Sales Workflow
Make initial contact with potential client (phone call or email)
Step 1: Gather Client Information
-
Obtain the client's name contact information (phone number and email) and initial project details Confirm the source of the lead and record any pertinent referral details in the CRM
Step 2: Prepare Introduction
-
Draft a professional and friendly script or email template to introduce yourself and your company highlighting key services related to residential roof replacement
-
Ensure the message sets expectations for the initial communication
Step 3: Verify Contact Method
-
Check whether the client has a preferred contact method (phone call text or email) and adjust your communication approach accordingly
-
Make note of the client's preferred contact time if mentioned
Step 4: Make Contact
-
Call or email the client using the prepared script or template Confirm that the client is interested in proceeding with an initial consultation or discovery meeting If leaving a voicemail state your name company and reason for calling clearly
Step 5: Schedule Follow-Up
-
If the client does not respond within 48 hours plan to follow up with another call or email
-
For follow-up use a slightly revised script or message expressing a willingness to answer any questions they might have
Step 6: Record Contact Outcome
-
Update your CRM with the details of the attempted contact including the time date and method used
-
Make a note of any specific requests or concerns expressed by the client during the conversation
Step 7: Send Confirmation
-
If the client confirms interest send an email summarizing the conversation including any agreed follow-up actions and the next steps for the project
Schedule discovery meeting
Step 1: Propose Meeting Times
-
Contact the GC via phone or email to suggest three potential dates and times for the meeting.
-
Ensure the proposed times are within normal business hours.
Step 2: Confirm Availability
-
Wait for the GC's response and confirm a mutually convenient time.
-
If the initial suggestions don't work propose alternative dates.
Step 3: Send Confirmation
-
Send a calendar invitation to the GC with the confirmed date time and location (or virtual meeting link).
-
Include a brief agenda outlining the purpose of the meeting.
Step 4: Prepare Agenda
-
Draft an agenda covering key discussion points such as project scope budget timeline and any specific requirements from the GC.
-
Share the agenda with the GC ahead of the meeting.
Step 5: Gather Necessary Documents
-
Collect any relevant materials or documents needed for the meeting (e.g. brochures past project examples note-taking tools).
Step 6: Prepare Internal Team
-
Inform any team members who need to attend the meeting.
-
Brief them on their roles and the key points to discuss.
Step 7: Confirm Meeting Details
-
Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes.
-
Ensure that the meeting room (if in-person) or virtual meeting setup is ready.
Step 8: Record in CRM
-
Update your CRM with the scheduled meeting details and any relevant notes.
-
Set reminders for the team members involved.
Conduct client discovery meeting
Step 1: Prepare for the Meeting
-
Review any preliminary information gathered about the client’s project requirements
-
Bring any necessary forms checklists or documents to the meeting
Step 2: Start the Meeting
-
Introduce yourself and any team members present
-
Explain the purpose and structure of the meeting
Step 3: Gather Information
-
Ask targeted questions to understand the client's needs preferences and project scope
-
Take detailed notes throughout the meeting
Step 4: Address Client Questions
-
Allow the client to ask any questions they have regarding the project timeline materials or budget
-
Provide clear concise answers and take note of any special requests
Step 5: Conclude the Meeting
-
Summarize the key points discussed and the next steps
-
Thank the client for their time and express enthusiasm for the project
Step 6: Document Meeting
-
Record meeting notes in your CRM and share them with relevant team members
-
Assign follow-up tasks as needed to address any questions or action items identified during the meeting
Step 7: Send Meeting Summary
-
Send an email to the client summarizing the meeting discussion and agreed next steps
-
Include any requested documents or additional information
Qualify client based on project scope budget and timeline
Step 1: Review Meeting Notes
-
Analyze the information gathered during the discovery meeting
-
Compare the client’s project scope budget and timeline with your company’s capabilities
Step 2: Assess Alignment
-
Determine if the client’s expectations align with your company’s expertise and resources
-
Decide whether to proceed to the next steps or provide alternative suggestions to the client
Step 3: Internal Discussion
-
Hold a meeting with relevant team members to discuss and finalize the qualification decision
-
Prepare to communicate the outcome to the client in a timely manner
Step 4: Document the Decision
-
Record the qualification decision and the rationale behind it in your CRM
-
Update the client’s status and create notes on future follow-up actions
Step 5: Inform the Client
-
Contact the client via their preferred communication channel to inform them of the decision
-
Provide a clear explanation of the outcome and suggest alternative steps if applicable
Record client information and project details in CRM
Step 1: Access CRM System
-
