Construction Workflow
Welcome to the Construction Workflow SOP Template Library for Storm Damage Restoration (Commercial) roofing projects. Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final installation, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Confirm Roofing Crew Availability and Assign Roles
• Confirm the availability of the roofing crew members and assign specific roles and responsibilities based on the project plan and requirements
• Ensure that each crew member understands their assigned tasks and has access to the necessary tools and equipment
Step 2: Transport Roofing Equipment and Materials to the Site
• Transport roofing equipment and materials to the site, following the established mobilization plan and transport schedules
• Verify that all transported items are secured and safely unloaded upon arrival
Step 3: Set Up Equipment and Material Staging Areas
• Set up equipment and material staging areas according to the site plan, ensuring that all items are organized, labeled, and easily accessible for the crew
• Confirm that all safety measures are in place for handling and storing materials
Step 4: Conduct an On-Site Safety Briefing with the Roofing Crew
• Conduct an on-site safety briefing with the roofing crew, reviewing key safety protocols, PPE requirements, and emergency procedures
• Emphasize the importance of fall protection and compliance with the site safety plan
Step 5: Inspect Equipment for Proper Functionality and Safety Compliance
• Inspect all equipment for proper functionality and safety compliance, verifying that safety features and emergency systems are operational
• Address any identified issues immediately to prevent accidents or delays
Step 6: Review the Daily Work Plan and Assign Tasks to Crew Members
• Review the daily work plan and assign tasks to crew members based on their roles and skill levels
• Confirm that all crew members understand the day’s objectives and task priorities
Step 7: Document the Mobilization and Safety Activities in Project Records
• Document all mobilization and safety activities in project records and CRM, linking them to the project file for reference during inspections and progress monitoring
Conduct site safety briefing with roofing crew
Step 1: Gather Roofing Crew for a Safety Briefing at the Start of the Day
• Gather the roofing crew at a designated meeting point on-site at the start of the day to conduct a safety briefing
• Ensure that all crew members are present and attentive for the briefing
Step 2: Review Key Safety Protocols and PPE Requirements
• Review key safety protocols with the crew, such as fall protection measures, proper use of harnesses, and ladder safety
• Emphasize the importance of using the required Personal Protective Equipment (PPE), such as hard hats, safety glasses, and gloves
Step 3: Discuss Specific Hazards and Risk Areas for the Day’s Tasks
• Discuss specific hazards and risk areas for the day’s tasks, such as roof edges, slippery surfaces, or high wind conditions
• Highlight any new or ongoing safety concerns identified during previous inspections or meetings
Step 4: Outline Emergency Procedures and Designate First Aid Contacts
• Outline emergency procedures, such as what to do in the event of a fall, injury, or equipment malfunction
• Designate first aid contacts and provide information on the location of first aid supplies and emergency exits
Step 5: Remind Crew Members to Report Unsafe Conditions Immediately
• Remind crew members to report any unsafe conditions or hazards immediately to the site supervisor or safety officer
• Reinforce the company’s commitment to maintaining a safe working environment
Step 6: Conduct a Brief Q&A to Address Crew Questions or Concerns
• Conduct a brief Q&A session to address any questions or concerns the crew members may have about safety protocols or tasks
• Clarify any points of confusion and confirm that all crew members understand the briefing
Step 7: Document the Safety Briefing in Project Records and CRM
• Document the safety briefing in project records and CRM, noting key topics covered, identified hazards, and crew attendance for compliance purposes
Coordinate with any subcontractors on site (if applicable)
Step 1: Identify and Confirm Subcontractor Roles and Tasks
• Identify the subcontractors present on-site and confirm their roles and tasks for the day based on the project plan and scope
• Ensure that each subcontractor understands their responsibilities and coordination requirements
Step 2: Establish Communication Channels and Points of Contact
• Establish clear communication channels and points of contact between the roofing crew, project manager, and subcontractors
• Confirm preferred methods of communication (e.g., radios, phones) for immediate coordination
Step 3: Review Daily Schedule and Task Dependencies
• Review the daily schedule and task dependencies with subcontractors to align their activities with the roofing crew’s tasks
• Address any potential conflicts or timing issues that could impact work efficiency or safety
