gather Necessary Tools and Safety Equipment for Equipment Removal
-
Gather the necessary tools and safety equipment for removing roofing maintenance equipment, such as lifting devices, gloves, and safety harnesses
-
Ensure that all crew members are equipped with appropriate personal protective equipment (PPE)
Step 3: Dismantle and Transport Equipment to Storage or Return Locations
-
Dismantle and transport all roofing maintenance equipment to designated storage or return locations, following safety protocols to prevent damage or injuries
-
Confirm that all equipment is accounted for and properly secured during transport
Step 4: Clear Debris and Dispose of Waste Materials Properly
-
Clear debris from the site and dispose of waste materials according to environmental guidelines and local regulations
-
Confirm that all walkways, access points, and storage areas are clean and free of hazards
Step 5: Inspect the Site for Any Remaining Items or Issues
-
Inspect the site to ensure that all equipment, tools, and materials have been removed and that no hazards or obstructions remain
-
Address any final cleanup tasks or issues identified during the inspection
Step 6: Communicate Completion of Equipment Removal and Cleanup to Project Team
-
Communicate the completion of equipment removal and cleanup to the project team, confirming that the site is ready for the final safety check or client inspection
-
Document any notable issues or actions taken during the cleanup process
Step 7: Document Equipment Removal and Cleanup Activities in Project Records
-
Document all equipment removal and cleanup activities in project records, including notes, photos, and waste disposal receipts
Perform a final safety check and remove all safety equipment
Step 1: Prepare Safety Checklist
-
Create a comprehensive checklist covering all safety equipment and measures that need to be inspected and removed
-
Ensure the checklist includes items such as fall protection systems safety barriers and PPE
Step 2: Gather Safety Inspection Tools
-
Collect all necessary tools and equipment needed for the safety inspection such as a notepad camera and PPE
-
Ensure everything is in good working condition
Step 3: Conduct Safety Inspection
-
Perform a thorough inspection of the roofing site to ensure all safety measures are still in place and functioning correctly
-
Check fall protection systems safety barriers and any other safety equipment used during the project
Step 4: Document Findings
-
Record detailed notes and take photographs of the current state of all safety equipment
-
Use the safety checklist to ensure all aspects are covered
Step 5: Verify Equipment Condition
-
Inspect each piece of safety equipment for any signs of wear damage or malfunction
-
Ensure all equipment is in good condition and safe to use
Step 6: Dismantle Safety Systems
-
Safely dismantle and remove all safety equipment from the site
-
Ensure fall protection systems safety barriers and other equipment are carefully taken down and packed
Step 7: Transport Safety Equipment
-
Arrange transportation for all safety equipment back to the storage facility
-
Ensure all equipment is securely loaded and transported safely
Step 8: Dispose of Damaged Equipment
-
Properly dispose of any damaged or worn-out safety equipment according to local regulations
-
Ensure disposal is done in an environmentally responsible manner
Step 9: Store Equipment Securely
-
Ensure all safety equipment is securely stored at the storage facility
-
Maintain an inventory of equipment to ensure nothing is missing or damaged
Step 10: Record Safety Check Completion
-
Document the completion of the final safety check and removal of safety equipment in your project management system
-
Include details such as the date participants and any issues encountered
Conduct a project debrief with the roofing team to review successes and areas for improvement
Step 1: Schedule Debrief Meeting
-
Coordinate with the roofing team to schedule the project debrief meeting
-
Confirm the date time and location for the meeting
Step 2: Prepare Meeting Agenda
-
Create a detailed agenda for the debrief meeting covering key topics such as project successes challenges and lessons learned
-
Share the agenda with the team ahead of the meeting to ensure everyone is prepared
Step 3: Gather Project Documentation
-
Collect all relevant project documentation including final reports inspection records and feedback from the GC
-
Ensure you have copies for reference during the meeting
Step 4: Conduct Debrief Meeting
-
Hold the project debrief meeting with the roofing team
-
Discuss the project from start to finish highlighting key achievements and areas for improvement
Step 5: Identify Successes
-
Encourage team members to share their experiences and identify what went well during the project
-
Document the successful aspects and strategies that can be applied to future projects
Step 6: Discuss Challenges
-
Review any challenges or issues encountered during the project
-
Identify the root causes and discuss how they were addressed and resolved
Step 7: Gather Feedback
-
Solicit feedback from the team on the overall project process including communication resource allocation and support
-
Use this feedback to identify areas for improvement
Step 8: Document Lessons Learned
-
Record the key lessons learned from the project including both successes and areas for improvement
-
Ensure the documentation is clear and easily accessible for future reference
Step 9: Develop Action Plan
-
Based on the feedback and lessons learned develop an action plan for improving future projects
-
Assign responsibilities and set deadlines for implementing the improvements
Step 10: Share Debrief Outcomes
-
