Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for Roof Restoration & Coating roofing projects. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your Roof Restoration & Coating projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Review Project Timeline and Key Milestones
• Review the project timeline and key milestones with the project manager to confirm the ideal date and agenda for the project kickoff meeting
• Ensure that the meeting aligns with the client’s schedule and project requirements
Step 2: Propose Multiple Kickoff Meeting Dates to the Client
• Propose multiple kickoff meeting dates to the client, offering flexibility to accommodate their schedule
• Clearly communicate the proposed options and confirm the client’s preferred date and time
Step 3: Confirm the Kickoff Meeting Details with Key Team Members
• Confirm the kickoff meeting details with key team members, such as the project manager, sales representative, and key subcontractors
• Provide a clear agenda and list of topics to be discussed during the meeting
Step 4: Log the Kickoff Meeting in CRM
• Log the kickoff meeting in CRM, linking it to the client’s file and updating the project timeline to reflect the scheduled meeting
• Assign meeting tasks to the designated team members
Step 5: Communicate the Scheduled Kickoff Meeting to All Stakeholders
• Communicate the scheduled kickoff meeting to all stakeholders, including the client, project manager, and key subcontractors, to ensure everyone is prepared for the discussion
• Confirm that all relevant personnel are aware of the meeting date, time, and agenda
Step 6: Prepare a Confirmation Reminder for the Client
• Prepare a confirmation reminder for the client, scheduling it to be sent 24 hours before the meeting
• Use the CRM or automated tools to streamline the reminder process
Step 7: Document the Kickoff Meeting Scheduling Process in Project Records
• Document the kickoff meeting scheduling process in project records and CRM, linking it to the client’s file for reference during follow-up and service delivery
Hold project kickoff meeting
Step 1: Set Up the Meeting Space and Necessary Materials
• Set up the meeting space and necessary materials for the project kickoff meeting, ensuring that all documents, visual aids, and presentations are ready and accessible
• Verify that digital tools or equipment are functioning properly if using slides or online conferencing
Step 2: Welcome the Client and Team Members to the Meeting
• Welcome the client and team members to the meeting, setting a positive tone and briefly outlining the meeting agenda
• Confirm that everyone is comfortable with the agenda and make any necessary adjustments
Step 3: Review Key Contract Terms and Project Scope
• Review key contract terms and the project scope, focusing on the client’s objectives, expectations, and key tasks to be completed
• Highlight critical elements such as responsibilities, deliverables, and timelines
Step 4: Discuss the Project Timeline and Milestones in Detail
• Discuss the project timeline and milestones in detail, explaining key dates for material delivery, crew mobilization, inspections, and project completion
• Address any potential risks or challenges that may impact the timeline
Step 5: Introduce Key Team Members and Their Roles
• Introduce key team members and their roles, ensuring that the client understands each person’s responsibilities and point of contact for specific issues
• Reiterate your commitment to effective communication and collaboration throughout the project
Step 6: Address Any Client Questions or Concerns
• Address any client questions or concerns raised during the meeting, providing clear and concise answers to reassure them of the project’s success
• Take notes on key points for follow-up if necessary
Step 7: Document the Kickoff Meeting and Key Discussions in Project Records
• Document the kickoff meeting and key discussions in project records and CRM, linking them to the client’s file for reference during project execution and follow-up actions
Introduce client to project manager and key team members
Step 1: Identify Key Team Members for the Project
• Identify key team members for the project, such as the project manager, site supervisor, lead technician, and client liaison
• Ensure that each team member is fully briefed on the project scope, client expectations, and their specific responsibilities
Step 2: Schedule an Introduction Session with the Client
• Schedule an introduction session with the client to formally introduce them to the project manager and key team members
• Confirm the client’s availability and preferred method of introduction (in-person or virtual)
Step 3: Welcome the Client and Facilitate the Introductions
• Welcome the client and facilitate the introductions, briefly describing each team member’s role and area of expertise
• Encourage open communication and collaboration between the client and team members
Step 4: Explain Each Team Member’s Responsibilities and Point of Contact
• Explain each team member’s responsibilities and their point of contact for specific issues or questions
• Reiterate the importance of clear and direct communication to ensure project success
Step 5: Encourage the Client to Share Their Expectations with the Team
• Encourage the client to share their expectations with the team, such as their preferred communication methods, desired updates, or special requirements
• Take notes on the client’s feedback for reference during project execution
