Construction Workflow
Welcome to the Construction Workflow SOP Template Library for Roof Repair (Residential). Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final installation, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Notify Roofing Crew
- Inform all roofing crew members of the mobilization schedule
- Confirm the date time and location for assembling at the project site
Step 2: Transport Equipment to Site
- Arrange transportation for all necessary roofing equipment and tools
- Ensure all equipment is securely loaded and transported safely to the site
Step 3: Conduct Site Orientation
- Upon arrival conduct a brief site orientation with the crew
- Review the site layout access points and designated areas for equipment storage
Step 4: Set Up Equipment Storage Area
- Designate a secure area for storing roofing equipment and materials
- Ensure the area is organized and easily accessible for the crew
Step 5: Inspect Equipment
- Check all roofing equipment and tools to ensure they are in good working condition
- Perform any necessary maintenance or repairs before use
Step 6: Assemble Roofing Equipment
- Set up all required roofing equipment such as ladders scaffolding and safety barriers
- Ensure equipment is positioned correctly and securely
Step 7: Install Safety Measures
- Set up fall protection systems including guardrails harnesses and safety nets
- Ensure all safety measures comply with OSHA regulations and site-specific safety plans
Step 8: Verify Utility Connections
- Confirm that all necessary utility connections such as electricity for power tools are available and functioning
- Set up temporary utilities if needed
Step 9: Distribute PPE
- Ensure all crew members have the required personal protective equipment (PPE)
- Verify that PPE is in good condition and fits properly
Step 10: Conduct Final Check
- Perform a final check to ensure all equipment is set up correctly and safely
- Confirm that the crew is ready to begin work according to the project schedule
Conduct site safety briefing with roofing crew
Step 1: Prepare Safety Materials
- Gather all necessary safety materials including safety plans PPE and emergency procedures
- Prepare a list of key safety points to cover during the briefing
Step 2: Assemble Roofing Crew
- Gather the roofing crew at a designated meeting area on the site
- Ensure everyone is present and paying attention
Step 3: Review Safety Plans
- Discuss the site-specific safety plan including fall protection electrical safety and material handling
- Highlight any unique hazards or challenges specific to the project site
Step 4: Distribute PPE
- Ensure all crew members have the required PPE such as helmets harnesses gloves and safety glasses
- Review the proper use and maintenance of PPE
Step 5: Explain Emergency Procedures
- Detail the emergency procedures including the location of first aid kits emergency exits and contact information for emergency services
- Ensure everyone knows what to do in case of an accident or emergency
Step 6: Outline Safe Work Practices
- Discuss safe work practices for roofing tasks such as proper ladder usage safe lifting techniques and maintaining a clean work area
- Emphasize the importance of reporting unsafe conditions or near-miss incidents
Step 7: Assign Safety Roles
- Designate safety roles and responsibilities to specific crew members such as safety monitors or first aid responders
- Ensure everyone understands their roles and responsibilities
Step 8: Encourage Questions and Feedback
- Invite crew members to ask questions or provide feedback on the safety plan
- Address any concerns or suggestions to improve site safety
Step 9: Document the Briefing
- Record the details of the safety briefing including the date attendees and topics covered
- Keep a copy of the documentation for your records and compliance purposes
Verify delivery and inventory of repair materials
Step 1: Confirm Delivery Schedules with Suppliers
- Confirm the delivery schedules with suppliers for all ordered repair materials
- Verify the delivery dates and times to ensure they align with the project plan
Step 2: Inspect Delivered Materials
- Inspect all delivered materials on arrival to confirm that they meet the required specifications and quality standards
- Check for any visible damage or defects
Step 3: Count and Record Inventory
- Count and record the quantity of each delivered material, verifying that it matches the order details
- Update inventory records in the project management system
Step 4: Store Materials Securely On-Site
- Store the delivered materials in designated secure areas on-site
- Ensure that materials are protected from environmental factors and unauthorized access
Step 5: Report Discrepancies or Issues
- Report any discrepancies, missing items, or quality issues to the project manager and suppliers immediately
- Document the issues and initiate replacement or return processes if needed
Step 6: Communicate Inventory Status to Project Team
- Communicate the inventory status and any issues to the project team
- Confirm that the necessary materials are available to begin the repair work
Step 7: Monitor and Update Inventory Records
- Monitor the inventory regularly to track usage and stock levels
- Update inventory records in real-time to maintain accuracy
