Closeout Workflow
Welcome to the Closeout Workflow SOP Template Library for Storm Damage Restoration (Commercial) roofing projects. Access free, expertly crafted Standard Operating Procedures for the closeout phase of your Storm Damage Restoration (Commercial) projects. Our templates cover final inspections, documentation, and client handover, ensuring a smooth and thorough project completion. Download our templates today to streamline your closeout process and leave a lasting positive impression.
Schedule final walkthrough with the client and project manager
Step 1: Review the Project Timeline and Identify a Suitable Walkthrough Date
• Review the project timeline and identify a suitable date for the final walkthrough based on the client’s availability and the project’s closeout schedule
• Confirm that all final tasks are completed or scheduled to be completed before the walkthrough
Step 2: Propose Multiple Walkthrough Dates and Times to the Client
• Propose multiple walkthrough dates and times to the client, offering flexibility to accommodate their schedule
• Clearly communicate the proposed options and confirm the client’s preferred date and time
Step 3: Confirm Walkthrough Details with the Client and Project Manager
• Once the client selects a preferred date and time, confirm the walkthrough details with all participants, including the project manager and any necessary team members
• Send a calendar invitation that includes the walkthrough date, time, meeting location, and a brief agenda
Step 4: Prepare a Final Walkthrough Checklist and Key Discussion Points
• Prepare a final walkthrough checklist and key discussion points, highlighting areas such as completed tasks, client expectations, warranties, and project documentation
• Share the checklist with the project manager in advance to ensure alignment
Step 5: Send a Walkthrough Reminder to the Client and Project Team
• Send a walkthrough reminder to the client and project team members one day before the scheduled walkthrough
• Include any relevant documents or materials that participants should review beforehand
Step 6: Confirm that All Project Documentation is Complete and Accessible
• Confirm that all project documentation, such as warranties, manuals, and compliance certificates, is complete and accessible for the final walkthrough
• Organize documents in a way that allows for easy review and handover
Step 7: Document Walkthrough Scheduling and Agenda in Project Records
• Document the walkthrough scheduling and agenda in project records and CRM, linking it to the client’s file for easy reference during and after the final review
Conduct final inspection to ensure all roofing work is completed to satisfaction
Step 1: Review the Final Inspection Checklist with Key Team Members
• Review the final inspection checklist with key team members, confirming the specific areas and tasks to be inspected based on project specifications and client requirements
• Ensure that all team members are aligned on the inspection objectives and responsibilities
Step 2: Conduct a Detailed Inspection of the Roof and Key Components
• Conduct a detailed inspection of the roof and key components, focusing on critical areas such as flashing, roof penetrations, material alignment, and drainage
• Use the checklist to systematically verify each item and document the findings
Step 3: Verify Compliance with Project Specifications and Client Expectations
• Verify that all completed roofing work complies with project specifications, manufacturer guidelines, and the client’s expectations
• Confirm that key elements such as materials, colors, and finishes align with the approved plans
Step 4: Check for Potential Issues or Inconsistencies
• Check for potential issues or inconsistencies, such as loose or misaligned materials, incomplete sealing, or visible defects
• Take detailed notes and photos to document any areas that require final adjustments
Step 5: Discuss Inspection Findings with Key Team Members
• Discuss the inspection findings with key team members, highlighting any remaining tasks or corrective actions needed to achieve client satisfaction
• Assign responsibilities and set deadlines for completing these tasks promptly
Step 6: Reinspect Corrected Items to Confirm Completion
• Reinspect corrected items to confirm that all adjustments meet quality standards and client expectations
• Update the inspection checklist with final results and resolved issues
Step 7: Document the Final Inspection Results in Project Records
• Document the final inspection results in project records and CRM, linking them to the client’s file for reference during client handover and project closeout
Address any last-minute concerns or issues raised by the client
Step 1: Invite the Client to Express Any Last-Minute Concerns
• Invite the client to express any last-minute concerns or issues they may have regarding the completed roofing work or remaining tasks
• Create an open and supportive environment for the client to share their feedback
Step 2: Listen Actively and Take Detailed Notes on Key Points
• Listen actively to the client’s concerns, taking detailed notes on each point raised
• Confirm your understanding of each issue before providing a response or solution
Step 3: Provide Clear and Concise Answers to Client Questions
• Provide clear and concise answers to the client’s questions, focusing on providing accurate information and realistic solutions
• If necessary, offer supporting materials or examples to clarify your response
Step 4: Develop an Action Plan to Address Remaining Issues
• Develop an action plan to address remaining issues, including specific tasks, responsibilities, and deadlines for each item
• Communicate the plan to both the client and key team members to ensure alignment