Step 6: Reinforce the Commitment to Client Satisfaction and Project Success
• Reinforce the team’s commitment to client satisfaction and project success, emphasizing your dedication to meeting the client’s needs and resolving any challenges promptly
• Reassure the client of the team’s readiness to execute the project according to plan
Step 7: Document the Introduction Session and Key Discussions in Project Records
• Document the introduction session and key discussions in project records and CRM, linking them to the client’s file for reference during follow-up meetings and project execution
Conduct detailed roof inspection and assessment
Step 1: Review Inspection Checklist and Client’s Project Scope
• Review the inspection checklist and client’s project scope to confirm key focus areas, such as structural integrity, existing material condition, and specific client concerns
• Ensure that the inspection team is aligned on the scope and objectives of the assessment
Step 2: Perform a Comprehensive Visual Inspection of the Roof
• Perform a comprehensive visual inspection of the roof, focusing on critical areas such as roof surface, penetrations, flashing, and drainage systems
• Look for signs of damage, wear and tear, and potential vulnerabilities that could impact the roof’s performance
Step 3: Use Specialized Tools to Identify Hidden Issues (if applicable)
• Use specialized tools to identify hidden issues, such as moisture meters for water intrusion or infrared cameras to detect heat loss
• Confirm that all findings are accurately documented with notes and photos
Step 4: Take Detailed Notes and Photos of All Findings
• Take detailed notes and photos of all findings, capturing key issues such as damaged materials, improperly installed flashing, or blocked drains
• Include measurements or sketches if necessary to clarify specific problem areas
Step 5: Discuss Key Findings with the Inspection Team
• Discuss key findings with the inspection team to verify that all critical elements have been thoroughly assessed and documented
• Confirm that all findings are aligned with the client’s expressed needs and project goals
Step 6: Compile an Inspection Report with Visual Evidence and Recommendations
• Compile an inspection report that includes visual evidence and recommendations based on the findings
• Organize the report in a clear format for easy review and follow-up actions
Step 7: Document the Inspection and Assessment in Project Records and CRM
• Document the inspection and assessment in project records and CRM, linking it to the client’s file for reference during proposal development and follow-up actions
Finalize project plans and specifications
Step 1: Review Initial Project Scope and Client Feedback
• Review the initial project scope and client feedback, focusing on key tasks, materials, and specifications that have been discussed and agreed upon
• Confirm that all relevant details are documented and up-to-date
Step 2: Consult with Key Team Members to Finalize Plans
• Consult with key team members, such as the project manager, lead technician, and estimator, to finalize project plans and specifications
• Ensure that all team members are aligned on the project’s objectives and requirements
Step 3: Verify that All Specifications Meet Industry Standards and Client Requirements
• Verify that all specifications meet industry standards and client requirements, considering factors such as safety regulations, material compatibility, and quality expectations
• Make any necessary adjustments to align with the client’s expressed goals
Step 4: Detail the Scope of Work and Material Requirements
• Detail the scope of work and material requirements, specifying each key task, required materials, and installation methods
• Include any special considerations or client preferences that need to be adhered to during the project
Step 5: Create a Finalized Version of the Project Plan Document
• Create a finalized version of the project plan document that includes detailed specifications, task descriptions, and material lists
• Organize the document into clear sections for easy reference during project execution
Step 6: Review the Finalized Project Plan with the Client (if applicable)
• Review the finalized project plan with the client, providing a summary of key elements and confirming that all expectations are clearly documented
• Address any remaining questions or concerns the client may have
Step 7: Save the Finalized Project Plan in Project Records and CRM
• Save the finalized project plan in project records and CRM, linking it to the client’s file for reference during project execution and quality control checks
Verify material pricing and lead times
Step 1: Review the Project’s Material Requirements
• Review the project’s material requirements, focusing on key items such as roofing materials, underlayment, flashing, and fasteners
• Confirm that all required materials are accurately listed and aligned with the project scope and specifications
Step 2: Contact Suppliers to Verify Current Pricing and Lead Times
• Contact suppliers to verify current pricing and lead times for the required materials, considering factors such as market availability, bulk discounts, and delivery schedules
• Confirm that all quoted prices are accurate and up-to-date
Step 3: Identify Potential Delays or Risks Related to Material Procurement
• Identify potential delays or risks related to material procurement, such as seasonal shortages, shipping constraints, or changes in supplier policies