Prepare roof deck for repair (e.g., clean, inspect)
Step 1: Clear Debris from Roof Deck
- Clear the roof deck of any debris, old materials, or loose objects
- Use appropriate tools and equipment to remove debris safely
Step 2: Inspect Roof Deck for Damage
- Inspect the roof deck for signs of damage, such as rot, warping, or structural weaknesses
- Document any areas that require additional repair or reinforcement
Step 3: Check for Moisture and Water Damage
- Check for signs of moisture or water damage on the roof deck
- Identify the source of any leaks or moisture penetration
Step 4: Reinforce Weak or Damaged Areas
- Reinforce any weak or damaged areas of the roof deck to ensure structural integrity
- Use appropriate materials and methods to strengthen the deck
Step 5: Clean the Roof Deck Surface
- Clean the roof deck surface to remove dust, dirt, and contaminants
- Ensure that the surface is clean and smooth to facilitate the application of new materials
Step 6: Verify Deck Readiness for Repair
- Verify that the roof deck is ready for repair by performing a final inspection
- Confirm that all required preparations have been completed
Step 7: Communicate Roof Deck Readiness to Project Team
- Communicate the roof deck readiness to the project team, including the project manager and roofing crew
- Confirm that all team members are aware of the decks condition and any specific repair requirements
Remove damaged roofing materials
Step 1: Review Roof Removal Plan
- Review the roof removal plan with the crew, focusing on safety protocols and key removal tasks
- Confirm that all team members understand their responsibilities
Step 2: Set Up Safety Equipment and Barriers
- Set up all necessary safety equipment, such as guardrails, harnesses, and fall protection systems
- Establish barriers and signs to restrict access to the work area
Step 3: Begin Removal of Surface Roofing Materials
- Begin removing damaged roofing materials, such as shingles, tiles, or metal panels, starting from the top of the roof and working downwards
- Use appropriate tools and techniques to avoid further damage
Step 4: Remove and Inspect Underlying Layers
- Remove underlying layers, such as old underlayment or damaged flashing
- Inspect the exposed roof deck for signs of damage, moisture, or structural issues
Step 5: Sort and Dispose of Removed Materials
- Sort the removed materials for disposal or recycling as appropriate
- Place waste materials in designated disposal containers and confirm that the site remains clear of debris
Step 6: Document Areas Requiring Additional Repairs
- Document any areas requiring additional repairs, such as sections of damaged decking or rotted wood
- Communicate findings to the project manager for approval
Step 7: Prepare the Roof Deck for Repairs
- Prepare the roof deck for any necessary repairs by clearing dust, nails, and debris
- Ensure that the deck is safe and ready for the next steps
Repair or replace any damaged decking or structural elements
Step 1: Identify Damaged Areas
- Conduct a detailed inspection of the roof decking and structural elements
- Mark and document areas that require repair or replacement
Step 2: Assess Structural Integrity
- Evaluate the integrity of the damaged areas to determine the necessary repair work
- Consult with a structural engineer if required
Step 3: Remove Damaged Materials
- Carefully remove any damaged decking, supports, or other structural elements
- Dispose of the removed materials according to safety protocols
Step 4: Install Replacement Materials
- Install new decking or structural elements based on the project specifications
- Use appropriate fasteners and techniques to ensure stability
Step 5: Reinforce Structural Supports
- Reinforce any weak or compromised supports using approved methods
- Confirm that all reinforcements are secure and meet safety standards
Step 6: Conduct Final Inspection of Repairs
- Inspect the repaired or replaced areas to confirm they meet quality standards
- Document the completed repairs in the project records
Step 7: Clean and Prepare Deck for Next Phase
- Remove any debris or tools from the repaired areas
- Confirm that the roof deck is ready for underlayment installation
Install roofing underlayment and moisture barrier
Step 1: Select Appropriate Materials
- Choose the correct type of underlayment and moisture barrier for the roofing project
- Ensure materials meet project specifications and manufacturer guidelines
Step 2: Measure and Cut Underlayment
- Measure the roof area and cut the underlayment to fit allowing for overlaps
- Ensure pieces are cut accurately to avoid gaps and ensure proper coverage
Step 3: Install Drip Edge
- Install a drip edge along the eaves and rakes of the roof to direct water away from the fascia
- Secure the drip edge with roofing nails ensuring it is flush with the roof deck
Step 4: Apply Underlayment
- Starting at the lowest point of the roof roll out the underlayment horizontally across the roof deck
- Secure the underlayment with roofing nails or staples following the manufacturers spacing recommendations
Step 5: Overlap Edges
- Ensure each row of underlayment overlaps the row below by the recommended amount (typically 2-4 inches)
- Overlap end joints by at least 6 inches to prevent water infiltration
