Pre-Construction Workflow
Schedule project kickoff meeting
Step 1: Identify Participants
-
List all key participants who need to attend the project kickoff meeting
-
Include internal team members the GC subcontractors and any other relevant stakeholders
Step 2: Propose Meeting Times
-
Contact all participants to propose three potential dates and times for the meeting
-
Ensure the proposed times are within normal business hours and convenient for all parties
Step 3: Confirm Availability
-
Wait for responses from all participants and confirm a mutually convenient time
-
If the initial suggestions donβt work propose alternative dates
Step 4: Send Confirmation
-
Send a calendar invitation to all participants with the confirmed date time and location (or virtual meeting link)
-
Include a brief agenda outlining the purpose of the meeting
Step 5: Prepare Agenda
-
Draft an agenda covering key points to discuss during the meeting such as project scope roles and responsibilities timelines and any initial concerns
-
Share the agenda with all participants ahead of the meeting
Step 6: Gather Necessary Documents
-
Collect all relevant materials or documents needed for the meeting including project plans initial schedules and any supporting information
-
Ensure all documents are up-to-date and accurately reflect the project details
Step 7: Notify Internal Team Members
-
Inform any internal team members who need to attend the meeting
-
Brief them on their roles and the key points to discuss
Step 8: Confirm Meeting Details with GC
-
Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes
-
Ensure the GC has all the necessary information and is prepared for the meeting
Step 9: Set Up Meeting Space
-
If the meeting is in-person ensure the meeting room is booked and properly set up
-
If the meeting is virtual test the online meeting platform to ensure it is working correctly
Step 10: Document the Process
-
Record the scheduled meeting details in your CRM or project management system
-
Set reminders for the meeting and any follow-up tasks
Hold project kickoff meeting
Step 1: Prepare Meeting Materials
-
Ensure all necessary materials are prepared and organized including project plans schedules and any supporting documents
-
Bring copies of these materials for all participants or ensure digital access if the meeting is virtual
Step 2: Set Up Meeting Space
-
Arrive early to set up the meeting space if the meeting is in-person
-
Ensure all equipment such as projectors or video conferencing tools is functioning properly
Step 3: Introduce Participants
-
Begin the meeting by introducing yourself and any team members present
-
Allow each participant to briefly introduce themselves and their role in the project
Step 4: Outline Meeting Agenda
-
Review the meeting agenda to set expectations and ensure all key points will be covered
-
Clarify the objectives of the meeting and the desired outcomes
Step 5: Discuss Project Scope and Objectives
-
Present an overview of the project scope goals and objectives
-
Highlight the key deliverables and success criteria for the project
Step 6: Review Roles and Responsibilities
-
Clarify the roles and responsibilities of each team member and stakeholder
-
Ensure everyone understands their tasks and how they contribute to the projectβs success
Step 7: Present Project Timeline
-
Walk through the project timeline including key milestones and deadlines
-
Discuss any potential challenges or critical paths that may impact the schedule
Step 8: Address Questions and Concerns
-
Encourage participants to ask questions and express any concerns they may have
-
Provide clear and concise answers to ensure everyone is on the same page
Step 9: Summarize Key Points and Next Steps
-
Summarize the main points discussed during the meeting
-
Outline the next steps and any immediate actions required from the participants
Step 10: Document Meeting Minutes
-
Record detailed minutes of the meeting capturing all key discussions decisions and action items
-
Distribute the meeting minutes to all participants and relevant stakeholders
Introduce client to project manager and key team members
Step 1: Schedule Client Introduction Meeting
-
Determine a suitable time for the client introduction meeting
-
Confirm availability of key team members
Step 2: Prepare a Team Overview Document
-
Create a document that introduces each key team member and their role
-
Include brief biographies and areas of responsibility
Step 3: Conduct Introduction Meeting
-
Begin with introductions of each team member
-
Highlight their specific contributions to the project
Step 4: Review Client Expectations
-
Discuss client expectations for communication and project updates
-
Set a cadence for regular meetings and touchpoints
Step 5: Outline Key Contact Information
-
Provide direct contact information for the project manager and client liaison
-
Confirm preferred contact methods and times
Step 6: Address Client Questions
-
Allow time for the client to ask questions
-
Note any specific client concerns for further action
Step 7: Confirm Next Steps
-
Summarize key actions and upcoming meetings
-
Reiterate project goals and objectives