Step 5: Reassure the Client of Your Commitment to Quality and Satisfaction
• Reassure the client of your commitment to quality and satisfaction, emphasizing your willingness to go the extra mile to resolve any issues promptly
• Reinforce the importance of open communication throughout the project
Step 6: Follow Up with the Client to Confirm Resolution of Concerns
• Follow up with the client after addressing their concerns to confirm that they are satisfied with the final results
• Take notes on the client’s feedback and make any final adjustments if needed
Step 7: Document Client Concerns and Resolutions in Project Records
• Document the client’s concerns and resolutions in project records and CRM, linking them to the client’s file for reference during final handover and post-project support
Complete all remaining documentation and paperwork for roofing work
Step 1: Review All Project Documentation for Completeness and Accuracy
• Review all project documentation for completeness and accuracy, including contracts, inspection reports, warranties, compliance certificates, and change orders
• Confirm that all documents are properly labeled and organized for easy reference
Step 2: Prepare a Final Documentation Package for the Client
• Prepare a final documentation package for the client, including key documents such as the signed contract, final inspection reports, warranty information, and maintenance guides
• Organize the package in a logical order and use clear labeling for each section
Step 3: Verify that All Documentation Aligns with Project Records
• Verify that all documentation aligns with project records and CRM entries, ensuring that there are no discrepancies or missing information
• Address any gaps or errors promptly to maintain accuracy
Step 4: Include Final Sign-Offs and Compliance Certificates in the Package
• Include final sign-offs and compliance certificates in the package, such as approvals from relevant authorities, safety inspections, and quality control checks
• Confirm that all required signatures and approvals are obtained
Step 5: Prepare Digital Copies of Key Documents for Easy Access
• Prepare digital copies of key documents for easy access and backup, ensuring that all files are securely stored and linked to the client’s CRM record
• Provide the client with access to digital copies if requested
Step 6: Conduct a Final Review of the Documentation Package with Key Team Members
• Conduct a final review of the documentation package with key team members, confirming that all necessary documents are included and accurate
• Make any final adjustments based on team feedback
Step 7: Document Completion of Project Paperwork in Project Records
• Document the completion of project paperwork in project records and CRM, linking it to the client’s file for reference during final handover and post-project support
Ensure all warranties and manuals related to roofing are compiled and provided to the client
Step 1: Gather All Warranty Documents and Product Manuals
• Gather all warranty documents and product manuals related to the roofing work, including manufacturer warranties, installation guides, and maintenance instructions
• Verify that all documents are complete, accurate, and relevant to the installed products
Step 2: Organize Warranties and Manuals in a Client-Friendly Format
• Organize warranties and manuals in a client-friendly format, using clear labels and sections for easy navigation
• Consider creating a table of contents or index to help the client find key information quickly
Step 3: Verify Warranty Terms and Coverage Details
• Verify the warranty terms and coverage details for each product, including the duration, coverage limits, and conditions for maintaining warranty validity
• Confirm that all warranty information is up-to-date and aligns with manufacturer guidelines
Step 4: Prepare a Summary of Warranty and Maintenance Requirements
• Prepare a summary of warranty and maintenance requirements for the client, highlighting key responsibilities such as regular inspections, cleaning, and minor repairs
• Use simple language to ensure that the summary is accessible and easy to understand
Step 5: Review the Warranty and Maintenance Package with the Client
• Review the warranty and maintenance package with the client, explaining key sections such as coverage limits, claim procedures, and routine maintenance tasks
• Invite the client to ask questions or seek clarification during the review
Step 6: Provide Both Physical and Digital Copies of Warranties and Manuals
• Provide the client with both physical and digital copies of warranties and manuals, ensuring that all files are securely stored and easily accessible
• Confirm that the client is comfortable with accessing and storing the provided documents
Step 7: Document Delivery of Warranty and Maintenance Information in Project Records
• Document the delivery of warranty and maintenance information in project records and CRM, linking it to the client’s file for reference during post-project support
Obtain final approvals and sign-offs from relevant authorities for roofing work
Step 1: Identify All Required Final Approvals and Sign-Offs
• Identify all required final approvals and sign-offs from relevant authorities based on the project scope and local regulations
• Confirm specific requirements such as safety inspections, quality control checks, and compliance certificates
Step 2: Schedule Final Inspections with Relevant Authorities
• Schedule final inspections with relevant authorities, confirming the date, time, and inspection objectives in advance
• Ensure that all necessary team members are available to assist with the inspections
Step 3: Prepare Documentation and Evidence for Final Inspections
