Construction Workflow
Mobilize roofing crew and set up equipment on site
Step 1: Conduct Pre-Mobilization Meeting
Gather the crew to discuss the project scope, safety protocols, and individual responsibilities. Ensure everyone understands the project timeline and objectives.
Step 2: Inspect Equipment and PPE
Check all equipment for functionality and safety compliance. Ensure all crew members have the necessary PPE, including hard hats, gloves, and harnesses.
Step 3: Transport Equipment to Site
Load equipment onto transport vehicles, ensuring it is securely fastened. Use appropriate lifting techniques to prevent injury.
Step 4: Set Up Safety Barriers
Upon arrival, set up safety barriers around the work area to protect the crew and the public. Ensure all barriers are clearly visible and stable.
Step 5: Assemble Scaffolding and Ladders
Assemble scaffolding according to manufacturer instructions, ensuring it is level and secure. Position ladders at a safe angle and check for stability.
Step 6: Conduct Safety Briefing
Hold a safety briefing to review potential hazards and emergency procedures. Ensure all crew members are aware of their roles in maintaining a safe work environment.
Step 7: Verify Communication Equipment
Check that all communication devices are operational. Establish a communication protocol for the crew to follow during the project.
Step 8: Begin Work
Once all equipment is set up and safety measures are in place, the crew can begin work on the restoration project. Monitor the site continuously for safety and efficiency.
Conduct site safety briefing with roofing crew
Step 1: Prepare safety materials
Gather all necessary safety materials including the site-specific safety plan, emergency contact list, and personal protective equipment (PPE) such as hard hats, gloves, and safety harnesses. Ensure that all materials are up-to-date and comply with regional safety regulations.
Step 2: Assemble the roofing crew
Ensure all crew members are present and accounted for. Conduct a roll call if necessary. Choose a location that is safe and free from distractions for the briefing.
Step 3: Review the safety plans
Go over the site-specific safety plan in detail. Highlight key areas such as fall protection measures, electrical safety, and weather-related precautions. Use visual aids if available to enhance understanding.
Step 4: Distribute PPE
Hand out personal protective equipment to each crew member. Ensure that everyone knows how to properly use and maintain their PPE. Check that all equipment fits correctly and is in good condition.
Step 5: Explain emergency procedures
Detail the emergency procedures including evacuation routes, assembly points, and the location of first aid kits. Ensure everyone knows who the designated first aid responders are and how to contact emergency services.
Step 6: Outline safe work practices
Discuss safe work practices specific to roofing and storm damage restoration. Emphasize the importance of maintaining a clean work area, using tools correctly, and being aware of surroundings at all times.
Step 7: Encourage questions and feedback
Invite crew members to ask questions or provide feedback on the safety procedures. Address any concerns or suggestions they may have. This helps ensure everyone is on the same page and feels comfortable with the safety measures.
Step 8: Document the briefing
Record the details of the briefing including the date, time, attendees, and topics covered. Use a standardized form if available. This documentation is important for compliance and future reference.
Coordinate with Subcontractors on Site
Step 1: Identify Subcontractors Present on Site
Upon arrival at the site, conduct a walkthrough to identify all subcontractors present. Use the project roster to verify their roles and responsibilities.
Step 2: Establish a Point of Contact
For each subcontractor, establish a primary point of contact. Exchange contact information, including phone numbers and email addresses, to facilitate communication.
Step 3: Hold a Coordination Meeting
Organize a meeting with all subcontractors to discuss the project timeline, deliverables, and any specific requirements. Ensure everyone understands their roles and the overall project objectives.
Step 4: Review Safety and Site Access Rules
Go over the safety protocols and site access rules with the subcontractors. Emphasize the importance of compliance to ensure a safe working environment.
Step 5: Confirm Communication Methods
Confirm how subcontractors should reach you for urgent matters. Establish preferred communication channels, such as phone calls for emergencies and emails for routine updates.
Step 6: Document Information
Keep a detailed record of all communications and agreements made with subcontractors. Use a logbook or digital tool to document meeting notes, contact information, and any changes to the project plan.
Step 7: Request Regular Updates
Ask subcontractors to provide regular updates on their progress. Set a schedule for these updates, such as daily briefings or weekly reports, to stay informed about the project's status.