Conduct detailed roof inspection and assessment
Step 1: Prepare Inspection Checklist
-
Create a detailed checklist covering all aspects of the roof including structural integrity ventilation and drainage
-
Review checklist items for completeness
Step 2: Gather Inspection Tools and PPE
-
Ensure that all necessary tools such as moisture meters drones and ladders are available
-
Verify that all personnel have the required personal protective equipment (PPE)
Step 3: Inspect Roof Exterior and Interior
-
Conduct a visual inspection of the roofβs exterior for damage wear or leaks
-
Check the interior for signs of moisture insulation issues or other structural concerns
Step 4: Document Findings with Photos and Notes
-
Take clear photos of any damaged or suspect areas
-
Record detailed notes regarding the condition and location of each issue
Step 5: Evaluate Roofing Materials
-
Assess the condition and age of the roofing materials
-
Identify areas where materials need repair or replacement
Step 6: Conduct Structural Assessments
-
Evaluate the roofβs structural supports for integrity
-
Check for signs of sagging warping or excessive wear
Step 7: Prepare Inspection Report
-
Compile findings into a comprehensive report
-
Include recommendations for repairs replacements or further inspections
Finalize project plans and specifications
Step 1: Review Initial Project Plans
-
Go through the initial project plans and specifications in detail
-
Verify that all project elements align with the clientβs expectations
Step 2: Confirm Material Specifications
-
Review the list of materials and their specifications
-
Ensure all materials meet quality standards and project requirements
Step 3: Cross-Check Plans with Client Requirements
-
Cross-reference final plans with client feedback or adjustments
-
Identify any discrepancies or updates needed
Step 4: Verify Compliance with Regulations
-
Confirm that plans adhere to all relevant codes and regulations
-
Document any required permits or compliance checks
Step 5: Coordinate with Key Team Members
-
Share finalized plans with the project manager and lead foreman
-
Confirm understanding of key details and deadlines
Step 6: Obtain Client Approval
-
Present the finalized plans and specifications to the client
-
Obtain formal approval and document their acceptance
Step 7: Distribute Finalized Plans
-
Distribute the approved plans to all relevant stakeholders
-
Confirm that each stakeholder has the latest version of the project plans
Verify material pricing and lead times
Step 1: Review Project Requirements
-
Examine the project scope and identify all materials required for the roofing project
-
Ensure you have a comprehensive list of materials with specifications
Step 2: Contact Suppliers
-
Reach out to multiple suppliers to request current pricing and lead times for the required materials
-
Ensure you provide detailed specifications to get accurate quotes
Step 3: Compare Quotes
-
Collect and compare quotes from different suppliers
-
Evaluate the pricing lead times and any additional terms or conditions
Step 4: Verify Lead Times
-
Confirm the lead times provided by each supplier
-
Ensure the lead times align with the project schedule and identify any potential delays
Step 5: Check Supplier Reliability
-
Assess the reliability of each supplier based on past performance references and reviews
-
Ensure they can consistently meet the required delivery schedules
Step 6: Negotiate Terms
-
If necessary negotiate better pricing or lead times with the preferred suppliers
-
Discuss bulk purchasing discounts or expedited shipping options
Step 7: Document Findings
-
Record the verified pricing and lead times for each material
-
Include supplier contact information quotes and any negotiated terms
Step 8: Update Project Budget and Schedule
-
Adjust the project budget and schedule based on the verified material costs and lead times
-
Ensure all changes are documented and communicated to the relevant team members
Develop detailed project schedule
Step 1: Outline Project Phases
-
Break the project into key phases, such as demolition, installation, and final inspection
-
Ensure each phase includes specific goals and deliverables
Step 2: Identify Milestones
-
Identify critical milestones within each project phase
-
Set deadlines for each milestone based on project scope
Step 3: Assign Responsibilities
-
Assign tasks to appropriate team members for each phase
-
Define the roles and responsibilities for each team member
Step 4: Estimate Timeframes
-
Estimate the time required to complete each task and milestone
-
Account for potential delays in critical tasks
Step 5: Review Dependencies
-
Identify dependencies between tasks, such as prerequisite tasks
-
Address potential bottlenecks early in the planning phase, such as prerequisite tasks
-
Address potential bottlenecks early in the planning phase
Step 6: Develop a Timeline
-
Create a comprehensive project timeline using project scheduling software
Step 7: Review with Project Team
-
Present the schedule to the project team
-
Confirm that each team member understands their tasks and deadlines
Confirm client's final selections (materials colors etc.)