Step 4: Coordinate Site Access and Work Zones with Subcontractors
• Coordinate site access and work zones with subcontractors to ensure that all parties can perform their tasks without interference or safety risks
• Mark or barricade restricted areas as needed to prevent unauthorized access
Step 5: Monitor Subcontractor Activities for Compliance with Safety Protocols
• Monitor subcontractor activities to confirm that they are complying with safety protocols and site regulations
• Address any safety concerns or procedural issues immediately with the subcontractor leads
Step 6: Hold Brief Check-Ins Throughout the Day to Align Progress
• Hold brief check-ins throughout the day to align progress and resolve any issues that arise between the roofing crew and subcontractors
• Use these check-ins to confirm task completion and adjust plans as needed
Step 7: Document Coordination Activities and Any Issues in Project Records
• Document all coordination activities and any issues that arise in project records and CRM, noting any corrective actions taken or adjustments made
Verify delivery and inventory of roofing materials
Step 1: Review Delivery Schedule and Expected Material Quantities
• Review the delivery schedule and expected material quantities based on supplier orders and project requirements
• Confirm that all necessary materials are scheduled for delivery in alignment with the project timeline
Step 2: Inspect Delivered Materials for Quality and Completeness
• Inspect all delivered materials for quality and completeness upon arrival, checking for damage, defects, or missing items
• Compare delivered items against the packing list and supplier documentation to confirm accuracy
Step 3: Count and Document the Quantity of Each Delivered Item
• Count and document the quantity of each delivered item to ensure that all materials match the order specifications and project requirements
• Use an inventory checklist to track delivered items and verify compliance with the material order
Step 4: Store Materials in Designated Staging Areas
• Store materials in designated staging areas on-site, organizing them according to type, size, and usage priority
• Implement proper handling and storage protocols to prevent damage or safety hazards
Step 5: Communicate Any Discrepancies or Issues to the Supplier Immediately
• Communicate any discrepancies or issues with the delivery to the supplier immediately, providing detailed information and photos as necessary
• Coordinate with the supplier to resolve issues and schedule replacement deliveries if needed
Step 6: Notify Key Team Members of Delivered and Verified Materials
• Notify key team members, such as the project manager and site supervisor, of the delivered and verified materials to confirm readiness for upcoming tasks
• Provide an updated inventory list for easy reference during installation
Step 7: Document the Delivery and Inventory Verification in Project Records
• Document the delivery and inventory verification in project records and CRM, linking it to the project file for reference during inspections and quality control checks
Prepare roof deck for installation (e.g., clean, inspect)
Step 1: Conduct an Initial Inspection of the Roof Deck
• Conduct an initial inspection of the roof deck to identify any visible damage, debris, or issues that could affect the installation of roofing materials
• Take detailed notes on any areas that require repair or additional cleaning
Step 2: Clean the Roof Deck to Remove Debris and Obstructions
• Clean the roof deck to remove debris, dust, and any obstructions that could compromise the roofing underlayment or materials
• Use appropriate tools and safety measures to ensure a thorough cleaning
Step 3: Check for Structural Integrity and Stability
• Check the roof deck for structural integrity and stability, inspecting for signs of weakness, rot, or water damage
• Confirm that the roof deck meets load-bearing requirements and is ready for installation
Step 4: Repair Any Identified Issues on the Roof Deck
• Repair any identified issues on the roof deck, such as replacing damaged sections, reinforcing weak areas, or sealing leaks
• Verify that all repairs meet industry standards and project specifications
Step 5: Apply Protective Coatings or Treatments (if required)
• Apply protective coatings or treatments to the roof deck if required by project specifications, such as moisture barriers or primers
• Ensure that coatings are applied evenly and allowed to cure according to manufacturer guidelines
Step 6: Confirm Roof Deck Readiness with Key Team Members
• Confirm roof deck readiness with key team members, including the project manager and site supervisor, before proceeding with underlayment installation
• Communicate any concerns or special requirements identified during preparation
Step 7: Document Roof Deck Preparation Activities in Project Records
• Document all roof deck preparation activities in project records and CRM, linking them to the project file for reference during quality control and inspections
Remove existing damaged roofing materials