• Develop contingency plans to address these risks if needed
Step 4: Update Material Pricing and Lead Times in Project Plans
• Update material pricing and lead times in the project plans, ensuring that all costs and delivery schedules are clearly documented and aligned with the project timeline
• Include buffer periods for materials with longer lead times to prevent delays
Step 5: Review and Confirm Final Pricing and Lead Times with Key Team Members
• Review and confirm final pricing and lead times with key team members, such as the project manager and estimator, to align everyone on the updated costs and schedules
• Make any necessary adjustments to the project budget or timeline based on this information
Step 6: Communicate Material Pricing and Lead Times to the Client (if applicable)
• Communicate material pricing and lead times to the client, providing updates on any changes that may impact the project’s cost or schedule
• Offer alternative options if certain materials are unavailable or subject to delays
Step 7: Document Verified Pricing and Lead Times in Project Records and CRM
• Document verified pricing and lead times in project records and CRM, linking them to the client’s file for reference during project tracking and procurement planning
Develop detailed project schedule
Step 1: Review Final Project Scope and Specifications
• Review the final project scope and specifications to identify key tasks and milestones that need to be included in the project schedule
• Confirm that all scope details are accurate and aligned with the client’s expectations
Step 2: Identify Critical Path Activities and Dependencies
• Identify critical path activities and dependencies, determining which tasks must be completed on schedule to avoid delays in subsequent phases
• Consider factors such as material lead times, subcontractor availability, and safety protocols
Step 3: Create a Detailed Timeline for Each Project Phase
• Create a detailed timeline for each project phase, specifying start and end dates, durations, and milestones for key tasks such as material delivery, crew mobilization, and inspections
• Use project management software or tools to visually organize the timeline for easy review and adjustments
Step 4: Include Buffer Periods for Potential Delays or Adjustments
• Include buffer periods in the timeline to account for potential delays or adjustments, such as unexpected weather changes, material shortages, or site access issues
• Reassess buffer periods based on recent experiences or project complexity
Step 5: Coordinate the Schedule with Key Team Members and Stakeholders
• Coordinate the schedule with key team members and stakeholders, such as subcontractors, suppliers, and client representatives
• Confirm that all parties are aligned on the schedule and their responsibilities
Step 6: Review and Finalize the Project Schedule with the Project Manager
• Review and finalize the project schedule with the project manager, ensuring that all activities, durations, and dependencies are clearly documented and achievable
• Make any necessary adjustments to optimize efficiency and manage risks
Step 7: Save the Finalized Project Schedule in Project Records and CRM
• Save the finalized project schedule in project records and CRM, linking it to the client’s file for reference during project tracking and follow-up meetings
Confirm client's final selections (materials, colors, etc.)
Step 1: Review Available Options and Client’s Preferences
• Review the available options for materials, colors, and finishes based on the client’s preferences and project requirements
• Confirm that all choices align with the project specifications and budget constraints
Step 2: Schedule a Meeting or Call to Confirm Selections with the Client
• Schedule a meeting or call to confirm selections with the client, providing visual samples or digital renderings if needed to help them make informed decisions
• Offer guidance on the pros and cons of each option to ensure the client feels confident in their choices
Step 3: Present the Finalized Options to the Client for Approval
• Present the finalized options to the client for approval, highlighting any key features, benefits, and potential trade-offs
• Confirm that the client is satisfied with their selections and prepared to move forward with the project
Step 4: Document the Client’s Final Selections in the Project Plan
• Document the client’s final selections in the project plan, including detailed descriptions, product codes, and supplier information for each chosen material or finish
• Confirm that all details are aligned with the agreed project scope and specifications
Step 5: Notify Key Team Members of the Client’s Final Selections
• Notify key team members, such as the project manager, procurement officer, and site supervisor, of the client’s final selections
• Confirm that all team members are aware of any special requirements or installation methods associated with the chosen materials
Step 6: Communicate Any Changes or Considerations to the Client (if applicable)
• Communicate any changes or special considerations related to the client’s selections, such as extended lead times, additional costs, or specific maintenance requirements
• Reconfirm the client’s understanding and agreement on any updates
Step 7: Save the Client’s Final Selections in Project Records and CRM
• Save the client’s final selections in project records and CRM, linking them to the client’s file for reference during project execution and quality control checks