Step 1: Schedule Selection Review Meeting
-
Schedule a meeting with the client to review their final selections and preferences
Step 2: Prepare Selection Samples
-
Prepare physical or digital samples of the chosen materials and colors
-
Ensure samples are accessible during the meeting
Step 3: Review Each Selection
-
Go through each selection with the client
-
Confirm and note any changes requested by the client
Step 4: Discuss Alternatives if Needed
-
If a selected item is unavailable, present alternative options
-
Discuss the pros and cons of each alternative
Step 5: Document Final Selections
-
Record the clientβs final selections and obtain their written confirmation
-
Update the selection records in the project management system
Step 6: Update Project Plans
-
Incorporate the final selections into the project plans
-
Verify that updated plans are distributed to all relevant stakeholders
Order materials and equipment
Step 1: Review Final Selections and Project Requirements
-
Examine the GCβs final selections and the project requirements
-
Ensure you have a comprehensive list of all materials and equipment needed for the roofing project
Step 2: Verify Supplier Information
-
Confirm the contact details and ordering procedures for preferred suppliers
-
Ensure you have up-to-date information on pricing lead times and availability
Step 3: Prepare Purchase Orders
-
Draft purchase orders (POs) for all required materials and equipment
-
Include detailed specifications quantities and any specific delivery instructions
Step 4: Obtain Internal Approvals
-
If necessary seek internal approvals for the purchase orders
-
Ensure all relevant stakeholders sign off on the orders before proceeding
Step 5: Place Orders with Suppliers
-
Submit the purchase orders to the selected suppliers via email phone or online ordering system
-
Ensure you receive confirmation of receipt from each supplier
Step 6: Confirm Delivery Schedules
-
Verify the delivery schedules provided by the suppliers
-
Ensure the delivery dates align with the project schedule and adjust if necessary
Step 7: Track Order Status
-
Monitor the status of each order to ensure timely delivery
-
Follow up with suppliers if there are any delays or issues with the order
Step 8: Notify Project Team
-
Inform the project team of the ordered materials and equipment
-
Provide details on expected delivery dates and any special handling instructions
Verify subcontractor availability and schedules (if applicable)
Step 1: Identify Required Subcontractors
-
Identify all subcontractors needed for the project
-
Verify that each subcontractorβs scope aligns with the project requirements
Step 2: Contact Subcontractors
-
Reach out to each subcontractor to confirm their availability for the project timeline
Step 3: Review Subcontractor Schedules
-
Review each subcontractorβs proposed schedule for alignment with the main project timeline
-
Confirm that all work sequences are in the correct order
Step 4: Confirm Scope of Work
-
Confirm each subcontractorβs scope of work, including their deliverables and deadlines
-
Ensure they understand their responsibilities clearly
Step 5: Address Scheduling Conflicts
-
Identify and address any scheduling conflicts or overlaps between subcontractors
-
Adjust timelines and sequences to resolve issues
Step 6: Obtain Written Confirmations
-
Obtain written confirmations from subcontractors on their availability and agreed schedules
-
Document these confirmations in the project records
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Review Subcontractor Scope of Work
-
Assess the proposed scope of work submitted by the subcontractor
-
Ensure that it aligns with the project requirements, timelines, and quality standards
Step 2: Discuss Contractual Terms
-
Meet with the subcontractor to discuss and negotiate key terms such as the payment schedule, deadlines, deliverables, and any contingencies
-
Reach mutual agreements and document all agreed terms
Step 3: Finalize Payment and Deliverables Schedule
-
Establish a clear payment schedule based on project milestones or completion percentages
-
Define specific deliverables linked to each payment phase
Step 4: Prepare Subcontract Documents
-
Draft the final subcontract agreement using the approved terms and conditions
-
Include all supporting documents such as the finalized scope of work, payment schedules, and any special instructions
Step 5: Review Documents Internally
-
Conduct a thorough internal review of the subcontract documents
-
Verify that all project requirements, responsibilities, and legal terms are correctly included
Step 6: Seek Legal Approval (if necessary)