Log into your company's CRM system using your authorized credentials
Step 2: Create New Client Record
-
Navigate to the section for creating a new client record
-
Select the appropriate project type Roof Replacement – Residential
Step 3: Input Project Details
-
Enter the client’s basic information including name contact details and project scope
-
Include additional notes gathered during initial contact or the discovery meeting
Step 4: Review and Verify Information
-
Double-check all entered information for accuracy
-
Cross-reference with any physical documents or email confirmations from the client
Step 5: Save and Update Status
-
Save the client and project records in the CRM
-
Update the project status to In Progress or a similar status based on company policies
Step 6: Notify Team Members
-
Inform relevant team members that the client information is now available in the CRM
-
Assign any necessary follow-up tasks or schedule internal meetings if needed
Step 7: Regularly Update CRM
-
Set up reminders to regularly update the CRM with new client communications and project progress
-
Ensure that all team members have access to the most recent information
Schedule roof inspection with the client
Step 1: Confirm Client's Availability
-
Contact the client via phone or email to suggest possible dates and times for the roof inspection Allow the client to choose their preferred slot
Step 2: Send Confirmation
-
Send a confirmation email to the client including the agreed date time and any specific instructions or preparations needed for the inspection
Step 3: Assign Inspection Team
-
Assign a qualified inspector or team to conduct the roof inspection
-
Confirm that they have access to the necessary inspection tools and equipment
-
Verify their knowledge of the client's unique requirements or requests
Step 4: Review Client Concerns
-
Review any pre-communicated concerns or questions the client may have shared before the inspection
-
Ensure these points are included in the inspection checklist
Step 5: Prepare Inspection Checklist
-
Create an inspection checklist based on the type and scope of the roof replacement
-
Include sections for recording potential safety hazards or problem areas identified during the inspection
Step 6: Confirm Inspection Logistics
-
Confirm the inspection logistics with the assigned team including the inspection date time and client location
Step 7: Document Scheduled Inspection
-
Record the scheduled inspection date time and assigned team in your project management system to notify all relevant team members
Conduct roof inspection to assess replacement needs
Step 1: Arrive at Client's Location
-
Arrive at the client's location at the scheduled time with all necessary equipment Introduce yourself and briefly explain the inspection process to the client
Step 2: Conduct Safety Briefing
-
Ensure the inspection team is equipped with personal protective equipment (PPE)
-
Review any safety protocols with the team and client focusing on potential risks
Step 3: Begin Visual Assessment
-
Walk the perimeter of the property to visually inspect the roof from the ground
-
Look for visible signs of damage like sagging missing shingles or water stains
Step 4: Inspect Roofing Materials
-
Access the roof safely using appropriate equipment and protective gear
-
Check the condition of shingles underlayment and flashings for signs of wear or damage
-
Pay attention to potential entry points for water or pests
Step 5: Assess Structural Integrity
-
Examine key structural elements such as the roof deck joists and rafters
-
Identify and document areas of weakness leaks or inadequate structural support
Step 6: Take Photographs and Notes
-
Take clear photographs of any damaged areas and make detailed notes
-
Ensure that the photographs are time-stamped for accurate documentation
Step 7: Communicate Findings to Client
-
Provide a summary of your findings to the client explaining any major concerns
-
Offer potential solutions or next steps based on the findings
Step 8: Update Project Management System
-
Record all inspection details in your project management system including photos notes and the client's concerns
Take detailed notes and photos of the roof condition
Step 1: Use Standardized Note Format
-
Use a standardized format for recording inspection notes including sections for damage areas potential causes and recommended actions
Step 2: Capture Clear Photographs
-
Take wide-angle photos to show the overall roof condition
-
Focus on close-up shots of damaged areas or structural concerns
-
Verify that each photograph is time-stamped
Step 3: Label Photos for Clarity
-
Use labels or digital markers to indicate key issues in the photos such as cracks or loose shingles
-
Match each photo to corresponding notes for easy reference
Step 4: Review and Organize Notes
-
Review the notes and photos to ensure accuracy and completeness
-
Organize the notes chronologically or by specific roof sections
Step 5: Discuss Findings with the Team
-
Hold a brief meeting with the inspection team to discuss the key findings
-
Confirm that all important areas have been documented
Step 6: Upload Documentation
-
Upload the notes and labeled photos to the project management system Make sure all information is accessible to relevant team members
Step 7: Notify Project Manager
-
Notify the project manager that the notes and photographs have been uploaded and are ready for review
Discuss client needs, preferences and expectations.