Order materials and equipment
Step 1: Review the Finalized Project Plan and Material Requirements
• Review the finalized project plan and material requirements, confirming the quantities, specifications, and brands of all needed materials and equipment
• Verify that all material selections are aligned with the client’s approved choices and project specifications
Step 2: Contact Approved Suppliers to Place Orders
• Contact approved suppliers to place orders for all required materials and equipment, ensuring that all items are in stock and available for the scheduled delivery dates
• Negotiate any bulk pricing or discounts if applicable
Step 3: Confirm Delivery Schedules and Lead Times with Suppliers
• Confirm delivery schedules and lead times with suppliers, aligning them with the project timeline and key milestones
• Include buffer periods for critical materials with longer lead times to prevent delays
Step 4: Document Order Details and Delivery Schedules in Project Records
• Document order details and delivery schedules in project records and CRM, including purchase orders, supplier contact information, and estimated delivery dates
• Link all documentation to the client’s file for easy reference during project tracking
Step 5: Notify Key Team Members of Order Status and Delivery Dates
• Notify key team members, such as the project manager, site supervisor, and procurement officer, of order status and delivery dates
• Confirm that all personnel are aware of the scheduled deliveries and their responsibilities for receiving and inspecting materials
Step 6: Prepare a Follow-Up Plan for Monitoring Order Progress
• Prepare a follow-up plan for monitoring order progress with suppliers, scheduling regular check-ins to confirm that all orders are on track for delivery
• Address any potential delays or issues proactively
Step 7: Document Material Orders and Follow-Up Plan in Project Records
• Document material orders and follow-up plan in project records and CRM, linking them to the client’s file for reference during project execution and reporting
Verify subcontractor availability and schedules (if applicable)
Step 1: Review the Project Scope and Required Subcontractor Services
• Review the project scope and required subcontractor services, identifying key tasks that need to be outsourced, such as specialized installations or inspections
• Confirm that all subcontractor requirements align with the project’s timeline and budget
Step 2: Contact Approved Subcontractors to Confirm Availability
• Contact approved subcontractors to confirm their availability for the project’s key tasks, focusing on critical dates for mobilization, work completion, and inspections
• Verify that each subcontractor has the necessary capacity and resources to fulfill their responsibilities
Step 3: Review and Confirm Subcontractor Schedules with Key Team Members
• Review and confirm subcontractor schedules with key team members, such as the project manager and site supervisor, to ensure alignment with the overall project timeline
• Address any scheduling conflicts or dependencies promptly
Step 4: Document Subcontractor Availability and Schedules in Project Records
• Document subcontractor availability and schedules in project records and CRM, including key dates, contact information, and specific tasks assigned to each subcontractor
• Link all information to the client’s file for easy reference during project tracking
Step 5: Prepare a Backup Plan for Subcontractor Scheduling Conflicts
• Prepare a backup plan for subcontractor scheduling conflicts or delays, identifying alternative subcontractors or task adjustments if necessary
• Communicate the backup plan to key team members to ensure continuity in case of unexpected changes
Step 6: Notify Key Team Members of Confirmed Subcontractor Schedules
• Notify key team members, such as the project manager, site supervisor, and client liaison, of confirmed subcontractor schedules and any critical dependencies
• Confirm that all personnel are aware of their responsibilities for coordinating with subcontractors
Step 7: Document the Subcontractor Scheduling Process in Project Records
• Document the subcontractor scheduling process in project records and CRM, linking it to the client’s file for reference during project execution and follow-up meetings
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Review the Project Scope and Subcontractor Agreements
• Review the project scope and subcontractor agreements, focusing on key tasks, responsibilities, and terms that need to be included in the final subcontract documents
• Confirm that all details align with the project’s specifications and client’s expectations
Step 2: Consult with Key Team Members to Finalize Subcontract Terms
• Consult with key team members, such as the project manager, site supervisor, and legal advisor, to finalize subcontract terms and conditions
• Address any concerns or revisions raised by team members before preparing the final documents
Step 3: Prepare Subcontract Documents with Clear Terms and Responsibilities
• Prepare subcontract documents with clear terms and responsibilities, specifying the scope of work, deliverables, payment schedules, and safety protocols
• Include key clauses related to quality standards, liability, and dispute resolution
Step 4: Review the Draft Subcontract with Subcontractors for Feedback
• Review the draft subcontract with subcontractors to gather their feedback and confirm their agreement on key terms
