Construction Workflow
Welcome to the Construction Workflow SOP Template Library for Roof Replacement (Residential). Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final installation, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Schedule Crew Mobilization
• Confirm the mobilization date and time with all crew members
• Ensure all necessary personnel are available for the scheduled mobilization
Step 2: Prepare Equipment for Deployment
• Verify that all roofing tools and equipment are loaded and ready for transport
• Double-check that safety equipment is included
Step 3: Arrange Transportation Logistics
• Confirm transportation arrangements for crew and equipment to the site
• Ensure vehicles are equipped for transporting heavy or specialized tools
Step 4: Set Up Staging Area on Site
• Establish a staging area for storing equipment and materials
• Secure the staging area to prevent unauthorized access
Step 5: Perform Equipment Setup
• Set up essential roofing equipment such as ladders, hoists, and scaffolding
• Test equipment functionality and safety features
Step 6: Conduct Site Safety Check
• Perform a site safety check to identify any immediate hazards
• Address any issues before crew members begin work
Step 7: Review Site Plan with Crew
• Review the site plan and work zones with all crew members
• Confirm initial tasks and responsibilities for each team member
Conduct site safety briefing with roofing crew
Step 1: Gather Crew for Safety Briefing
• Assemble all crew members at the designated meeting area
• Ensure all necessary safety materials and documents are available
Step 2: Outline Safety Protocols and Rules
• Go over key safety protocols, including fall protection and equipment handling
• Reinforce the importance of personal protective equipment (PPE)
Step 3: Review Emergency Procedures
• Discuss emergency evacuation procedures and first aid protocols
• Identify crew members trained in first aid or emergency response
Step 4: Assign Safety Responsibilities
• Designate crew members responsible for monitoring safety on site
• Provide clear instructions on reporting hazards or incidents
Step 5: Conduct Equipment Safety Check
• Perform a safety inspection of all equipment and tools to be used
• Confirm that all safety features are operational
Step 6: Review Specific Site Hazards
• Point out any known site-specific hazards or risks
• Advise crew members on how to mitigate these risks
Step 7: Confirm Crew Understanding
• Ask crew members if they have any questions or concerns
• Confirm that all members understand and agree to the safety protocols
Coordinate with any subcontractors on site (if applicable)
Step 1: Identify Subcontractors Present on Site
• Review the schedule to identify which subcontractors are working on site
• Confirm their presence and scope of work for the day
Step 2: Establish Point of Contact
• Assign a designated crew member to act as the point of contact for subcontractor coordination
• Share contact details with the subcontractors
Step 3: Hold a Coordination Meeting
• Meet with subcontractors to discuss their work schedule and any dependencies
• Address any potential overlaps or conflicts in work areas
Step 4: Review Safety and Site Access Rules
• Reiterate site safety rules and access protocols with the subcontractors
• Confirm that subcontractors are using the correct PPE
Step 5: Confirm Communication Channels
• Establish the primary communication channels for the day (e.g., radios or cell phones)
• Ensure all subcontractors know who to contact for issues
Step 6: Document Daily Coordination Details
• Document key details from the coordination meeting, including work schedules and contact information
• Share documentation with relevant crew members
Step 7: Monitor Subcontractor Activities
• Monitor the activities of subcontractors to ensure compliance with project plans
• Address any issues or conflicts promptly
Verify delivery and inventory of roofing materials
Step 1: Confirm Delivery Schedule
• Confirm the delivery schedule with the supplier in advance
• Verify that the delivery aligns with the project timeline
Step 2: Inspect Delivered Materials
• Conduct a visual inspection of delivered materials for any damage
• Check that quantities match the delivery order
Step 3: Cross-Check Delivery with Purchase Order
• Compare the delivery with the original purchase order
• Confirm that all ordered items are included
Step 4: Document Any Discrepancies
• Document any discrepancies between the delivery and the order
• Notify the supplier immediately to resolve issues
Step 5: Secure Materials on Site
• Secure the delivered materials in the designated storage area
• Implement measures to protect materials from weather or theft
Step 6: Update Inventory Records
• Update the project inventory records to reflect the new materials
• Include quantities, locations, and any issues noted
Step 7: Communicate with Project Team
• Inform the project team of the delivery status and any issues
• Confirm that all necessary materials are on hand for the next phase
Prepare roof deck for installation (e.g., clean, inspect)
Step 1: Clear Debris from Roof Deck
• Remove all loose debris, leaves, and foreign objects from the roof deck
• Dispose of debris according to site protocols
Step 2: Inspect Roof Deck for Damage
• Conduct a detailed inspection of the roof deck for signs of damage or wear
• Note any areas requiring repair or reinforcement
Step 3: Check for Structural Integrity
• Assess the structural integrity of the roof deck
• Identify any areas that show signs of rot, water damage, or instability
Step 4: Conduct Moisture Testing
• Use moisture detection tools to check for water infiltration or trapped moisture
• Mark and document any areas with high moisture levels
Step 5: Repair or Reinforce Deck as Needed
• Carry out necessary repairs or reinforcements based on the inspection findings
• Ensure all repairs are completed to meet safety standards
Step 6: Clean and Prepare Surface
• Sweep and clean the roof deck surface thoroughly