Step 1: Prepare Discussion Points
-
Review the inspection findings and create a list of key discussion points based on potential client concerns
-
Include budget timeline and material options in the agenda
Step 2: Schedule Client Meeting
-
Schedule a meeting with the client at a time that works for them either in-person or virtually Confirm the meeting details via email
Step 3: Review Client Requirements
-
Verify any special requirements or preferences the client mentioned earlier
-
Note any specific materials colors or features they expressed interest in
Step 4: Conduct the Discussion
-
Discuss the client’s needs and expectations regarding the roof replacement project
-
Use the findings from the inspection to guide the conversation
Step 5: Address Client Questions
-
Allow the client to ask questions and clarify any misunderstandings
-
Provide clear and concise answers to all their concerns
Step 6: Finalize Key Decisions
-
Confirm the key decisions made during the discussion including the budget timeline and materials
-
Ensure the client understands the agreed-upon actions
Step 7: Document Meeting Summary
-
Record the key points of the discussion in your project management system including agreed actions and follow-up tasks
Answer any initial questions from the client
Step 1: Open the Floor for Questions
-
Invite the client to ask any initial questions they may have after the inspection Encourage them to express any specific concerns about the project
Step 2: Provide Clear Responses
-
Answer each question thoroughly and ensure the client understands your responses Avoid technical jargon and use simple language when possible
Step 3: Take Notes on Client Concerns
-
Record any additional concerns raised by the client that were not previously identified
-
Add these to the project file for future reference
Step 4: Confirm Understanding
-
Ask the client if they have any remaining questions or if they need clarification on any points Reiterate key takeaways from the discussion
Step 5: Follow-Up with Written Summary
-
Send a brief written summary of the Q&A session to the client
-
Include links to any resources or documents that may help answer further questions
Step 6: Verify Client Satisfaction
-
Ask the client if they feel comfortable with the information provided and address any last-minute concerns
-
Confirm next steps with the client
Step 7: Update Client File
-
Update the client’s file with notes from the Q&A session and any follow-up actions required
Prepare preliminary project proposal based on initial client requirements
Step 1: Review Client Requirements
-
Gather and review all initial requirements and details provided by the client including budget project scope and specific preferences
Step 2: Outline Proposal Structure
-
Create a basic outline for the proposal including key sections such as project scope timeline materials and estimated costs
-
Include any unique requirements from the client
Step 3: Conduct Initial Feasibility Check
-
Evaluate the feasibility of the client’s requirements in terms of budget resources and timeframe
-
Identify any potential challenges or risks that could affect project delivery
Step 4: Draft Proposal Content
-
Write the content for each section of the proposal focusing on clear and concise information
-
Include high-level details such as the overall project goal objectives and benefits
Step 5: Estimate Project Timeline
-
Develop an initial project timeline based on estimated tasks and resource availability
-
Account for potential delays or dependencies
Step 6: Include Supporting Documents
-
Attach relevant documents or references such as project plans sample images or material specifications to support the proposal
Step 7: Review Draft with Key Team Members
-
Share the draft proposal with internal stakeholders or the project manager for feedback before finalizing it
Develop rough estimate of project costs and timeline
Step 1: Gather Initial Project Information
-
Review all initial project information including scope GC requirements and any preliminary notes from consultations.