• Address any revisions or concerns raised by subcontractors to ensure mutual understanding and alignment
Step 5: Prepare Both Digital and Physical Copies of the Finalized Subcontract
• Prepare both digital and physical copies of the finalized subcontract for the subcontractor’s convenience, verifying that all files are properly formatted and organized
• Confirm that physical copies are printed on official company letterhead if required
Step 6: Document Finalized Subcontract Terms and Copies in Project Records
• Document finalized subcontract terms and copies in project records and CRM, linking them to the client’s file for reference during project execution and tracking
Step 7: Notify Key Team Members of the Finalized Subcontract Terms
• Notify key team members, such as the project manager, site supervisor, and procurement officer, of the finalized subcontract terms and key responsibilities for managing the subcontractor’s work
Obtain client signatures on subcontract (if applicable)
Step 1: Prepare Signature-Ready Copies of the Subcontract
• Prepare signature-ready copies of the subcontract, ensuring that all necessary pages, attachments, and signature lines are properly formatted and organized
• Verify that the client and subcontractor have access to both digital and physical copies if applicable
Step 2: Schedule a Meeting or Call to Obtain Client and Subcontractor Signatures
• Schedule a meeting or call to obtain client and subcontractor signatures, confirming each party’s preferred method for signing (in-person, digital signature, or courier)
• Provide clear instructions on the signing process and any additional steps required
Step 3: Present the Subcontract for Signature and Witnessing
• Present the subcontract to the client and subcontractor for signature, explaining any specific requirements or witnessing procedures that must be followed
• Ensure that all parties involved in signing are present and aware of their responsibilities
Step 4: Verify that All Signatures Are Complete and Accurate
• Verify that all signatures are complete and accurate, confirming that all required fields have been signed and dated correctly
• Address any missing information or errors immediately to avoid delays
Step 5: Provide the Client and Subcontractor with Copies of the Signed Subcontract
• Provide the client and subcontractor with copies of the signed subcontract for their records, ensuring that they have both digital and physical copies if requested
• Confirm that both parties understand the next steps and project timeline
Step 6: Store Signed Copies of the Subcontract in Secure Project Records
• Store signed copies of the subcontract in secure project records and CRM, linking them to the client’s file for reference during project tracking and future audits
• Ensure that only authorized personnel have access to the signed subcontract documents
Step 7: Document the Signature Process and Subcontract Finalization in CRM
• Document the signature process and subcontract finalization in CRM, noting key details such as the date of signing and any special conditions agreed upon
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Prepare and Organize Copies of the Signed Subcontract for the Subcontractor
• Prepare both digital and physical copies of the signed subcontract for the subcontractor’s convenience, ensuring that all pages, attachments, and signature lines are clearly organized
• Verify that digital copies are properly formatted and secured for electronic distribution
Step 2: Send the Digital Copy of the Signed Subcontract to the Subcontractor
• Send the digital copy of the signed subcontract to the subcontractor via their preferred communication method, such as email or an online portal
• Include a brief message confirming the subcontractor’s receipt of the contract and outlining their next steps
Step 3: Deliver or Mail the Physical Copy of the Signed Subcontract
• Deliver or mail the physical copy of the signed subcontract to the subcontractor if requested, using a secure and reliable delivery method
• Confirm the delivery date and provide tracking information if applicable
Step 4: Follow Up to Confirm Receipt of the Signed Subcontract
• Follow up with the subcontractor to confirm receipt of the signed subcontract and to address any immediate questions they may have
• Reiterate key terms and responsibilities as needed
Step 5: Invite the Subcontractor to Reach Out for Any Further Clarifications
• Invite the subcontractor to reach out if they have additional questions or need further clarifications about the subcontract or project requirements
• Reassure the subcontractor of your ongoing support throughout the project
Step 6: Document Contract Delivery and Subcontractor Confirmation in CRM
• Document the delivery of the signed subcontract and the subcontractor’s confirmation in CRM, linking it to the project file for reference during future project updates and follow-up meetings
Step 7: Store the Signed Subcontract in Secure Project Records
• Store the signed subcontract in secure project records, ensuring that only authorized personnel have access to these critical documents
Review permitting requirements
Step 1: Identify Relevant Permits Based on Project Scope
• Identify all relevant permits required based on the project scope, location, and specific tasks such as roofing, structural modifications, or equipment installations
• Confirm that all permit requirements align with local building codes and regulations
Step 2: Consult with Local Authorities and Building Departments