• Prepare all necessary documentation and evidence for the final inspections, such as progress reports, inspection checklists, and compliance certificates
• Organize documents in a clear and concise manner to facilitate a smooth review process
Step 4: Guide Inspectors Through the Completed Work and Key Compliance Areas
• Guide inspectors through the completed work and key compliance areas, providing clear explanations and visual references as needed
• Address any questions or concerns raised by the inspectors during the review
Step 5: Obtain Written Approvals and Sign-Offs from Relevant Authorities
• Obtain written approvals and sign-offs from relevant authorities, confirming that the roofing work meets all regulatory and safety standards
• Keep copies of all signed documents for the project records
Step 6: Communicate Final Approvals and Sign-Offs to the Project Team
• Communicate the final approvals and sign-offs to the project team, confirming that all regulatory requirements and compliance checks have been completed
• Highlight any final steps needed to achieve full project closeout
Step 7: Document Final Approvals and Sign-Offs in Project Records
• Document the final approvals and sign-offs in project records and CRM, linking them to the client’s file for reference during audits and post-project support
Coordinate with the insurance adjuster for final inspection and approval
Step 1: Contact the Insurance Adjuster to Schedule the Final Inspection
• Contact the insurance adjuster to schedule the final inspection, confirming the date, time, and scope of the inspection
• Ensure that the adjuster has access to all necessary areas and documents for the inspection
Step 2: Prepare Documentation and Evidence for Final Approval
• Prepare all necessary documentation and evidence for the final approval, including completed punch list items, before-and-after photos, and quality control reports
• Organize documents to facilitate a smooth review process with the adjuster
Step 3: Guide the Adjuster Through the Final Inspection
• Guide the adjuster through the final inspection, explaining the completed work and highlighting key areas of interest or concern
• Provide clear explanations and visual references to support the approval process
Step 4: Address Any Remaining Questions or Concerns Raised by the Adjuster
• Address any remaining questions or concerns raised by the adjuster, providing additional documentation or clarifications as needed
• Confirm that all issues have been resolved to the adjuster’s satisfaction
Step 5: Obtain Written Approval or Sign-Off from the Adjuster
• Obtain written approval or sign-off from the adjuster, confirming that the completed work meets the insurance requirements and standards
• Keep a copy of the signed document for project records
Step 6: Communicate the Adjuster’s Final Approval to the Project Team and Client
• Communicate the adjuster’s final approval to the project team and the client, confirming that all insurance-related tasks have been successfully completed
• Highlight any remaining administrative tasks or follow-up actions
Step 7: Document the Final Inspection and Adjuster’s Approval in Project Records
• Document the final inspection and adjuster’s approval in project records and CRM, linking them to the client’s file for reference during project closeout and post-project support
Submit final documentation and photos to the insurance company
Step 1: Compile All Required Documentation and Photos for Submission
• Compile all required documentation and photos for submission to the insurance company, including final inspection reports, progress updates, before-and-after photos, and any signed approvals
• Verify that all documents are complete, accurate, and organized
Step 2: Prepare a Submission Package for the Insurance Company
• Prepare a submission package for the insurance company, organizing all documents into clear sections such as damage assessments, repair logs, and compliance certificates
• Include a cover letter summarizing key details and outcomes of the project
Step 3: Submit the Documentation Package to the Insurance Company
• Submit the documentation package to the insurance company following the specified submission process, such as email, postal mail, or a secure online portal
• Confirm that all documents are delivered securely and that no critical information is missing
Step 4: Follow Up with the Insurance Company to Confirm Receipt
• Follow up with the insurance company to confirm receipt of the documentation package and address any immediate questions or concerns they may have
• Obtain a confirmation of receipt and keep it for the project records
Step 5: Address Any Feedback or Requests from the Insurance Company
• Address any feedback or requests from the insurance company promptly, providing additional documentation or clarifications if necessary
• Confirm that all requests are fulfilled to the insurance company’s satisfaction
Step 6: Communicate Submission Status to the Client and Project Team
• Communicate the submission status to the client and project team, highlighting any feedback or additional steps needed to complete the insurance claims process
• Reiterate the project’s successful completion and readiness for closeout
Step 7: Document the Submission of Final Documentation in Project Records
• Document the submission of final documentation in project records and CRM, linking it to the client’s file for reference during audits and post-project support
Remove all roofing equipment and clean up the site
Step 1: Gather Roofing Equipment and Tools for Removal
• Gather all roofing equipment and tools for removal, confirming that nothing is left behind on-site that could pose a safety hazard or cause delays in final site cleanup
• Inspect each piece of equipment to confirm that it is in good working condition and ready for transport