Verify delivery and inventory of repair materials
Step 1: Confirm Delivery Schedules with Suppliers
-
Confirm the delivery schedules with suppliers for all ordered repair materials
-
Verify the delivery dates and times to ensure they align with the project plan
Step 2: Inspect Delivered Materials
-
Inspect all delivered materials on arrival to confirm that they meet the required specifications and quality standards
-
Check for any visible damage or defects
Step 3: Count and Record Inventory
-
Count and record the quantity of each delivered material, verifying that it matches the order details
-
Update inventory records in the project management system
Step 4: Store Materials Securely On-Site
-
Store the delivered materials in designated secure areas on-site
-
Ensure that materials are protected from environmental factors and unauthorized access
Step 5: Report Discrepancies or Issues
-
Report any discrepancies, missing items, or quality issues to the project manager and suppliers immediately
-
Document the issues and initiate replacement or return processes if needed
Step 6: Communicate Inventory Status to Project Team
-
Communicate the inventory status and any issues to the project team
-
Confirm that the necessary materials are available to begin the repair work
Step 7: Monitor and Update Inventory Records
-
Monitor the inventory regularly to track usage and stock levels
-
Update inventory records in real-time to maintain accuracy
Prepare roof deck for repair (e.g., clean, inspect)
Step 1: Clear Debris from Roof Deck
-
Clear the roof deck of any debris, old materials, or loose objects
-
Use appropriate tools and equipment to remove debris safely
Step 2: Inspect Roof Deck for Damage
-
Inspect the roof deck for signs of damage, such as rot, warping, or structural weaknesses
-
Document any areas that require additional repair or reinforcement
Step 3: Check for Moisture and Water Damage
-
Check for signs of moisture or water damage on the roof deck
-
Identify the source of any leaks or moisture penetration
Step 4: Reinforce Weak or Damaged Areas
-
Reinforce any weak or damaged areas of the roof deck to ensure structural integrity
-
Use appropriate materials and methods to strengthen the deck
Step 5: Clean the Roof Deck Surface
-
Clean the roof deck surface to remove dust, dirt, and contaminants
-
Ensure that the surface is clean and smooth to facilitate the application of new materials
Step 6: Verify Deck Readiness for Repair
-
Verify that the roof deck is ready for repair by performing a final inspection
-
Confirm that all required preparations have been completed
Step 7: Communicate Roof Deck Readiness to Project Team
-
Communicate the roof deck readiness to the project team, including the project manager and roofing crew
-
Confirm that all team members are aware of the deck’s condition and any specific repair requirements
Remove damaged roofing materials
Step 1: Review Roof Removal Plan
-
Review the roof removal plan with the crew, focusing on safety protocols and key removal tasks
-
Confirm that all team members understand their responsibilities
Step 2: Set Up Safety Equipment and Barriers
-
Set up all necessary safety equipment, such as guardrails, harnesses, and fall protection systems
-
Establish barriers and signs to restrict access to the work area
Step 3: Begin Removal of Surface Roofing Materials
-
Begin removing damaged roofing materials, such as shingles, tiles, or metal panels, starting from the top of the roof and working downwards
-
Use appropriate tools and techniques to avoid further damage
Step 4: Remove and Inspect Underlying Layers
-
Remove underlying layers, such as old underlayment or damaged flashing
-
Inspect the exposed roof deck for signs of damage, moisture, or structural issues
Step 5: Sort and Dispose of Removed Materials
-
Sort the removed materials for disposal or recycling as appropriate
-
Place waste materials in designated disposal containers and confirm that the site remains clear of debris
Step 6: Document Areas Requiring Additional Repairs
-
Document any areas requiring additional repairs, such as sections of damaged decking or rotted wood
-
Communicate findings to the project manager for approval
Step 7: Prepare the Roof Deck for Repairs
-
Prepare the roof deck for any necessary repairs by clearing dust, nails, and debris
-
Ensure that the deck is safe and ready for the next steps
Repair or replace any damaged decking or structural elements
Step 1: Identify Damaged Areas
Conduct a thorough inspection of the roof to identify any visible signs of damage such as cracks, warping, or water stains. Use a moisture meter to detect hidden water damage.