• Consult with local authorities and building departments to verify permit requirements, fees, and processing times for each permit
• Confirm any additional documentation or inspections that may be needed for permit approval
Step 3: Review Previous Permits for Similar Projects (if applicable)
• Review previous permits obtained for similar projects to identify any recurring requirements or best practices
• Use past experience to anticipate potential challenges or additional steps in the permitting process
Step 4: Document Permit Requirements in Project Records
• Document all identified permit requirements in project records, including key details such as permit types, submission deadlines, and responsible authorities
• Link the documentation to the client’s file for easy reference during project planning and execution
Step 5: Prepare a Permit Checklist with Responsibilities and Deadlines
• Prepare a permit checklist with responsibilities and deadlines, assigning specific tasks to team members responsible for permit applications and follow-up
• Include key contacts for each permitting authority to facilitate communication
Step 6: Communicate Permitting Requirements to Key Team Members
• Communicate permitting requirements to key team members, such as the project manager, site supervisor, and client liaison, to ensure everyone is aware of their roles and responsibilities
Step 7: Save the Permitting Review in Project Records and CRM
• Save the permitting review in project records and CRM, linking it to the client’s file for reference during follow-up actions and compliance tracking
Procure necessary permits
Step 1: Prepare All Required Documentation for Permit Applications
• Prepare all required documentation for permit applications, including project plans, specifications, contractor licenses, and any supporting documents required by local authorities
• Verify that all forms are accurately completed and properly signed
Step 2: Submit Permit Applications to Relevant Authorities
• Submit permit applications to the relevant authorities, following the specified submission process for each permit type (e.g., online portal, in-person submission, or postal mail)
• Confirm that all required fees are paid and receipts are obtained
Step 3: Track Permit Application Progress with Authorities
• Track permit application progress with authorities, scheduling regular check-ins or follow-up calls to confirm that all applications are being processed on schedule
• Address any requests for additional information or revisions promptly
Step 4: Coordinate Required Inspections or Approvals for Permit Issuance
• Coordinate required inspections or approvals for permit issuance, scheduling site visits with inspectors as needed and ensuring that all inspection criteria are met
• Keep a record of all communications and inspection reports for future reference
Step 5: Communicate Permit Status to Key Team Members
• Communicate permit status to key team members, such as the project manager, site supervisor, and client liaison, to keep them informed of any updates or approvals
• Confirm that all personnel are aware of their responsibilities for complying with permit conditions
Step 6: Store Issued Permits in Secure Project Records
• Store issued permits in secure project records, ensuring that only authorized personnel have access to these critical documents
• Link all permit documentation to the client’s file for easy reference during project tracking and inspections
Step 7: Document the Permit Procurement Process in CRM
• Document the permit procurement process in CRM, noting key details such as permit types, submission dates, and approval timelines
Create site safety plan
Step 1: Conduct a Safety Risk Assessment for the Project Site
• Conduct a safety risk assessment for the project site, identifying potential hazards such as fall risks, electrical exposure, or heavy equipment operation
• Involve key team members and safety personnel in assessing and prioritizing risks
Step 2: Outline Safety Protocols and Procedures Based on the Assessment
• Outline safety protocols and procedures based on the risk assessment, detailing measures such as PPE requirements, fall protection, fire prevention, and first aid provisions
• Ensure that all protocols align with industry standards and local regulations
Step 3: Create a Site Safety Plan Document with Clear Guidelines
• Create a site safety plan document that includes clear guidelines for all identified risks, emergency procedures, and communication protocols
• Use diagrams or visual aids to illustrate key safety measures and equipment placements
Step 4: Assign Safety Responsibilities to Designated Team Members
• Assign safety responsibilities to designated team members, such as site supervisors, safety officers, and first-aid responders
• Confirm that each team member understands their role in maintaining site safety
Step 5: Establish Reporting and Inspection Procedures for Safety Compliance
• Establish reporting and inspection procedures for safety compliance, scheduling regular safety checks and creating a system for logging incidents or near-misses
• Outline the process for correcting safety violations or implementing new measures as needed
Step 6: Communicate the Site Safety Plan to All Team Members
• Communicate the site safety plan to all team members, holding a safety briefing to review key protocols and answer any questions
• Confirm that all personnel are aware of their responsibilities and the importance of adhering to safety measures