Step 6: Seal Penetrations
- Cut and fit the underlayment around roof penetrations such as vents and chimneys
- Use roofing cement or adhesive to seal the edges and ensure a watertight barrier
Step 7: Install Moisture Barrier (if required)
- If an additional moisture barrier is required install it over the underlayment
- Follow the same installation and overlapping procedures to ensure full coverage
Step 8: Check for Wrinkles and Bubbles
- Perform a water test if applicable to check for leaks
- Simulate rain conditions and inspect the interior of the building for any signs of water infiltration
Step 9: Inspect Installation
- Record detailed notes and take photographs of any issues or areas of concern
- Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 10: Document Installation
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Select Roofing Materials
- Choose the appropriate roofing materials based on project specifications and GC preferences
- Ensure all materials meet quality standards and are suitable for the roofs design and climate conditions
Step 2: Prepare Roofing Materials
- Lay out the roofing materials on the ground near the installation area for easy access
- Pre-cut materials as necessary to fit around roof penetrations and edges
Step 3: Start at the Bottom
- Begin installing the roofing materials at the lowest point of the roof typically the eaves
- Work your way up to ensure proper water runoff and overlapping
Step 4: Install Starter Strip
- Install a starter strip or the first row of shingles tiles or panels along the eaves
- Ensure it is straight and securely fastened to provide a solid base for the rest of the roofing material
Step 5: Lay Roofing Material in Rows
- Lay the roofing materials in overlapping rows following the manufacturers guidelines
- Ensure each piece overlaps the one below to prevent water infiltration
Step 6: Secure Materials Properly
- Use the appropriate fasteners for the roofing material (e.g., nails for shingles clips for metal panels)
- Ensure fasteners are driven flush with the surface and are spaced according to manufacturer specifications
Step 7: Install Flashing
- Install flashing around roof penetrations such as chimneys vents and skylights
- Ensure flashing is properly integrated with the roofing material to create a watertight seal
Step 8: Trim and Finish Edges
- Trim roofing materials at the edges ridges and valleys to ensure a clean and finished look
- Secure the edges with appropriate fasteners and cover with ridge caps or edge tiles
Step 9: Inspect Installation
- Conduct a thorough inspection of the installed roofing materials
- Check for proper alignment secure fastening and any potential issues
Step 10: Document Installation
- Record the installation process with photographs and notes
- Keep documentation for quality control and project records
Install flashing and other roof penetrations
Step 1: Prepare Flashing Materials
- Select the appropriate type and size of flashing for the roof penetrations
- Ensure all materials meet project specifications and are compatible with the roofing material
Step 2: Clean Roof Penetrations
- Clean the area around roof penetrations such as chimneys vents and skylights
- Ensure surfaces are free of debris dirt and old roofing material
Step 3: Measure and Cut Flashing
- Measure the roof penetrations and cut the flashing to fit snugly around them
- Ensure pieces are cut accurately to cover the entire penetration area and overlap the roofing material
Step 4: Install Base Flashing
- Install the base flashing at the bottom of the roof penetration
- Secure it with roofing nails or screws ensuring it is flush with the roof surface
Step 5: Apply Sealant
- Apply a generous amount of roofing sealant around the base of the penetration
- Ensure the sealant creates a watertight barrier between the flashing and the roof surface
Step 6: Install Step Flashing
- Install step flashing around the sides of the roof penetration overlapping each piece with the previous one
- Secure each piece with roofing nails or screws ensuring a tight fit
Step 7: Install Counter Flashing
- Install counter flashing over the base and step flashing
- Secure it to the penetration structure such as a chimney or vent pipe with appropriate fasteners
Step 8: Seal Flashing Edges
- Apply roofing sealant to the edges of the flashing to ensure a watertight seal
- Smooth the sealant with a trowel or putty knife for a clean finish
Step 9: Install Additional Flashing (if needed)
- If additional flashing is required for complex penetrations such as skylights or roof valleys install it according to manufacturer guidelines
- Ensure all pieces are properly overlapped and secured
Step 10: Inspect Flashing Installation
- Conduct a thorough inspection of the installed flashing and roof penetrations
- Check for proper alignment secure fastening and any potential issues
Conduct quality control inspections
Step 1: Schedule Regular Inspections
- Schedule regular quality control inspections throughout the roofing project based on key milestones and completion of critical tasks
- Assign specific team members to conduct the inspections
Step 2: Review Project Specifications and Standards
- Review the project specifications and quality standards to be checked during each inspection