Step 2: Assess Structural Integrity
Evaluate the structural integrity of the decking and supporting elements. Look for signs of rot, mold, or compromised structural components. Consult with a structural engineer if necessary.
Step 3: Remove Damaged Materials
Carefully remove damaged decking and structural elements using appropriate tools such as pry bars and saws. Ensure all debris is collected and disposed of according to local regulations.
Step 4: Install Replacement Materials
Select suitable replacement materials that match the existing structure. Install new decking and structural elements, ensuring they are securely fastened and aligned with existing components.
Step 5: Reinforce Structural Supports
Reinforce any structural supports as needed using additional bracing or metal connectors. Ensure all reinforcements meet local building codes and standards.
Step 6: Conduct Final Inspection
Perform a final inspection to ensure all repairs are completed to a high standard. Check for alignment, secure fastenings, and overall structural integrity. Document the repairs with photos and notes.
Step 7: Clean Up Work Area
Remove all tools, materials, and debris from the work area. Ensure the site is clean and safe for other workers and the client. Dispose of waste materials in accordance with local regulations.
Install roofing underlayment and moisture barrier
Step 1: Select Appropriate Material
Choose the correct type of underlayment and moisture barrier based on the project specifications and local building codes. Consider factors such as climate, roof pitch, and material compatibility.
Step 2: Measure and Cut Underlayment
Measure the roof area accurately. Use a utility knife and straight edge to cut the underlayment to size, ensuring it fits the roof dimensions with minimal waste.
Step 3: Install Drip Edge
Install the drip edge along the eaves and rakes of the roof. Secure it with roofing nails, ensuring it is flush with the roof edge to direct water away from the fascia.
Step 4: Apply Underlayment
Roll out the underlayment horizontally across the roof, starting at the bottom edge. Overlap each row by at least 4 inches. Secure with roofing nails or staples, ensuring fasteners are flush but not tearing the material.
Step 5: Overlap Edges and Seal Penetrations
Ensure all edges are overlapped properly to prevent water ingress. Use roofing tape or sealant around roof penetrations such as vents and chimneys to ensure a watertight seal.
Step 6: Install Moisture Barrier
If required, install a moisture barrier over the underlayment. Follow the same overlapping and sealing procedures to ensure complete coverage and protection.
Step 7: Check for Wrinkles and Bubbles
Inspect the installed underlayment for any wrinkles or bubbles. Smooth out any imperfections using a roller or by lifting and reapplying the material.
Step 8: Final Inspection and Documentation
Conduct a thorough inspection of the installation. Take photographs for documentation and ensure all areas are properly covered and sealed. Record any issues and report them to the project manager.
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Select Roofing Materials
Choose appropriate roofing materials based on building specifications, climate, and budget. Consider durability, aesthetics, and local building codes. Common options include asphalt shingles, clay tiles, and metal panels.
Step 2: Prepare the Roof Surface
Ensure the roof deck is clean, dry, and free of debris. Repair any damaged areas and install underlayment as per manufacturer instructions. Use a chalk line to mark guidelines for material placement.
Step 3: Install Starter Strips
Begin at the bottom edge of the roof. Install starter strips along the eaves to provide a secure base for the first row of roofing material. Ensure strips are aligned and fastened securely.
Step 4: Lay Roofing Material in Rows
Starting from the bottom, lay roofing materials in overlapping rows. Follow manufacturer guidelines for overlap and alignment. Use a nail gun or appropriate fasteners to secure each piece.
Step 5: Secure Materials Properly
Ensure all materials are fastened according to manufacturer specifications. Check for proper nail placement and avoid over-driving nails, which can damage the material.
Step 6: Install Flashing
Install flashing around roof penetrations, valleys, and edges to prevent water infiltration. Use metal flashing and secure it with roofing nails or screws. Seal joints with roofing cement.
Step 7: Install Trim and Finish Edges
Complete the installation by adding trim and finishing edges. Ensure all edges are sealed and trimmed to prevent wind uplift and water entry. Use appropriate tools for cutting and securing trim.