Step 7: Save the Site Safety Plan in Project Records and CRM
• Save the site safety plan in project records and CRM, linking it to the project file for reference during site inspections and compliance checks
Create fall protection plan
Step 1: Review Site Assessment Findings for Fall Hazards
• Review site assessment findings for fall hazards, identifying specific areas that require fall protection measures such as roof edges, open holes, and elevated work platforms
• Confirm that all identified hazards align with OSHA or relevant safety standards
Step 2: Outline Specific Fall Protection Measures and Equipment Requirements
• Outline specific fall protection measures and equipment requirements, detailing options such as guardrails, safety nets, personal fall arrest systems, and anchor points
• Include guidelines for selecting and inspecting fall protection equipment
Step 3: Create a Fall Protection Plan Document with Clear Instructions
• Create a fall protection plan document that includes clear instructions for setting up, using, and maintaining fall protection measures
• Use diagrams or visual aids to illustrate key elements such as anchor point placements and harness usage
Step 4: Assign Fall Protection Responsibilities to Designated Personnel
• Assign fall protection responsibilities to designated personnel, such as safety officers, site supervisors, and equipment inspectors
• Confirm that each team member understands their role in ensuring fall protection compliance
Step 5: Establish Inspection and Maintenance Procedures for Fall Protection Equipment
• Establish inspection and maintenance procedures for fall protection equipment, scheduling regular checks to verify that all equipment is in good condition and properly secured
• Create a system for logging inspections and addressing any identified issues
Step 6: Communicate the Fall Protection Plan to All Team Members
• Communicate the fall protection plan to all team members, holding a safety briefing to review key protocols and answer any questions
• Confirm that all personnel are aware of their responsibilities and the importance of adhering to fall protection measures
Step 7: Save the Fall Protection Plan in Project Records and CRM
• Save the fall protection plan in project records and CRM, linking it to the project file for reference during site inspections and safety compliance checks
Establish project communication plan
Step 1: Identify Key Stakeholders and Communication Requirements
• Identify key stakeholders for the project, including the client, project manager, site supervisor, subcontractors, and suppliers
• Determine the specific communication requirements for each stakeholder based on their role and responsibilities
Step 2: Outline Communication Channels and Reporting Structures
• Outline communication channels and reporting structures, specifying methods such as email updates, phone calls, meetings, and project management software
• Define who will be responsible for initiating and managing communications for each task or milestone
Step 3: Create a Communication Plan Document with Guidelines and Schedules
• Create a communication plan document that includes guidelines and schedules for key project communications, such as progress reports, site meetings, and client updates
• Use clear language to explain the purpose and frequency of each communication
Step 4: Assign Communication Responsibilities to Designated Team Members
• Assign communication responsibilities to designated team members, such as project managers, client liaisons, and site supervisors
• Confirm that each team member understands their role in maintaining effective communication throughout the project
Step 5: Establish Procedures for Addressing Issues or Delays
• Establish procedures for addressing issues or delays, outlining how team members should escalate problems, report risks, and communicate potential impacts to stakeholders
• Include protocols for resolving conflicts or misunderstandings promptly
Step 6: Communicate the Project Communication Plan to All Stakeholders
• Communicate the project communication plan to all stakeholders, holding a kickoff meeting or call to review key guidelines and answer any questions
• Confirm that all stakeholders are aware of the plan and their responsibilities
Step 7: Save the Project Communication Plan in Project Records and CRM
• Save the project communication plan in project records and CRM, linking it to the project file for reference during ongoing communications and project tracking
Prepare equipment for mobilization
Step 1: Review Equipment Requirements Based on Project Scope
• Review the equipment requirements based on the project scope, focusing on key tasks such as restoration, coating application, or structural repairs
• Confirm that all necessary tools, machinery, and safety equipment are identified and listed
Step 2: Inspect and Service All Equipment Prior to Mobilization
• Inspect and service all equipment prior to mobilization, checking for any signs of wear, damage, or maintenance needs
• Ensure that all safety features are functioning properly and address any issues immediately
Step 3: Prepare a Mobilization Checklist with Equipment and Logistics
• Prepare a mobilization checklist that includes all equipment, materials, and logistical details such as transport schedules and crew assignments
• Assign responsibilities for loading, transporting, and setting up equipment on-site
Step 4: Coordinate with Suppliers and Transport Teams for Timely Delivery