-
Ensure you have a clear understanding of the project's main components and objectives.
Step 2: Identify Key Project Components
-
Break down the project into key components and tasks.
-
List all major activities materials and resources required for the project.
Step 3: Research Costs for Materials and Labor
-
Collect up-to-date cost data for all materials needed for the project.
-
Consult with suppliers and subcontractors to get current pricing for labor and services.
Step 4: Estimate Labor Costs
-
Calculate the labor costs based on the number of hours required for each task and the hourly rates of your team members.
-
Include any additional labor-related expenses such as overtime or specialized skills.
Step 5: Estimate Material Costs
-
Sum the costs of all materials required for the project.
-
Include potential contingencies for price fluctuations or unforeseen material needs.
Step 6: Calculate Equipment and Overhead Costs
-
Estimate the costs for any equipment rental or usage required for the project.
-
Include overhead costs such as project management administrative expenses and utilities.
Step 7: Develop Preliminary Timeline
-
Outline a rough timeline for the project identifying key milestones and deadlines.
-
Estimate the duration of each task and ensure the timeline aligns with GC expectations.
Step 8: Consider Potential Risks and Contingencies
-
Identify potential risks that could impact project costs or timelines.
-
Include contingency amounts in your cost estimate to account for these uncertainties.
Step 9: Compile the Rough Estimate
-
Combine all cost components (labor materials equipment overhead) into a total project cost estimate.
-
Ensure the estimate is presented clearly with all assumptions and contingencies noted.
Step 10: Review and Validate the Estimate
-
Review the rough estimate with key team members to validate accuracy and completeness.
-
Make any necessary adjustments based on feedback and additional information.
Review preliminary proposal with internal stakeholders
Step 1: Schedule Internal Review Meeting
-
Coordinate with relevant stakeholders to schedule a review meeting
-
Send an agenda and a draft of the preliminary proposal for review before the meeting
Step 2: Present Proposal Outline
-
Present the outline of the proposal including key sections like project scope timeline and estimated costs
-
Emphasize any areas where internal feedback is needed
Step 3: Gather Feedback from Stakeholders
-
Allow each stakeholder to provide feedback on the proposal and raise concerns or suggestions
-
Document key points of discussion and agreed changes
Step 4: Assess Feasibility and Risks
-
Evaluate the feasibility of the proposal based on stakeholder feedback considering resource availability budget constraints and potential risks
-
Identify any gaps or additional resources needed
Step 5: Make Adjustments to Proposal
-
Make necessary changes to the proposal based on stakeholder feedback
-
Update key sections such as cost estimates timeline and project scope
Step 6: Obtain Final Approval
-
Obtain final approval from all stakeholders on the revised proposal
-
Document any additional follow-up tasks or requirements for the final version
Step 7: Document Changes and Feedback
-
Record all changes made to the proposal and stakeholder feedback in the project management system for future reference
Schedule meeting with client to present preliminary proposal
Step 1: Confirm Client’s Availability
-
Contact the client to confirm their availability for a proposal presentation meeting offering multiple date and time options
Step 2: Send Meeting Confirmation
-
Send a confirmation email to the client including the agreed date time and meeting agenda
Step 3: Prepare Meeting Materials
-
Organize and print copies of the preliminary proposal and any supporting documents
-
Prepare a presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Location
-
Confirm the meeting location or virtual meeting setup
-
Test any necessary equipment or presentation software in advance
Step 5: Review Proposal with Internal Team
-
Hold a brief internal meeting to review key points of the proposal and client expectations
-
Assign roles for the meeting such as who will present and who will address specific questions
Step 6: Communicate Meeting Details to Client
-
Send a reminder email to the client a day before the meeting
-
Include any pre-meeting instructions or documents the client should review
Step 7: Update Project Management System