Step 1: Identify Sections of the Roof for Removal Based on the Assessment
• Identify sections of the roof that require removal based on the damage assessment and project scope
• Mark these sections clearly to guide the removal process and avoid unnecessary damage
Step 2: Gather Necessary Tools and Safety Equipment for Removal
• Gather the necessary tools and safety equipment for the removal process, such as pry bars, hammers, safety harnesses, and gloves
• Confirm that all crew members are equipped with the required PPE and understand the safety protocols
Step 3: Remove Damaged Shingles, Tiles, or Roofing Panels Carefully
• Remove damaged shingles, tiles, or roofing panels carefully to avoid causing additional damage to the roof deck or surrounding areas
• Use appropriate techniques and tools to lift and detach materials without compromising structural integrity
Step 4: Inspect the Roof Deck for Hidden Damage During Removal
• Inspect the roof deck for hidden damage as the existing roofing materials are removed, paying attention to areas like flashing, penetrations, and valleys
• Take notes on any additional repairs needed before proceeding with new material installation
Step 5: Dispose of Removed Materials in Compliance with Environmental Guidelines
• Dispose of removed materials in compliance with environmental guidelines and project waste disposal protocols
• Use designated disposal bins or trucks to transport waste materials off-site safely
Step 6: Conduct a Final Inspection of the Cleared Roof Sections
• Conduct a final inspection of the cleared roof sections to confirm that all damaged materials have been removed and that the roof deck is ready for further preparation
• Address any remaining issues identified during the inspection
Step 7: Document the Removal Activities and Any Identified Issues in Project Records
• Document all removal activities and any identified issues in project records and CRM, linking them to the project file for reference during repairs and inspections
Repair or replace any damaged decking or structural elements
Step 1: Assess the Condition of the Roof Decking and Structural Elements
• Assess the condition of the roof decking and structural elements to identify any areas that require repair or replacement
• Focus on key areas such as rafters, trusses, and decking panels that show signs of damage or deterioration
Step 2: Determine the Scope of Repairs and Required Materials
• Determine the scope of repairs and the required materials, such as new decking panels, fasteners, and reinforcements
• Ensure that the replacement materials match the existing structure in terms of quality and specifications
Step 3: Remove Damaged Decking and Structural Components
• Carefully remove damaged decking and structural components, using appropriate tools and safety measures to prevent further damage
• Dispose of removed components in accordance with waste disposal guidelines
Step 4: Install New Decking and Reinforce Structural Elements
• Install new decking and reinforce structural elements as needed, ensuring that all new materials are properly secured and aligned
• Follow manufacturer guidelines and industry standards for installation and fastening
Step 5: Inspect the Repairs for Stability and Compliance
• Inspect the repairs for stability and compliance with project specifications and building codes
• Confirm that all repaired or replaced sections meet the load-bearing requirements and are ready for underlayment installation
Step 6: Document the Repairs and Replacement Activities in Project Records
• Document all repairs and replacement activities in project records and CRM, linking them to the project file for reference during quality control checks
Step 7: Notify Key Team Members of Completed Repairs
• Notify key team members, such as the project manager and site supervisor, of the completed repairs to confirm readiness for the next installation phase
Install roofing underlayment and moisture barrier
Step 1: Review the Specifications for Underlayment and Moisture Barrier
• Review the specifications for the roofing underlayment and moisture barrier, including materials, thickness, and installation requirements
• Confirm that the selected materials meet project standards and manufacturer guidelines
Step 2: Prepare the Roof Deck for Underlayment Installation
• Prepare the roof deck for underlayment installation by ensuring that the surface is clean, dry, and free of debris
• Inspect the deck for any final adjustments or touch-ups needed before laying the underlayment
Step 3: Install the Roofing Underlayment According to Specifications
• Install the roofing underlayment according to the specifications, starting from the lower edge of the roof and working upward
• Overlap sections as specified and secure the underlayment with the appropriate fasteners, following manufacturer guidelines
Step 4: Apply the Moisture Barrier Over Critical Areas
• Apply the moisture barrier over critical areas such as roof valleys, eaves, and roof penetrations, ensuring complete coverage and proper sealing