• Coordinate with suppliers and transport teams to ensure the timely delivery of materials and equipment to the project site
• Confirm delivery schedules and any special requirements such as secure storage or specialized transport vehicles
Step 5: Document Equipment Mobilization Plans in Project Records
• Document the equipment mobilization plans in project records and CRM, including key details such as transport logistics, personnel assignments, and safety precautions
• Link all information to the project file for easy reference during mobilization and setup
Step 6: Communicate Mobilization Details to Key Team Members
• Communicate mobilization details to key team members, such as the project manager, site supervisor, and logistics coordinator, to ensure everyone is aware of their responsibilities and timelines
Step 7: Monitor Equipment Mobilization Progress and Address Issues
• Monitor equipment mobilization progress, scheduling regular check-ins with team members to confirm that all equipment is on track for delivery and setup
• Address any issues or delays promptly to prevent disruptions to the project schedule
Prepare site for restoration/coating work
Step 1: Review Site Conditions and Identify Preparation Tasks
• Review current site conditions and identify necessary preparation tasks based on the project scope, such as clearing debris, removing obstructions, or cleaning surfaces
• Confirm that all preparation tasks align with safety standards and project requirements
Step 2: Set Up Safety Barriers and Signage Around Work Areas
• Set up safety barriers and signage around work areas to prevent unauthorized access and ensure that all personnel are aware of restricted zones
• Use clear and visible signage to communicate key safety information and warnings
Step 3: Inspect Roof Deck and Surrounding Areas for Structural Issues
• Inspect the roof deck and surrounding areas for any structural issues, such as weak spots, water damage, or potential hazards
• Document any identified issues and address them prior to starting restoration or coating work
Step 4: Coordinate with Team Members to Prepare Necessary Tools and Materials
• Coordinate with team members to prepare the necessary tools and materials for the restoration or coating work, ensuring that everything is readily accessible and organized
• Verify that all materials are in good condition and appropriate for the tasks ahead
Step 5: Confirm That All Permits and Safety Plans Are in Place
• Confirm that all required permits are in place and that the safety plan has been communicated to key personnel
• Review key safety measures and compliance requirements with the project manager and site supervisor
Step 6: Document Site Preparation Tasks and Inspections in Project Records
• Document site preparation tasks and inspections in project records, including key details such as safety measures, identified issues, and personnel responsibilities
• Link all information to the project file for reference during ongoing work and follow-up inspections
Step 7: Communicate Site Preparation Status to Key Team Members
• Communicate site preparation status to key team members, such as the project manager, site supervisor, and safety officer, to confirm that all preparation tasks have been completed and the site is ready for restoration or coating work
Conduct final pre-construction review meeting
Step 1: Prepare an Agenda and Key Documents for the Meeting
• Prepare an agenda and key documents for the final pre-construction review meeting, focusing on critical topics such as the project scope, schedule, safety plan, and communication protocols
• Confirm that all attendees have access to the necessary documents prior to the meeting
Step 2: Invite Key Stakeholders to the Review Meeting
• Invite key stakeholders to the review meeting, such as the project manager, site supervisor, safety officer, client representative, and subcontractor leads
• Confirm the meeting date, time, and venue with all attendees and send calendar invitations
Step 3: Review the Project Scope, Timeline, and Key Milestones
• Review the project scope, timeline, and key milestones during the meeting, highlighting critical tasks, dependencies, and deliverables
• Confirm that all stakeholders understand their roles and responsibilities for each phase of the project
Step 4: Discuss the Site Safety Plan and Key Protocols
• Discuss the site safety plan and key protocols, emphasizing critical safety measures such as PPE requirements, fall protection, and emergency procedures
• Confirm that all safety officers and team members are aligned on their responsibilities
Step 5: Address Any Questions or Concerns from Stakeholders
• Address any questions or concerns raised by stakeholders, providing clear and concise answers to ensure that all participants are confident in the project’s plans and execution strategy
• Take detailed notes on key points for follow-up actions
Step 6: Confirm Final Preparations and Next Steps
• Confirm final preparations and next steps, such as mobilizing crews, delivering materials, and setting up equipment on-site
• Reiterate key responsibilities and communication channels for ongoing project updates
Step 7: Document the Final Pre-Construction Review Meeting in Project Records
• Document the final pre-construction review meeting in project records and CRM, linking it to the project file for reference during project execution and tracking
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.