-
Record the scheduled meeting details in the project management system and assign follow-up tasks if necessary
Present preliminary project proposal to client
Step 1: Start with a Brief Introduction
-
Introduce yourself and any team members present at the meeting
-
Briefly explain the purpose of the meeting and the agenda
Step 2: Outline Key Sections of the Proposal
-
Present key sections of the proposal such as project scope timeline and estimated costs
-
Use clear language and avoid technical jargon where possible
Step 3: Highlight Unique Client Requirements
-
Emphasize sections of the proposal that reflect the client’s unique requirements or preferences
-
Offer explanations or context for key decisions in the proposal
Step 4: Address Client Questions
-
Allow the client to ask questions after each section of the presentation
-
Take notes on any areas of concern or additional requests
Step 5: Discuss Potential Adjustments
-
Discuss potential adjustments to the proposal based on the client’s feedback
-
Offer alternative solutions or approaches where needed
Step 6: Confirm Next Steps
-
Confirm the next steps with the client including any follow-up meetings or proposal revisions
-
Set a tentative timeline for finalizing the proposal
Step 7: Document Meeting Outcome
-
Record the outcome of the meeting in your project management system
-
Include key points of discussion client feedback and agreed next steps
Discuss project scope, budget, and timeline
Step 1: Set the Meeting Agenda
-
Outline key topics to cover: project scope budget considerations and timeline options
-
Share the agenda with the client in advance
Step 2: Start with Project Scope
-
Confirm the client's understanding of the project scope
-
Clarify any ambiguities or missing details
Step 3: Present Budget Breakdown
-
Review the budget estimates focusing on materials labor and contingencies
-
Explain major cost items clearly
Step 4: Propose Timeline Options
-
Present the proposed project timeline including key start and end dates
-
Highlight any scheduling constraints or dependencies
Step 5: Address Client Concerns
-
Allow the client to ask questions about the scope budget or timeline
-
Document their concerns and adjust if necessary
Step 6: Make Preliminary Adjustments
-
Discuss possible adjustments based on feedback
-
Ensure the client understands the impact of changes
Step 7: Summarize and Confirm Next Steps
-
Recap the key points and changes discussed
-
Confirm next steps for finalizing the project proposal
Gather feedback from client and address any concerns
Step 1: Invite Feedback from Client
-
Send a follow-up email after the meeting inviting feedback on the proposal
-
Ask for specific comments on the scope budget and timeline
Step 2: Schedule Feedback Discussion
-
Schedule a meeting or call to discuss the client’s feedback in more detail
-
Give the client time to review the proposal
Step 3: Address Major Concerns
-
Start by addressing the client’s major concerns
-
Provide explanations or alternatives for key decisions
Step 4: Document Client Feedback
-
Take detailed notes on the client’s feedback
-
Confirm that their concerns are clearly understood
Step 5: Prioritize Adjustments
-
Identify the most important adjustments based on the client’s feedback
-
Ensure the changes align with the project’s scope and budget
Step 6: Plan for Additional Adjustments
-
Discuss other changes or revisions that the client may want
-
Confirm that the adjustments are feasible
Step 7: Confirm Next Steps with Client
-
Summarize the agreed changes and confirm the next steps for updating the proposal
-
Set a revised timeline for delivery
Make adjustments to the proposal as needed
Step 1: Review Client Feedback
-
Collect all feedback from the client and relevant internal stakeholders
-
Prioritize key areas for adjustments
Step 2: Update Project Scope
-
Revise the project scope to incorporate requested changes
-
Ensure additional tasks or features are documented accurately
Step 3: Recalculate Costs
-
Reassess material and labor costs based on the revised scope
-
Update the proposal’s budget section with new estimates
Step 4: Revise Project Timeline
-
Modify the project timeline based on changes to the scope
-
Account for new dependencies or delays
Step 5: Review Adjusted Proposal with Team
-
Conduct an internal review meeting to discuss the revised proposal
-
Verify that the changes align with project goals
Step 6: Finalize Proposal Adjustments