Step 2: Coordinate Equipment Transport and Loading Procedures
• Coordinate equipment transport and loading procedures with key team members, ensuring that all items are securely packed and safely loaded onto transport vehicles
• Confirm that transport schedules align with the project’s final timeline
Step 3: Inspect the Site for Debris and Leftover Materials
• Inspect the site for debris and leftover materials, including small items such as nails, shingle fragments, and packaging
• Use proper safety measures to handle and dispose of sharp or hazardous materials
Step 4: Dispose of Waste and Recyclable Materials Properly
• Dispose of waste and recyclable materials according to project guidelines and local environmental regulations
• Separate recyclable items such as metal scraps or packaging for proper disposal or recycling
Step 5: Conduct a Final Site Walkthrough to Confirm Cleanup Completion
• Conduct a final site walkthrough to confirm that all roofing equipment has been removed and that the site is clean and free of obstructions
• Address any remaining issues or areas that need further attention
Step 6: Notify Key Team Members of Site Cleanup Completion
• Notify key team members, such as the project manager and site supervisor, of the site cleanup completion to confirm readiness for final inspections or client handover
Step 7: Document Equipment Removal and Site Cleanup in Project Records
• Document the removal of roofing equipment and site cleanup in project records and CRM, linking it to the project file for reference during project closeout and final reviews
Perform a final safety check and remove all safety equipment
Step 1: Conduct a Comprehensive Safety Check of the Site
• Conduct a comprehensive safety check of the site to identify and address any remaining hazards, such as exposed nails, unsecured ladders, or slippery surfaces
• Confirm that all safety measures are still in place and effective
Step 2: Inspect and Remove Temporary Safety Barriers and Signs
• Inspect and remove temporary safety barriers and signs that were used during the project, ensuring that they are collected and stored properly for future use
• Confirm that all warning signs and barricades are no longer needed
Step 3: Remove Fall Protection Systems and Secure Ladders
• Remove fall protection systems such as harnesses, guardrails, and safety nets, confirming that they are in good condition and properly stored for future projects
• Secure and remove ladders or scaffolding in accordance with safety guidelines
Step 4: Perform a Final Check of Site Access Points and Emergency Exits
• Perform a final check of site access points and emergency exits to confirm that all paths are clear and accessible
• Remove any temporary obstructions that could impede safe access or egress
Step 5: Verify Compliance with Safety Standards and Regulations
• Verify that all safety standards and regulations have been met, ensuring that the site is fully compliant with local laws and industry requirements
• Document the safety check findings and address any remaining issues promptly
Step 6: Communicate Safety Check Completion to Key Team Members
• Communicate the safety check completion to key team members, such as the project manager and site supervisor, to confirm that all safety measures have been successfully removed and verified
Step 7: Document Final Safety Check and Equipment Removal in Project Records
• Document the final safety check and safety equipment removal in project records and CRM, linking it to the project file for reference during audits and post-project reviews
Conduct a project debrief with the roofing team to review successes and areas for improvement
Step 1: Schedule a Debrief Meeting with the Roofing Team
• Schedule a debrief meeting with the roofing team to review the completed project, focusing on successes, challenges, and lessons learned
• Confirm the meeting date, time, and location with all team members
Step 2: Prepare a Debrief Agenda and Key Discussion Points
• Prepare a debrief agenda and key discussion points, such as project milestones, quality control issues, safety incidents, and client feedback
• Distribute the agenda to team members in advance to encourage preparation and participation
Step 3: Discuss Key Successes and Best Practices During the Project
• Discuss key successes and best practices during the project, highlighting specific actions, techniques, or decisions that contributed to positive outcomes
• Recognize and celebrate team achievements to reinforce a culture of continuous improvement
Step 4: Identify Challenges and Areas for Improvement
• Identify challenges and areas for improvement, such as delays, safety incidents, material issues, or coordination problems
• Encourage open and constructive feedback from all team members to gain valuable insights
Step 5: Develop Actionable Recommendations for Future Projects
• Develop actionable recommendations for future projects based on the team’s feedback, focusing on strategies to enhance efficiency, quality, and safety
• Assign responsibilities for implementing specific improvements or follow-up actions
Step 6: Document Key Takeaways and Lessons Learned in Project Records
• Document key takeaways and lessons learned in project records and CRM, linking them to the project file for future reference and training purposes
• Share relevant insights with other teams or departments to promote knowledge sharing
Step 7: Thank the Team for Their Efforts and Reinforce Team Cohesion
• Thank the team for their efforts and dedication throughout the project, reinforcing the importance of teamwork and commitment to excellence
• Encourage ongoing communication and collaboration for future projects
Archive all project documents and records related to roofing work