Share the documented outcomes and identified improvements with relevant stakeholders including project managers and company leadership
-
Ensure everyone is aware of the lessons learned and how they will be applied to future projects
Archive all project documents and records related to roofing maintenance work
Step 1: Review and Organize All Project Documents for Archiving
-
Review and organize all project documents for archiving, including contracts, inspection reports, maintenance logs, invoices, and communication records
-
Confirm that each document is complete, accurately labeled, and ready for long-term storage
Step 2: Create a Digital Archive of Project Documents
-
Create a digital archive of all project documents, scanning physical records as needed and organizing files by category and date
-
Save digital copies in the company’s secure cloud storage or document management system for easy retrieval
Step 3: Label and Store Physical Documents in Secure Storage
-
Label and store physical documents in secure storage, such as a designated archive room or filing cabinets
-
Use clear labels that indicate the project name, dates, and document types for easy reference
Step 4: Verify Compliance with Document Retention Policies
-
Verify that all archived documents comply with company policies and legal requirements for document retention, such as retention periods and security standards
-
Confirm that sensitive or confidential information is stored in accordance with data protection guidelines
Step 5: Update CRM and Project Records with Archived Document Information
-
Update the CRM and project records with archived document information, linking digital records to the client’s file for easy access during future reviews or audits
-
Note the location and access permissions for physical records
Step 6: Communicate Document Archiving Completion to Key Stakeholders
-
Communicate the completion of document archiving to key stakeholders, such as the project manager, finance team, and quality control personnel
-
Confirm that all relevant team members know how to access archived documents if needed
Step 7: Perform Regular Audits to Confirm the Integrity of Archived Records
-
Schedule regular audits to confirm the integrity of archived records, ensuring that digital and physical copies remain accessible, accurate, and secure
Ensure all financials are settled and final invoices for roofing maintenance work are sent to the client
Step 1: Review Project Financial Records with Accounting Team
-
Review the project financial records with the accounting team to confirm all expenses, payments, and outstanding invoices
-
Ensure that all financial entries are accurate and up-to-date
Step 2: Verify Outstanding Balances and Payment Schedules
-
Verify any outstanding balances and payment schedules, ensuring that all subcontractors, suppliers, and crew members have been paid according to the project terms
-
Confirm that all payments have been processed or are scheduled as planned
Step 3: Reconcile Final Project Expenses and Adjustments
-
Reconcile all final project expenses, including any adjustments for change orders, material substitutions, or additional labor
-
Confirm that all adjustments are reflected in the financial records
Step 4: Prepare Final Invoices for Client and Insurance Company (if applicable)
-
Prepare final invoices for the client and insurance company (if applicable), detailing all completed work, materials used, and any additional charges
-
Include a clear breakdown of costs for easy client reference
Step 5: Review and Approve Final Invoices with Project Manager
-
Review the final invoices with the project manager, confirming that all charges and descriptions align with the completed work
-
Obtain the project manager’s approval before submission
Step 6: Send Final Invoices to Client and Confirm Receipt
-
Send the final invoices to the client using the specified submission method (e.g., email, postal service, or portal)
-
Follow up to confirm that the client has received the invoices and to address any questions
Step 7: Document Financial Settlement and Invoice Submission in CRM
-
Document the financial settlement and final invoice submission in the CRM, noting the date, amount, and client confirmation
-
Update the project status to reflect financial closure
Prepare and submit final invoice and closeout documents to the client
Step 1: Gather Closeout Documents
-
Gather all closeout documents required for the roofing project, including warranties, maintenance manuals, and final inspection reports
-
Ensure all documents are up-to-date and signed as needed
Step 2: Prepare Final Project Summary
-
Create a final project summary for the client, detailing the scope of work, key milestones, and accomplishments
-
Include a brief overview of project challenges and resolutions
Step 3: Organize Closeout Package for Client
-
Organize the closeout documents and final project summary into a client package
-
Ensure that all documents are clearly labeled and easy to navigate
Step 4: Schedule a Final Meeting with the Client
-
Arrange a final meeting with the client to present the closeout package
-
Confirm the date, time, and location with the client
Step 5: Present Closeout Package to Client
-
Review the closeout package with the client during the final meeting
-
Address any questions or concerns they may have about the documents
Step 6: Obtain Client Acknowledgment of Closeout
-
Request the client’s acknowledgment of the closeout package and final invoice
-
Obtain their signature or email confirmation for documentation
Step 7: Record Completion of Closeout Process
-
Document the completion of the closeout process in project records
-
File a copy of the signed closeout package for future reference