-
Implement final adjustments based on internal and client feedback
-
Ensure all calculations are accurate
Step 7: Document the Adjusted Proposal
-
Record all changes and their rationale in the project management system
Refine project proposal based on client feedback
Step 1: Evaluate Client Feedback
-
Assess the feedback received during client discussions
-
Identify key areas where refinement is needed
Step 2: Make Revisions to Key Sections
-
Update key sections such as project scope budget and timeline based on the feedback
-
Ensure that changes are aligned with client expectations
Step 3: Recalculate Costs and Timeline
-
Recalculate the budget and timeline if changes impact project costs or duration
-
Highlight any major deviations from the original proposal
Step 4: Review the Refined Proposal with Stakeholders
-
Conduct an internal review with stakeholders to verify that all feedback has been addressed
-
Make final adjustments as needed
Step 5: Communicate Changes to the Client
-
Summarize the refinements made to the proposal in a follow-up meeting or email
-
Highlight key changes and their implications
Step 6: Confirm Client Satisfaction
-
Ask for final confirmation or approval from the client on the refined proposal
-
Address any last-minute concerns or questions
Step 7: Finalize and Save the Refined Proposal
-
Save the refined proposal in the project management system
-
Share the updated version with the client and internal team
Develop detailed project estimate, including cost breakdown and timeline
Step 1: Collect Detailed Cost Data
-
Gather detailed cost data for materials labor subcontractors and equipment
-
Verify prices and availability with suppliers
Step 2: Calculate Material and Labor Costs
-
Calculate the total cost of materials based on specifications and quantity
-
Determine labor costs accounting for required personnel and estimated hours
Step 3: Include Contingency Costs
-
Add a contingency percentage to the overall cost to cover potential unexpected issues
-
Document the assumptions used for the contingency amount
Step 4: Develop a Detailed Timeline
-
Break the project down into detailed tasks each with an estimated duration
-
Include key milestones and deadlines to track progress
Step 5: Cross-Check Estimate with Internal Team
-
Review the detailed estimate with relevant stakeholders for accuracy
-
Confirm that all key cost elements and timeline assumptions are reasonable
Step 6: Prepare Cost Breakdown Report
-
Create a detailed cost breakdown report showing costs by category and task
-
Use clear language and concise formatting for client understanding
Step 7: Share the Estimate with Client
-
Send the detailed estimate to the client along with a brief summary of key cost drivers and timeline
-
Invite the client to review and provide feedback
Create a comprehensive project timeline
Step 1: Review Project Scope and Requirements
-
Examine the project scope deliverables and GC requirements.
-
Ensure you have a clear understanding of all tasks and milestones.
Step 2: Identify Key Phases and Milestones
-
Break the project into key phases and milestones.
-
List all significant events deliverables and deadlines.
Step 3: Define Tasks and Dependencies
-
Detail all tasks required to complete each phase.
-
Identify dependencies between tasks and determine the sequence of activities.
Step 4: Estimate Task Durations
-
Estimate the time required to complete each task.
-
Use past project data and team input to ensure accuracy.
Step 5: Allocate Resources
-
Assign team members subcontractors and equipment to each task.
-
Ensure resources are available and properly allocated.
Step 6: Develop Timeline Draft
-
Create a draft timeline using project management software or tools.
-
Plot tasks durations and dependencies to visualize the project flow.
Step 7: Review and Adjust
-
Share the draft timeline with the project team for feedback.
-
Adjust the timeline based on input and resolve any scheduling conflicts.
Step 8: Incorporate Buffer Time
-
Add buffer time to account for potential delays or unforeseen issues.
-
Ensure the timeline remains realistic and achievable.
Step 9: Finalize the Timeline
-
Review the finalized timeline with key stakeholders.
-
Ensure all parties agree on the schedule and responsibilities.
Step 10: Document and Share
-
Document the comprehensive project timeline in a clear and accessible format.
-
Distribute the timeline to the GC and all relevant team members.