-
Submit the subcontract documents to the legal team for approval
-
Address any revisions suggested by the legal team
Step 7: Obtain Client Approval
-
Present the finalized subcontract documents to the client
-
Obtain written approval or feedback from the client
Obtain client signatures on subcontract (if applicable)
Step 1: Present Subcontract to Client
-
Schedule a meeting with the client to present the finalized subcontract agreement
-
Provide the client with a summary of key points for their review
Step 2: Explain Key Terms
-
Review the essential terms of the subcontract with the client, including deadlines, payment schedules, and responsibilities
-
Ensure that the client fully understands each key term
Step 3: Address Client Concerns
-
Allow the client to ask questions and clarify any concerns they may have regarding the subcontract
-
Document any changes requested by the client
Step 4: Obtain Client Signatures
-
Guide the client through the signing process
-
Ensure all necessary fields are completed correctly
Step 5: Review Signed Document
-
Verify that all required signatures are present and correctly dated
-
Double-check that all documents align with the project records
Step 6: Record and File Subcontract
-
Record the signed subcontract in the project documentation system
-
Store a physical and digital copy in secure project files
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Prepare Signed Copy
-
Make a complete copy of the signed subcontract agreement
-
Include any annexes or supporting documents
Step 2: Verify Accuracy
-
Check that all copies include required signatures and dates
-
Ensure no documents are missing from the subcontract package
Step 3: Send Copy to Subcontractor
-
Send the signed subcontract agreement to the subcontractor through the agreed-upon delivery method (e.g., email, courier, or in person)
-
Confirm that the document package is securely transmitted
Step 4: Confirm Receipt
-
Request an acknowledgment of receipt from the subcontractor
-
Keep a record of their confirmation for project documentation
Review permitting requirements
Step 1: Identify Required Permits
-
Determine the types of permits required for the roofing project such as building permits zoning permits or environmental permits
-
Consult local building codes and regulations to ensure compliance
Step 2: Contact Local Authorities
-
Reach out to local building departments or permitting authorities to confirm the specific requirements for your project
-
Obtain information on application procedures necessary documentation and associated fees
Step 3: Create a Permit Checklist
-
Develop a checklist outlining all the permits needed and the corresponding documentation for each
-
Include deadlines for submission and any special conditions that must be met
Procure permit
Step 1: Submit Permit Applications
-
Submit all required permit applications to the relevant regulatory authorities
-
Include all supporting documents and pay necessary fees
Step 2: Track Permit Status
-
Regularly monitor the status of each submitted permit application
-
Document all updates in a central tracking system
Step 3: Follow Up with Authorities
-
Proactively follow up with regulatory authorities to address any pending issues or delays
-
Respond promptly to any requests for additional information
Step 4: Obtain Approved Permits
-
Collect all approved permits and verify their validity
-
Confirm that each permit includes correct project details and approval dates
Step 5: File and Distribute Permits
-
File copies of the approved permits in the project records
-
Distribute copies to key stakeholders such as the project manager and site supervisor
Create site safety plan
Step 1: Identify Potential Hazards
-
Conduct a thorough assessment of the roofing site to identify potential hazards
-
Consider factors such as fall risks weather conditions electrical hazards and material handling
Step 2: Review Safety Regulations
-
Review relevant safety regulations and standards such as OSHA guidelines for roofing work
-
Ensure your safety plan complies with all legal requirements
Step 3: Define Safety Procedures
-
Develop specific safety procedures to address the identified hazards
-
Include fall protection measures proper use of personal protective equipment (PPE) safe material handling practices and emergency response procedures
Step 4: Assign Safety Roles and Responsibilities
-
Designate safety roles and responsibilities to team members
-
Ensure each person understands their duties such as safety monitoring first aid and equipment inspections
Step 5: Develop a Site Layout Plan
-