• Use additional layers or specialized materials as required to enhance water resistance
Step 5: Inspect the Installed Underlayment and Moisture Barrier for Coverage
• Inspect the installed underlayment and moisture barrier for complete coverage and proper sealing, focusing on vulnerable areas where leaks are more likely to occur
• Make any necessary adjustments or repairs to ensure a watertight seal
Step 6: Document the Underlayment and Moisture Barrier Installation in Project Records
• Document the underlayment and moisture barrier installation in project records and CRM, linking them to the project file for reference during quality inspections
Step 7: Notify Key Team Members of Underlayment Installation Completion
• Notify key team members of the underlayment installation completion to confirm readiness for the installation of roofing materials
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Review Installation Plans and Roofing Material Specifications
• Review the installation plans and roofing material specifications, including layout patterns, fastener requirements, and coverage guidelines
• Confirm that all crew members understand the installation sequence and their assigned roles
Step 2: Organize and Stage Roofing Materials for Efficient Installation
• Organize and stage roofing materials for efficient installation, placing them near the installation areas to minimize handling and movement
• Verify that all materials are in good condition and free of defects
Step 3: Begin Installation from the Roof’s Lower Edge and Work Upward
• Begin the installation from the roof’s lower edge and work upward, following the specified layout pattern and overlapping guidelines
• Use appropriate fasteners and techniques to secure the roofing materials, ensuring proper alignment and spacing
Step 4: Inspect Each Section for Proper Alignment and Secure Fastening
• Inspect each section of installed roofing materials for proper alignment and secure fastening, making adjustments as necessary to achieve a uniform appearance
• Address any misaligned or loose materials promptly to prevent issues later
Step 5: Install Roofing Materials Around Penetrations and Edges
• Install roofing materials around roof penetrations and edges, taking care to properly seal and overlap these areas to prevent water intrusion
• Use specialized techniques and materials to enhance durability and water resistance
Step 6: Conduct a Final Inspection of the Installed Roofing Materials
• Conduct a final inspection of the installed roofing materials to confirm that all sections meet quality standards and project specifications
• Check for issues such as gaps, improper fasteners, or inconsistent overlaps
Step 7: Document the Installation of Roofing Materials in Project Records
• Document the installation of roofing materials in project records and CRM, linking them to the project file for reference during quality control checks
Install flashing and other roof penetrations
Step 1: Review Flashing Specifications and Installation Guidelines
• Review the flashing specifications and installation guidelines, confirming the materials, sizes, and types required for each roof penetration and edge
• Ensure that all crew members understand the proper techniques for flashing installation
Step 2: Install Flashing Around Roof Penetrations and Edges
• Install flashing around roof penetrations and edges, such as chimneys, vents, and skylights, following the specified guidelines for overlap, fasteners, and sealing
• Use appropriate materials and sealants to achieve a watertight seal
Step 3: Secure Flashing with Fasteners and Apply Sealants
• Secure flashing with the specified fasteners, ensuring that all pieces are firmly attached and properly aligned
• Apply sealants to joints and seams to enhance water resistance and prevent leaks
Step 4: Check Flashing for Proper Coverage and Sealing
• Check all installed flashing for proper coverage and sealing, focusing on critical areas such as valleys, roof-to-wall intersections, and vent openings
• Address any gaps or inconsistencies to prevent water intrusion
Step 5: Install Additional Roof Penetration Components (if applicable)
• Install additional roof penetration components if applicable, such as vent caps, collars, or pipe boots, according to manufacturer guidelines
• Confirm that all components are securely attached and properly sealed
Step 6: Conduct a Final Inspection of Flashing and Roof Penetrations
• Conduct a final inspection of all flashing and roof penetrations to confirm that they are properly installed, sealed, and aligned with project specifications
• Take notes on any areas that require further attention or adjustments
Step 7: Document the Flashing and Roof Penetration Installation in Project Records
• Document the flashing and roof penetration installation in project records and CRM, linking them to the project file for reference during quality control checks
Conduct weekly quality control inspections
Step 1: Schedule Weekly Quality Control Inspections in Advance