Compile all proposal documents, including scope of work, estimate, timeline, and terms and conditions
Step 1: Gather Key Proposal Documents
-
Collect all necessary documents including cost estimates project plans material lists and client correspondence
-
Ensure that each document is up-to-date and approved
Step 2: Organize Documents by Sections
-
Organize the proposal into clear sections such as project overview budget breakdown timeline and client-specific requirements
-
Label each section for easy navigation
Step 3: Review and Verify Cost Estimates
-
Cross-check cost estimates to ensure consistency with project requirements and client preferences
-
Confirm that all calculations are accurate
Step 4: Create a Table of Contents
-
Develop a table of contents to provide a quick overview of the proposal sections
-
Include page numbers and hyperlinks for digital documents
Step 5: Review Proposal for Completeness
-
Conduct a final review of the compiled proposal documents for accuracy and completeness
-
Verify that all necessary materials such as sample images or product brochures are included
Step 6: Obtain Internal Approval
-
Submit the compiled proposal to relevant stakeholders or supervisors for final approval
-
Address any additional comments or changes
Step 7: Save and Secure Proposal Documents
-
Save the proposal documents in a secure location such as a project management system or cloud storage
-
Ensure that only authorized personnel have access
Schedule follow-up meeting with client to present detailed proposal
Step 1: Propose Meeting Times
-
Contact the client to propose multiple date and time options for the follow-up meeting
-
Ensure that the proposed times align with your team’s availability
Step 2: Confirm Meeting Details
-
Confirm the meeting date time and location (or virtual link) with the client
-
Send a calendar invite and email confirmation with meeting details
Step 3: Prepare Presentation Materials
-
Prepare copies of the detailed proposal and any supporting documents
-
Create a brief presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Room or Virtual Meeting
-
If meeting in person ensure the meeting room is reserved and set up with necessary equipment
-
For virtual meetings test the video conferencing software in advance
Step 5: Assign Presentation Roles
-
Assign roles for the meeting such as who will present each section of the proposal and who will address specific questions
-
Brief your team on the client’s key concerns
Present detailed project proposal to client
Step 1: Start with Introductions
-
Introduce yourself and any other team members present at the meeting
-
Briefly restate the purpose of the meeting and outline the agenda
Step 2: Present Key Proposal Sections
-
Present key sections of the detailed proposal such as the project scope budget timeline and client-specific requirements
-
Use clear visuals or charts to aid understanding
Step 3: Explain Cost Estimates
-
Break down the cost estimates for each section of the proposal
-
Highlight any major cost items or unique pricing considerations
Step 4: Discuss Potential Adjustments
-
Open the floor for discussion on potential adjustments or additional client requests
-
Take detailed notes on the client’s feedback
Step 5: Address Client Questions
-
Allow the client to ask questions at the end of each section
-
Provide clear and concise answers to address their concerns
Step 6: Summarize Key Takeaways
-
Recap the main points of the proposal and any agreed-upon changes
-
Confirm the next steps and follow-up actions with the client
Negotiate contract terms, including scope of work, payment schedule, and any contingencies
Step 1: Review Proposal Terms Internally
-
Meet with your internal team to review the proposed contract terms including scope pricing and timeline
-
Identify key areas for negotiation flexibility
Step 2: Schedule Negotiation Meeting
-
Schedule a negotiation meeting with the client offering a range of date and time options
-
Confirm the meeting details and agenda with the client in advance
Step 3: Prepare Negotiation Strategy
-
Develop a negotiation strategy focusing on client priorities and potential compromises
-
Outline acceptable negotiation limits for each key term
Step 4: Start Negotiation with Key Terms
-
Begin the negotiation by reviewing key contract terms such as scope and pricing
-
Highlight any areas where changes are not feasible due to project constraints
Step 5: Discuss Client’s Counterproposals
-
Allow the client to present their counterproposals or requests for changes
-
Take notes on their feedback and document areas of agreement
Step 6: Reach Agreement on Contract Terms
-
Finalize the negotiation by confirming agreed changes to contract terms
-
Document the agreed terms and set a timeline for contract finalization
Step 7: Review Final Contract Internally
-
Conduct a final review of the revised contract with your internal team
-