Create a site layout plan that highlights safety zones access points and equipment storage areas
-
Ensure clear pathways and emergency exits are marked
Step 6: Specify PPE Requirements
-
List all required PPE for the roofing project such as helmets harnesses gloves and safety glasses
-
Ensure all team members are aware of the PPE requirements and how to use them properly
Step 7: Establish Communication Protocols
-
Define communication protocols for reporting safety concerns and incidents
-
Ensure all team members know how to quickly and effectively communicate any issues
Step 8: Include Emergency Procedures
-
Develop detailed emergency procedures for situations such as falls severe weather and equipment malfunctions
-
Ensure all team members are trained on these procedures and know where emergency equipment is located
Step 9: Conduct Safety Training
-
Organize safety training sessions for all team members
-
Ensure everyone understands the safety plan procedures and their individual responsibilities
Step 10: Document and Distribute the Plan
-
Document the site safety plan in a clear and accessible format
-
Distribute the plan to all team members and relevant stakeholders
-
Ensure it is easily accessible on-site for quick reference
Create fall protection plan
Step 1: Create fall protection plan
-
Conduct a thorough assessment of the roofing site to identify potential fall hazards
-
Focus on areas such as roof edges skylights roof openings and ladders
Step 2: Review Regulatory Requirements
-
Review relevant fall protection regulations and standards such as OSHA guidelines for roofing work
-
Ensure your fall protection plan complies with all legal requirements
Step 3: Select Appropriate Fall Protection Systems
-
Determine the most suitable fall protection systems for the identified hazards
-
Options may include guardrails safety nets personal fall arrest systems and warning line systems
Step 4: Define Safe Work Procedures
-
Develop specific procedures for safe work practices to prevent falls
-
Include guidelines for using fall protection equipment accessing and egressing the roof and working near roof edges
Step 5: Assign Responsibilities
-
Designate fall protection responsibilities to team members
-
Ensure each person understands their duties such as inspecting equipment setting up fall protection systems and monitoring compliance
Step 6: Specify PPE Requirements
-
List all required personal protective equipment (PPE) for fall protection such as harnesses lanyards and anchor points
-
Ensure all team members are trained on the proper use and maintenance of PPE
Step 7: Develop Rescue Procedures
-
Create detailed rescue procedures for situations where a fall occurs
-
Include steps for safely retrieving a fallen worker and providing first aid
Step 8: Conduct Fall Protection Training
-
Organize fall protection training sessions for all team members
-
Ensure everyone understands the fall protection plan the use of equipment and their individual responsibilities
Step 9: Install Fall Protection Systems
-
Ensure the installation of fall protection systems according to the plan
-
Verify that all systems are properly set up and functioning before work begins
Step 10: Inspect and Maintain Equipment
-
Establish a routine inspection and maintenance schedule for fall protection equipment
-
Ensure all equipment is in good condition and safe to use
Establish project communication plan
Step 1: Identify Communication Needs
-
Determine the communication needs for the project including the types of information that need to be shared such as project updates schedule changes and safety alerts
-
Consider the stakeholders involved such as the project team subcontractors and the GC
Step 2: Define Communication Methods
-
Select the appropriate communication methods for the project such as email phone calls text messages project management software and in-person meetings
-
Ensure the chosen methods are accessible and convenient for all stakeholders
Step 3: Establish Communication Schedule
-
Create a communication schedule that outlines when and how often updates and meetings will occur
-
Include regular progress meetings daily briefings and emergency communication protocols
Step 4: Develop Standardized Templates
-
Create standardized templates for common communication needs such as project updates meeting agendas and safety alerts
-
Ensure templates are clear concise and easy to use
Step 5: Set Up Communication Channels
-
Ensure all communication channels are set up and functioning properly
-
Provide access and training to all team members on how to use the chosen communication tools
Step 6: Define Information Flow
-