Step 8: Inspect Installation Thoroughly
Conduct a thorough inspection of the completed roof. Check for alignment, secure fastening, and proper sealing. Address any issues immediately to ensure roof integrity.
Step 9: Document the Installation
Take photos of the completed installation for records. Document any deviations from the plan and note any repairs made. Ensure all documentation is stored securely for future reference.
Install flashing and other roof penetrations
Step 1: Prepare the flashing
Gather all necessary materials and tools, including flashing, sealant, and cutting tools. Ensure the flashing is free from damage and suitable for the roof type.
Step 2: Clean the roof penetrations
Thoroughly clean the area around the roof penetrations to remove debris and ensure a proper fit. Use a brush or blower to clear dust and dirt.
Step 3: Measure and cut the flashings
Measure the dimensions of the roof penetrations and cut the flashing to size using tin snips or a metal shear. Ensure precise cuts for a snug fit.
Step 4: Install base flashing
Position the base flashing around the penetration, ensuring it extends beyond the edges. Secure it with roofing nails or screws, depending on the roof material.
Step 5: Apply sealant
Apply a generous bead of roofing sealant around the edges of the base flashing to prevent water ingress. Use a caulking gun for even application.
Step 6: Install step flashing
Install step flashing along the roof slope, interweaving it with each course of shingles. Secure each piece with nails, ensuring overlap for water shedding.
Step 7: Install counter flashing
Position counter flashing over the step flashing, embedding it into the wall or chimney mortar joint. Secure it with appropriate fasteners.
Step 8: Seal the flashing edges
Apply sealant to all exposed edges of the flashing to ensure a watertight seal. Smooth the sealant with a putty knife for a clean finish.
Step 9: Install additional flashing if needed
If additional protection is required, install extra layers of flashing, ensuring each layer is properly sealed and secured.
Step 10: Inspect the flashing installation
Conduct a thorough inspection of the flashing installation to ensure all components are securely fastened and sealed. Check for gaps or misalignments.
Conduct weekly quality control inspections
Step 1: Schedule the inspection
Coordinate with the project manager to schedule the inspection at a time that minimizes disruption to ongoing work. Ensure all relevant personnel are informed of the inspection schedule.
Step 2: Prepare the inspection checklist
Develop a comprehensive checklist that includes all critical aspects of the roofing installation, such as material quality, installation techniques, and safety compliance. Use previous inspection reports to update the checklist as needed.
Step 3: Gather necessary tools
Ensure you have all necessary tools for the inspection, including a camera for documentation, a tape measure, a flashlight, and personal protective equipment (PPE) such as a hard hat and safety glasses.
Step 4: Conduct a visual inspection
Walk the entire roof surface to visually inspect for any signs of damage, improper installation, or material defects. Pay special attention to seams, flashing, and penetrations.
Step 5: Check the insulation quality
Verify that the insulation is installed correctly and is free from moisture or compression. Ensure that the R-value meets the project specifications.
Step 6: Assess safety and compliance
Ensure all safety measures are in place, including fall protection systems and proper signage. Check that all work complies with OSHA standards and local building codes.
Step 7: Evaluate site cleanliness
Inspect the site for debris and ensure that all waste materials are properly disposed of. A clean site is essential for safety and efficiency.
Step 8: Document findings
Record all findings in a detailed report, including photographs and notes on any issues identified. Use a standardized format to ensure consistency.
Step 9: Communicate findings to the crew
Hold a meeting with the crew to discuss the inspection results. Highlight areas of concern and provide guidance on corrective actions needed.
Step 10: Follow up on corrections
Schedule a follow-up inspection to verify that all corrective actions have been completed. Update the inspection report to reflect the status of these corrections.
Perform site cleanup and waste disposal of roofing materials
Step 1: Identify Cleanup Areas
Survey the site to identify all areas requiring cleanup, including the roof and ground level. Mark these areas clearly to ensure comprehensive coverage.
Step 2: Gather Cleanup Supplies
Collect necessary supplies such as heavy-duty trash bags, brooms, shovels, gloves, and safety goggles. Ensure all team members have personal protective equipment (PPE).
Step 3: Sort Waste Materials
Separate waste into categories: recyclable materials, non-recyclable waste, and hazardous materials. Use labeled containers to avoid cross-contamination.