Step 1: Collect All Relevant Project Documents and Records
• Collect all relevant project documents and records related to the roofing work, including contracts, inspection reports, quality control checklists, warranty documents, and communication logs
• Ensure that all documents are complete, accurate, and properly labeled
Step 2: Organize Documents into a Logical Folder Structure
• Organize documents into a logical folder structure, grouping them by categories such as project planning, execution, quality control, client communications, and financials
• Use clear and consistent naming conventions to facilitate easy retrieval
Step 3: Prepare Digital and Physical Copies of Key Documents
• Prepare digital and physical copies of key documents as required, ensuring that both formats are secure and accessible
• Verify that digital copies are properly backed up in a secure storage location
Step 4: Archive Documents in the Company’s Document Management System
• Archive documents in the company’s document management system (DMS) or CRM, linking them to the client’s file and tagging them with relevant metadata
• Confirm that all documents are properly indexed and searchable
Step 5: Dispose of or Store Physical Documents According to Company Policy
• Dispose of or store physical documents according to company policy and regulatory requirements, considering factors such as retention periods and confidentiality
• Confirm that all documents are securely stored to prevent unauthorized access
Step 6: Review Archived Records for Accuracy and Completeness
• Review archived records for accuracy and completeness, verifying that all key project milestones and decisions are properly documented
• Address any discrepancies or missing information promptly
Step 7: Document the Archiving Process and Closeout in Project Records
• Document the archiving process and project closeout in the DMS or CRM, linking it to the client’s file for future reference during audits or post-project support
Ensure all financials are settled and final invoices for roofing work are sent to the client and insurance company
Step 1: Review Project Financial Records with Accounting Team
• Review the project financial records with the accounting team to confirm all expenses, payments, and outstanding invoices
• Ensure that all financial entries are accurate and up-to-date
Step 2: Verify Outstanding Balances and Payment Schedules
• Verify any outstanding balances and payment schedules, ensuring that all subcontractors, suppliers, and crew members have been paid according to the project terms
Step 3: Reconcile Final Project Expenses and Adjustments
• Reconcile all final project expenses, including any adjustments for change orders, material substitutions, or additional labor
• Confirm that all adjustments are reflected in the financial records
Step 4: Prepare Final Invoices for Client and Insurance Company
• Prepare final invoices for the client and insurance company, detailing all completed work, materials used, and any additional charges
• Include a clear breakdown of costs
Step 5: Review and Approve Final Invoices with Project Manager
• Review the final invoices with the project manager, confirming that all charges and descriptions align with the completed work
• Obtain the project manager’s approval before submission
Step 6: Send Final Invoices to Client and Insurance Company
• Send the final invoices to the client and insurance company, following the specified submission process (e.g., email, postal service, or portal)
• Confirm receipt of invoices by both parties
Step 7: Document Financial Settlement and Invoice Submission in CRM
• Document the financial settlement and final invoice submission in the CRM, noting the date, amount, and recipient confirmation
• Update the project status to reflect financial completion
Prepare and submit final invoice and closeout documents to the client and insurance company
Step 1: Compile All Closeout Documents for Client and Insurance Company
• Compile all closeout documents required for the client and insurance company, including final inspection reports, warranty information, completion certificates, and photos
Step 2: Review Closeout Documents with Project Manager
• Review the closeout documents with the project manager, confirming that all necessary items are included and formatted correctly
• Make any adjustments or additions as needed
Step 3: Prepare Final Invoice Package for Submission
• Prepare the final invoice package for submission, including the final invoice, cover letter, and closeout documents
• Ensure that all documents are clearly labeled and organized
Step 4: Send Final Invoice and Closeout Documents to Client and Insurance Company
• Send the final invoice and closeout documents to the client and insurance company, following the specified submission process (e.g., email, postal service, or portal)
• Obtain confirmation of receipt from both parties
Step 5: Communicate Final Submission Status to Client and Project Team
• Communicate the status of the final submission to the client and project team, confirming that all documents have been sent and acknowledged
• Address any remaining client or insurance company questions
Step 6: Update Project Status to “Closed” in CRM
• Update the project status to “Closed” in the CRM, noting the final submission date and completion of all project requirements
• Notify all relevant team members of the project closure
Step 7: Document Final Submission in Project Records
• Document the final submission of invoices and closeout documents in the project records, including dates, confirmation receipts, and any final client communications
• Confirm that all records are accurate and complete
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!