• Schedule weekly quality control inspections in advance, coordinating with the project team to align inspection dates with key project milestones
• Confirm that all relevant team members are aware of the inspection schedule
Step 2: Prepare a Quality Control Checklist Based on Project Standards
• Prepare a quality control checklist based on project standards and specifications, including sections for key areas such as roofing materials, flashing, penetrations, and safety compliance
• Customize the checklist as needed to address project-specific requirements
Step 3: Conduct a Thorough Inspection of Each Key Area
• Conduct a thorough inspection of each key area on the quality control checklist, checking for issues such as misaligned materials, improper fastening, incomplete sealing, or safety violations
• Take detailed notes and photos of any identified issues
Step 4: Review Safety Protocol Compliance During the Inspection
• Review safety protocol compliance during the inspection, confirming that all crew members are following PPE guidelines, fall protection measures, and site safety protocols
• Address any safety concerns immediately to prevent incidents
Step 5: Discuss Inspection Findings with the Project Team
• Discuss inspection findings with the project team, highlighting key issues that require immediate attention or corrective action
• Assign responsibilities for resolving identified issues and establish deadlines for completion
Step 6: Reinspect Corrected Issues to Confirm Compliance
• Reinspect corrected issues to confirm compliance with project standards and specifications
• Document the resolution of each issue in the quality control checklist
Step 7: Document Weekly Quality Control Inspections in Project Records
• Document weekly quality control inspections in project records and CRM, linking them to the project file for reference during final inspections and client reviews
Coordinate with insurance adjuster for periodic inspections (if applicable)
Step 1: Schedule Periodic Inspections with the Insurance Adjuster
• Schedule periodic inspections with the insurance adjuster based on the project timeline and milestones, confirming dates and times in advance
• Ensure that the project team and adjuster have access to the latest inspection schedule
Step 2: Prepare Documentation and Evidence for Each Inspection
• Prepare all necessary documentation and evidence for each inspection, such as progress reports, damage assessments, photos, and repair logs
• Confirm that all documents are complete, organized, and ready for review by the adjuster
Step 3: Review Inspection Objectives and Coverage Requirements
• Review the inspection objectives and coverage requirements with the adjuster, confirming the specific areas or issues that need to be inspected
• Align the inspection process with the terms of the client’s insurance policy
Step 4: Facilitate On-Site Access and Coordinate with the Adjuster
• Facilitate on-site access for the adjuster and coordinate with them to guide their inspection of key areas such as repaired sections, material installations, and roofing penetrations
• Address any questions or concerns raised by the adjuster during the inspection
Step 5: Document Inspection Findings and Recommendations
• Document the inspection findings and recommendations provided by the adjuster, including notes on approved repairs, additional requirements, or discrepancies
• Save inspection reports and communications in project records and CRM
Step 6: Communicate Adjuster Feedback and Next Steps to the Project Team
• Communicate the adjuster’s feedback and next steps to the project team, highlighting any required adjustments or follow-up actions
• Assign tasks to the relevant team members to address identified issues promptly
Step 7: Confirm Inspection Completion with the Adjuster and Client
• Confirm the completion of each periodic inspection with the adjuster and the client, providing updates on findings and any next steps needed to move forward
Perform site cleanup and waste disposal of roofing materials
Step 1: Gather Tools and Equipment for Site Cleanup
• Gather all necessary tools and equipment for site cleanup, such as brooms, shovels, waste bins, and safety gear
• Ensure that all crew members understand their assigned roles and responsibilities during the cleanup process
Step 2: Remove All Roofing Debris and Leftover Materials
• Remove all roofing debris and leftover materials from the work areas, including old shingles, nails, packaging, and damaged components
• Use appropriate safety measures to handle sharp or hazardous materials
Step 3: Separate and Sort Recyclable and Non-Recyclable Waste
• Separate and sort recyclable and non-recyclable waste according to project guidelines and local environmental regulations
• Designate specific waste bins or disposal areas for different types of materials
Step 4: Transport Waste to Designated Disposal Areas or Facilities
• Transport waste to designated disposal areas or facilities, following established protocols for handling, loading, and transporting roofing debris