Step 4: Remove Debris from Roof
Carefully remove debris from the roof using brooms and shovels. Lower debris to the ground using a chute or bucket to prevent damage to the property.
Step 5: Collect Ground Level Debris
Gather debris from the ground, ensuring all waste is collected. Use rakes and brooms to ensure thorough cleanup.
Step 6: Dispose of Waste Properly
Transport non-recyclable waste to a designated landfill. Follow local regulations for disposal of hazardous materials.
Step 7: Recycle Materials
Take recyclable materials to a recycling facility. Ensure materials are clean and sorted according to facility requirements.
Step 8: Store and Return Unused Materials
Store unused materials in a secure location. Return any rented equipment to the supplier. Ensure all materials are accounted for.
Step 9: Inspect Final Cleanup
Conduct a final inspection of the site to ensure all debris is removed and the area is clean. Address any missed areas immediately.
Step 10: Document Cleanup Activities
Take photos of the cleaned areas and document the cleanup process. Notify the supervisor of completion and any issues encountered.
Conduct final inspection of the roofing work
Step 1: Schedule the final inspection
Coordinate with the project manager and property owner to schedule a convenient time for the final inspection. Ensure that the roofing crew is available for any immediate corrections if needed.
Step 2: Prepare the inspection checklist
Create a comprehensive checklist that includes all aspects of the roofing work that need to be inspected. This should cover materials, installation quality, flashing, penetrations, and overall appearance.
Step 3: Gather necessary tools and equipment
Ensure you have all necessary tools such as a ladder, flashlight, moisture meter, camera, and the inspection checklist. Safety equipment like hard hats and harnesses should also be prepared.
Step 4: Perform a visual inspection
Conduct a thorough visual inspection of the roof surface. Look for any visible defects, debris, or damage. Ensure that the roof is clean and free of any materials that could cause future issues.
Step 5: Verify installation quality
Check that all roofing materials have been installed according to manufacturer specifications and industry standards. Pay special attention to the alignment and securement of shingles or panels.
Step 6: Inspect flashing and penetrations
Examine all flashing and roof penetrations such as vents, chimneys, and skylights. Ensure they are properly sealed and secured to prevent water infiltration.
Step 7: Check for uniformity
Ensure that the roofing materials are consistent in color and texture. Check for any irregularities that could affect the roof's appearance or performance.
Step 8: Test for leaks
Use a moisture meter to test for any hidden leaks. Pay special attention to areas around flashing and penetrations. Conduct a water test if necessary to ensure the roof is watertight.
Step 9: Document findings
Take detailed notes and photographs of any issues or areas of concern. Use the inspection checklist to ensure all areas have been reviewed and documented.
Step 10: Communicate with the crew
Provide feedback to the roofing crew based on the inspection findings. Discuss any necessary corrections or improvements and ensure they are addressed promptly.
Notify client that roofing repair work is substantially complete
Step 1: Confirm Substantial Completion with Project Manager
-
Confirm substantial completion of the roofing repair work with the project manager and quality control team
-
Verify that all key tasks have been completed and inspected
Step 2: Prepare Substantial Completion Report
-
Prepare a substantial completion report detailing the completed work, key milestones, and any outstanding items
-
Include photos and documentation as needed
Step 3: Schedule Client Notification Call or Meeting
-
Schedule a call or meeting with the client to notify them of the substantial completion of the roofing work
-
Confirm the client’s availability and preferred communication method
Step 4: Notify Client of Substantial Completion
-
Notify the client of the substantial completion of the roofing work, reviewing key details from the substantial completion report
-
Address any initial questions or concerns from the client
Step 5: Confirm Client’s Next Steps
-
Confirm the client’s next steps, such as reviewing the substantial completion report or preparing for the final walkthrough
-
Set expectations for the remaining tasks and timeline
Step 6: Document Client Notification in CRM
-
Document the client notification and key discussion points in the CRM
-
Record any follow-up actions or additional requests from the client
Step 7: Prepare for Final Walkthrough with Client
-
Prepare for the final walkthrough with the client by reviewing the substantial completion report and outstanding items
-
Confirm the walkthrough date and time with the project manager
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.