• Apply any required primers or treatments to prepare the deck for installation
Step 7: Inspect Final Roof Deck Preparation
• Conduct a final walkthrough of the roof deck to ensure it’s ready for installation
• Address any last-minute issues identified during the walkthrough
Remove existing roofing materials
Step 1: Conduct Pre-Removal Inspection
• Inspect the existing roof to identify areas of damage or structural concerns
• Take photographs of the current roof condition for documentation
Step 2: Set Up Safety Measures
• Set up fall protection systems, including guardrails and safety harnesses
• Ensure that the crew is wearing the required personal protective equipment (PPE)
Step 3: Prepare Tools and Equipment
• Gather the necessary tools for roof removal, such as roofing shovels and pry bars
• Ensure all equipment is in good working condition
Step 4: Remove Roofing Materials in Sections
• Start removing roofing materials from one section at a time to maintain structural stability
• Dispose of the removed materials in designated waste containers
Step 5: Inspect Decking After Material Removal
• After each section is cleared, inspect the decking for damage, rot, or structural issues
• Document any areas that need repair or replacement
Step 6: Clean Roof Deck Surface
• Remove any remaining debris, nails, or fasteners from the roof deck
• Ensure the deck surface is clean and ready for further inspection
Step 7: Conduct Post-Removal Safety Check
• Perform a safety check to ensure no hazards remain after the material removal
• Secure any exposed areas to prevent water ingress
Repair or replace any damaged decking or structural elements
Step 1: Identify Damaged Areas
• Conduct a detailed inspection of the roof decking and structural elements
• Mark and document areas that require repair or replacement
Step 2: Assess Structural Integrity
• Evaluate the integrity of the damaged areas to determine the necessary repair work
• Consult with a structural engineer if required
Step 3: Remove Damaged Materials
• Carefully remove any damaged decking, supports, or other structural elements
• Dispose of the removed materials according to safety protocols
Step 4: Install Replacement Materials
• Install new decking or structural elements based on the project specifications
• Use appropriate fasteners and techniques to ensure stability
Step 5: Reinforce Structural Supports
• Reinforce any weak or compromised supports using approved methods
• Confirm that all reinforcements are secure and meet safety standards
Step 6: Conduct Final Inspection of Repairs
• Inspect the repaired or replaced areas to confirm they meet quality standards
• Document the completed repairs in the project records
Step 7: Clean and Prepare Deck for Next Phase
• Remove any debris or tools from the repaired areas
• Confirm that the roof deck is ready for underlayment installation
Install roofing underlayment and moisture barrier
Step 1: Select Appropriate Underlayment
• Review project specifications to select the appropriate type of underlayment
• Confirm that the selected material meets local building codes
Step 2: Prepare Roof Deck Surface
• Clean the roof deck surface thoroughly to ensure proper adhesion of the underlayment
• Verify that all repairs are complete and stable
Step 3: Install Moisture Barrier
• Apply the moisture barrier evenly over the roof deck according to manufacturer instructions
• Overlap sections to prevent water penetration
Step 4: Secure Underlayment in Place
• Roll out the underlayment in sections, starting from the lowest point of the roof
• Secure the underlayment using nails or staples as specified
Step 5: Inspect and Adjust Installation
• Inspect each section of underlayment for wrinkles, gaps, or improper fastening
• Make adjustments as needed to ensure a smooth, secure installation
Step 6: Seal Seams and Edges
• Seal the seams and edges of the underlayment to create a continuous moisture barrier
• Use approved sealing materials and techniques
Step 7: Document Completed Installation
• Take photographs of the installed underlayment for project records
• Update project documentation to confirm the completion of this phase
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Review Installation Plan and Materials
• Review the project plan and confirm the type and layout of roofing materials
• Check that all materials are available and in good condition
Step 2: Stage Roofing Materials on Site
• Stage roofing materials at the job site in an organized manner
• Ensure materials are easily accessible for the crew and protected from damage
Step 3: Start Installation from the Bottom Edge
• Begin installing roofing materials from the lowest point of the roof
• Follow the installation pattern specified in the project plan
Step 4: Secure Roofing Materials
• Secure each piece of roofing material according to manufacturer guidelines
• Use appropriate fasteners and ensure they are properly driven
Step 5: Check Alignment and Overlaps
• Regularly check that the roofing materials are aligned correctly
• Confirm that overlapping sections are secured and waterproofed
Step 6: Install Ridge Caps or Finishing Elements
• Install ridge caps or other finishing elements at the roof’s highest point
• Confirm that all finishing elements are securely fastened
Step 7: Inspect Completed Installation
• Conduct a thorough inspection of the installed roofing materials
• Address any issues or misalignments before moving to the next phase
Install flashing and other roof penetrations
Step 1: Identify Roof Penetration Points
• Identify all areas where flashing and roof penetrations are required, such as vents and chimneys
• Confirm that all penetrations are accounted for in the project plan
Step 2: Select Appropriate Flashing Materials
• Select flashing materials based on project requirements and local building codes
• Ensure that all materials are of the specified quality
Step 3: Install Base Flashing
• Install base flashing around all roof penetrations to create a watertight seal
• Use approved fastening techniques and materials