• Use proper lifting techniques and secure waste during transport to prevent accidents
Step 5: Conduct a Final Walkthrough to Ensure All Debris is Cleared
• Conduct a final walkthrough of the site to ensure that all debris and waste materials have been cleared, paying special attention to gutters, downspouts, and access paths
• Address any remaining waste or obstructions promptly
Step 6: Confirm Compliance with Environmental and Safety Regulations
• Confirm compliance with environmental and safety regulations regarding waste disposal, recycling, and site cleanliness
• Review the cleanup with key team members to verify that all requirements are met
Step 7: Document the Site Cleanup and Waste Disposal Activities in Project Records
• Document the site cleanup and waste disposal activities in project records and CRM, linking them to the project file for reference during final inspections and project closeout
Conduct final inspection of the roofing work
Step 1: Schedule the Final Inspection with Key Team Members
• Schedule the final inspection with key team members, such as the project manager, site supervisor, and quality control personnel
• Confirm that all relevant personnel are aware of the inspection date, time, and objectives
Step 2: Prepare a Comprehensive Final Inspection Checklist
• Prepare a comprehensive final inspection checklist that covers all key aspects of the roofing work, including material installation, flashing, penetrations, and safety measures
• Customize the checklist to address project-specific requirements
Step 3: Conduct a Detailed Visual and Structural Inspection of the Roof
• Conduct a detailed visual and structural inspection of the roof, focusing on areas such as shingle alignment, secure fasteners, proper sealing, and water drainage
• Use the checklist to guide the inspection and ensure consistency
Step 4: Verify Compliance with Project Specifications and Client Requirements
• Verify that all completed roofing work complies with project specifications, manufacturer guidelines, and client requirements
• Confirm that key elements, such as material types, colors, and finishes, align with the approved plans
Step 5: Take Photos and Document Key Findings During the Inspection
• Take photos and document key findings during the inspection, noting any remaining issues, deficiencies, or areas that require touch-ups
• Use clear and concise language to describe the findings for the project records
Step 6: Discuss Inspection Results with the Project Team
• Discuss the inspection results with the project team, highlighting any final adjustments or repairs needed to achieve project completion
• Assign responsibilities for addressing identified issues and confirm deadlines for completion
Step 7: Document the Final Inspection and Next Steps in Project Records
• Document the final inspection and next steps in project records and CRM, linking them to the project file for reference during client reviews and project closeout
Notify client that roofing work is substantially complete
Step 1: Prepare a Substantial Completion Report for the Client
• Prepare a substantial completion report for the client, summarizing the completed roofing work, key milestones, and inspection findings
• Include details such as material specifications, warranties, and remaining punch list items (if any)
Step 2: Schedule a Meeting or Call with the Client to Provide the Update
• Schedule a meeting or call with the client to provide the update on substantial completion, confirming the date and time in advance
• Ensure that key team members are available to address any client questions or concerns
Step 3: Present the Substantial Completion Report to the Client
• Present the substantial completion report to the client, reviewing key elements such as completed tasks, quality inspections, and compliance with project specifications
• Highlight any remaining tasks or touch-ups that will be addressed in the final phase
Step 4: Reiterate the Next Steps and Project Closeout Process
• Reiterate the next steps and project closeout process, including final inspections, punch list resolution, and delivery of warranties or maintenance guides
• Confirm the client’s understanding of the remaining actions and timelines
Step 5: Invite the Client to Provide Feedback or Raise Concerns
• Invite the client to provide feedback or raise any concerns they may have about the completed work or next steps
• Take detailed notes on the client’s feedback to address any remaining issues promptly
Step 6: Provide Contact Information for Ongoing Support and Communication
• Provide the client with contact information for ongoing support and communication, including who to reach out to for final inspections or warranty questions
• Reiterate your commitment to ensuring client satisfaction
Step 7: Document the Substantial Completion Notification in Project Records
• Document the substantial completion notification in project records and CRM, linking it to the client’s file for reference during final inspections and project closeout
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.