Confirm that all agreed changes have been accurately incorporated
Address any final questions or concerns from the client
Step 1: Schedule a Final Review Meeting
-
Schedule a meeting or call with the client to review any remaining questions or concerns
-
Confirm the meeting details and agenda with the client
Step 2: Open the Discussion for Questions
-
Invite the client to express any final questions or concerns
Step 3: Provide Clear and Concise Answers
-
Address each question or concern individually
-
Use clear language and avoid technical jargon where possible
Step 4: Reiterate Key Project Details
-
Highlight key project details such as scope timeline and budget to reassure the client
Step 5: Document Client Concerns
-
Record the client’s final questions and any decisions made in your project management system
Step 6: Confirm Client’s Satisfaction
-
Confirm that the client feels satisfied and comfortable with moving forward
Finalize contract terms and prepare contract documents
Step 1: Review Agreed Contract Terms
-
Confirm that all previously agreed-upon contract terms including scope pricing and timeline are accurate
Step 2: Prepare Contract Documents
-
Draft the contract documents using a standardized template ensuring that all terms are included
Step 3: Include Relevant Attachments
-
Attach supporting documents like project plans payment schedules and any special conditions
Step 4: Conduct Internal Review of Contract
-
Hold an internal review meeting to verify that all contract terms and attachments are accurate
Step 5: Make Edits Based on Feedback
-
Make necessary edits to the contract documents based on feedback from the internal review
Step 6: Prepare Contract for Client Review
-
Send a finalized version of the contract to the client for their review before the signing meeting
Step 7: Verify Client’s Understanding
-
Follow up with the client to ensure they understand all terms
Review contract documents with client, ensuring all terms are clear
Step 1: Schedule Contract Review Meeting
-
Schedule a meeting with the client to review the contract documents
Step 2: Present the Contract in Sections
-
Review each section of the contract with the client focusing on key terms like scope pricing and timeline
-
Pause after each section to allow the client to ask questions
Step 3: Explain Key Contract Clauses
-
Clearly explain important clauses such as payment terms and warranty conditions
-
Use simple language to clarify any complex legal terms
Step 4: Address Client Questions
-
Allow the client to ask questions about any section of the contract
Step 5: Confirm Client Understanding
-
Ask the client to confirm that they understand and are comfortable with the contract terms
Step 6: Note Any Requested Changes
-
Take detailed notes on any requested changes for later updates to the contract
Obtain client signatures on contract documents
Step 1: Review Final Changes with Client
-
Review any final changes or adjustments made to the contract with the client
Step 2: Prepare Signature Pages
-
Prepare signature pages for the contract verifying all documents are included
Step 3: Obtain Client’s Digital or Physical Signature
-
Meet with the client to obtain their signature on all necessary pages
Step 4: Verify Signatures from Company Representatives
-
Verify that all designated company representatives have signed the contract
Step 5: Confirm Completion of Contract Signing
-
Confirm with the client that the signing process is complete
Step 6: Prepare Copies for All Parties
-
Prepare copies of the signed contract for both the client and the company’s records
Provide client with a copy of the signed contract
Step 1: Prepare Client Copy of Contract
-
Prepare a digital or printed copy of the fully signed contract for the client
Step 2: Review Client Copy for Accuracy
-
Review the client copy to confirm all signatures and terms are accurate
Step 3: Send Contract to Client
-
Send the signed contract to the client via their preferred method such as email or postal mail
Step 4: Confirm Client Receipt
-
Follow up with the client to confirm they have received the signed contract
Step 5: Address Any Final Client Concerns
-
Address any remaining questions the client may have about the signed contract
Record signed contract and update project status in CRM
Step 1: Scan and Upload Signed Contract
-
Scan the signed contract and save a digital copy in your CRM or project management system
Step 2: Update Project Status in CRM
-
Update the project status in your CRM to reflect that the contract has been signed
Step 3: Record Contract Details
-
Record key contract details such as contract number client contact and key dates
Step 4: Notify Team of Contract Completion
-
Notify relevant team members that the contract has been signed and recorded
Step 5: Archive Physical Copy of Contract
-
Archive a physical copy of the signed contract in a secure location
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.