Step 4: Secure Flashing in Place
• Secure the flashing using nails or screws as per project specifications
• Ensure that the flashing is tight against the roof surface
Step 5: Install Counter Flashing
• Install counter flashing over base flashing to further protect against water ingress
• Seal the edges using roofing cement or sealant
Step 6: Inspect Flashing and Roof Penetrations
• Inspect each area with flashing to confirm that it is properly sealed and secure
• Test for leaks using water or visual checks
Step 7: Document Completed Flashing Installation
• Take photographs of the completed flashing installations for project records
• Update project documentation to confirm the completion of this phase
Conduct weekly quality control inspections
Step 1: Schedule Weekly Inspections
• Set a specific day and time each week for quality control inspections
• Inform the project team of the inspection schedule in advance
Step 2: Prepare Inspection Checklist
• Develop a detailed checklist based on project specifications and quality standards
• Include key inspection points such as material installation, safety measures, and work progress
Step 3: Conduct Visual Inspection
• Walk through the site to visually inspect key areas of the roof
• Look for visible signs of defects, misalignments, or safety issues
Step 4: Verify Adherence to Standards
• Check that all completed work meets industry standards and project specifications
• Confirm that all work complies with safety and quality requirements
Step 5: Document Findings
• Take photographs of inspected areas, particularly any issues or concerns
• Record inspection notes on the checklist and in project documentation
Step 6: Address Identified Issues
• Discuss any identified issues with the roofing crew or relevant team members
• Assign corrective actions and document the responsible individuals
Step 7: Review and Confirm Completion of Corrections
• Conduct a follow-up inspection to confirm that all corrective actions were completed
• Document and sign off on the corrected items
Perform site cleanup and waste disposal of roofing materials
Step 1: Plan Cleanup Schedule
• Schedule regular cleanup times, such as at the end of each workday and the end of the week
• Assign team members responsible for leading the cleanup effort
Step 2: Gather Cleanup Tools and Equipment
• Gather necessary tools for site cleanup, including brooms, shovels, and disposal bins
• Check that waste containers are available and correctly labeled
Step 3: Remove Roofing Debris
• Remove all roofing debris from the site, including old materials, nails, and fasteners
• Dispose of the debris in designated waste containers
Step 4: Recycle Reusable Materials
• Sort and separate reusable materials, such as leftover roofing shingles or metal scraps
• Place recyclable items in appropriate containers for future use or disposal
Step 5: Clean and Organize Tools
• Clean all tools and equipment used during the roofing work
• Store tools in their designated areas for future use
Step 6: Inspect Site for Remaining Waste
• Conduct a final walkthrough of the site to identify any remaining waste or hazards
• Remove any additional waste and confirm the site is clear
Step 7: Document Cleanup Completion
• Record the completion of the cleanup in project documentation
• Take photographs of the cleaned site for records
Conduct final inspection of the roofing work
Step 1: Review Project Specifications and Plans
• Review the original project specifications and plans to ensure compliance
• Identify key elements of the roof that require final inspection
Step 2: Conduct Visual and Functional Inspections
• Walk through the roof to inspect key areas, including shingles, flashing, and vents
• Check for any visible issues or safety concerns
Step 3: Test Roofing Components
• Test critical roofing components, such as drainage systems and flashing installations, to confirm proper functionality
• Document any test results
Step 4: Verify Warranty and Quality Standards
• Confirm that all roofing work meets warranty and quality standards
• Check that all materials used align with the original purchase orders
Step 5: Document Inspection Results
• Document the results of the inspection, including any areas of concern
• Take photographs of inspected areas for project records
Step 6: Create Final Punch List
• Compile a final punch list of outstanding items or deficiencies identified during the inspection
• Assign responsibilities for addressing each item
Step 7: Schedule Re-Inspection
• Schedule a follow-up inspection to verify the completion of all punch list items
• Confirm the date and time with the project team
Notify client that roofing work is substantially complete
Step 1: Verify Substantial Completion
• Confirm that all major aspects of the roofing work are complete
• Ensure that any remaining work does not impede the use or function of the roof
Step 2: Prepare Substantial Completion Notice
• Draft a substantial completion notice for the client, detailing completed work and any remaining minor tasks
• Include a list of completed phases and key milestones
Step 3: Schedule a Meeting with the Client
• Arrange a meeting with the client to present the substantial completion notice
• Confirm the meeting time and location with the client in advance
Step 4: Present Substantial Completion Notice
• Present the substantial completion notice to the client and review its contents
• Discuss any remaining minor tasks or outstanding items
Step 5: Obtain Client Acknowledgment
• Request the client’s acknowledgment of substantial completion
• Obtain their signature on the substantial completion notice
Step 6: Address Client Questions or Concerns
• Allow the client to ask questions or express concerns about the completed work
• Provide clear responses and document any additional items raised
Step 7: Document Client Acknowledgment
• Record the client’s acknowledgment in the project documentation
• File a copy of the signed substantial completion notice for records
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.