- Confirm that the inspection criteria align with industry standards and client requirements
Step 3: Conduct Visual and Structural Inspections
- Conduct thorough visual and structural inspections of the roofing work
- Check for proper installation, alignment, and fastening of roofing materials
Step 4: Inspect Critical Roof Components
- Inspect critical roof components, such as flashing, ventilation systems, and moisture barriers
- Confirm that these components are installed correctly and sealed properly
Step 5: Identify and Document Issues
- Identify and document any issues or defects found during the inspection
- Take photos and record detailed notes for reference and reporting
Step 6: Communicate Findings to Project Manager
- Communicate the inspection findings to the project manager, including any identified issues
- Discuss recommended actions and timelines for addressing the issues
Step 7: Verify Completion of Corrections
- Verify that all corrections have been completed and that the roofing work meets quality standards
- Document the completion of corrections and update project records
Perform site cleanup and waste disposal of roofing materials
Step 1: Identify Cleanup Areas
- Determine the specific areas of the site that require cleanup including the roof ground level and material storage areas
- Create a plan for systematically addressing each area
Step 2: Gather Cleanup Supplies
- Collect all necessary cleanup supplies such as brooms shovels trash bags and dumpsters
- Ensure you have access to safety equipment such as gloves and safety glasses
Step 3: Sort Waste Materials
- Separate recyclable materials from non-recyclable waste
- Identify items that can be reused such as undamaged shingles or metal scraps
Step 4: Remove Debris from Roof
- Clear the roof of any debris such as loose nails shingle scraps and packaging materials
- Use brooms and blowers to ensure a thorough cleanup
Step 5: Collect Ground-Level Debris
- Collect debris that has fallen to the ground around the site
- Use shovels and rakes to gather and bag the waste for disposal
Step 6: Dispose of Waste Properly
- Transport waste materials to the designated disposal area or dumpster
- Ensure all waste is disposed of in accordance with local regulations and environmental guidelines
Step 7: Recycle Materials
- Transport recyclable materials to a recycling facility or arrange for pickup
- Ensure that recycling is done in compliance with local recycling programs and policies
Step 8: Store Remaining Materials Safely
- Organize and store any remaining materials safely on-site
- Ensure they are protected from weather conditions and potential damage
Step 9: Inspect Site for Completeness
- Conduct a final walkthrough of the site to ensure all debris and waste have been removed
- Check for any overlooked areas and address them as needed
Step 10: Document Cleanup Activities
- Record the details of the cleanup activities including the amount of waste disposed of and any recyclable materials processed
- Keep documentation for project records and compliance purposes
Conduct final inspection of the roofing work
Step 1: Schedule Final Inspection
- Coordinate with the project manager roofing crew and relevant stakeholders to schedule the final inspection
- Confirm the date and time ensuring all necessary participants are informed
Step 2: Prepare Inspection Checklist
- Create a comprehensive checklist for the final inspection covering all critical aspects of the roofing work
- Include items such as material quality installation techniques flashing and roof penetrations
Step 3: Gather Necessary Tools
- Collect all tools and equipment needed for the inspection such as a camera measuring tape notepad and PPE
- Ensure you have access to the project plans specifications and previous inspection reports for reference
Step 4: Perform Visual Inspection
- Conduct a thorough visual inspection of the entire roof
- Check for any visible defects such as misaligned shingles gaps in flashing and improperly secured materials
Step 5: Verify Installation Quality
- Ensure that all roofing materials are installed according to manufacturer guidelines and project specifications
- Check for proper overlaps fastening and integration with roof penetrations
Step 6: Inspect Flashing and Penetrations
- Examine flashing around chimneys vents skylights and other roof penetrations
- Ensure flashing is properly installed and sealed to prevent water infiltration
Step 7: Check for Uniformity
- Verify that the roofing materials are uniform in appearance and correctly aligned
- Ensure that there are no color mismatches uneven surfaces or aesthetic issues
Step 8: Test for Leaks
- Perform a water test if applicable to check for leaks
- Simulate rain conditions and inspect the interior of the building for any signs of water infiltration
Step 9: Document Findings
- Record detailed notes and take photographs of any issues or areas of concern
- Use the inspection checklist to ensure all aspects of the roofing work are covered
Step 10: Communicate with Crew
- Discuss the inspection findings with the roofing crew and address any issues immediately
- Provide guidance and corrective actions to ensure quality standards are met
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.