Establish a clear flow of information to ensure that updates and important messages reach all relevant stakeholders
-
Specify how information will be documented shared and stored
Step 7: Implement Feedback Mechanisms
-
Develop feedback mechanisms to allow team members and stakeholders to provide input and ask questions
-
Ensure there is a process for addressing and responding to feedback promptly
Step 8: Conduct Communication Training
-
Organize training sessions for all team members on the communication plan and tools
-
Ensure everyone understands their roles responsibilities and the importance of effective communication
Step 9: Monitor and Adjust the Plan
-
Regularly monitor the effectiveness of the communication plan and make adjustments as needed
-
Seek feedback from the team and stakeholders to continuously improve communication processes
Prepare equipment for mobilization
Step 1: Inspect Equipment Condition
-
Conduct a detailed inspection of all equipment to ensure itβs in good working order
-
Record any issues or maintenance requirements
Step 2: Schedule Maintenance and Repairs
-
Perform or schedule necessary maintenance and repairs for all equipment
-
Document completed maintenance tasks and update equipment logs
Step 3: Organize Equipment by Phase
-
Arrange equipment based on the sequence of project phases
-
Ensure that critical equipment is readily accessible for initial phases
Step 4: Verify Equipment Safety Features
-
Check that all safety features, such as alarms and safety locks, are functioning correctly
-
Test backup systems for critical equipment
Step 5: Secure Transport Logistics
-
Coordinate transportation for heavy equipment and tools to the job site
-
Ensure that all equipment is securely loaded and protected during transport
Step 6: Create Equipment Inventory List
-
Prepare a detailed inventory list of all mobilized equipment
-
Include serial numbers, quantities, and assigned team members for each item
Step 7: Communicate Equipment Plan to Team
-
Share the equipment mobilization plan with the project team
-
Confirm that all members understand their roles and responsibilities
Prepare site for construction
Step 1: Set Up Site Access Control
-
Establish entry and exit points for workers and equipment
-
Implement security measures such as fencing and access badges
Step 2: Install Temporary Facilities
-
Set up temporary facilities like restrooms, break areas, and tool storage
-
Ensure these facilities are compliant with safety regulations
Step 3: Mark Work Zones and Hazards
-
Clearly mark work zones and potential hazards using signage and barriers
-
Designate areas for specific tasks, like materials storage and waste disposal
Step 4: Prepare Site Utilities
-
Arrange for temporary utilities, such as power, water, and lighting
-
Verify that utility setups are safe and adequate for project needs
Step 5: Conduct Initial Safety Walkthrough
-
Perform a walkthrough of the site with the safety officer to identify any safety issues
-
Address and document issues that need immediate correction
Step 6: Verify Environmental Protection Measures
-
Install environmental protection measures, such as erosion controls or dust suppression
-
Confirm that all measures are in compliance with regulations
Step 7: Review Site Readiness with Team
-
Hold a meeting with the project team to review site readiness
-
Confirm that all members are aware of their initial tasks and responsibilities
Conduct final pre-construction review meeting
Step 1: Review Project Scope and Objectives
-
Reiterate the project scope and primary objectives to the team
-
Ensure all members understand their roles and responsibilities
Step 2: Confirm Permits and Compliance
-
Verify that all required permits have been obtained and are up to date
-
Review compliance measures and documentation
Step 3: Discuss Safety and Quality Standards
-
Reaffirm safety guidelines and protocols with the team
-
Highlight quality standards and inspection processes
Step 4: Confirm Resource Availability
-
Check the availability of materials, equipment, and personnel for the project start date
-
Address any resource-related concerns
Step 5: Review Communication Protocols
-
Go over the established communication plan, including reporting schedules and emergency contacts
-
Confirm that all team members are clear on communication channels
Step 6: Establish Initial Task Assignments
-
Assign the first set of tasks to team members based on the project schedule
-
Provide any necessary resources or support for task completion
Step 7: Open the Floor for Questions
-
Allow team members to ask questions or raise concerns
-
Document any key issues or action items for follow-up