Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for Storm Damage Restoration (Commercial) roofing projects. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your Storm Damage Restoration (Commercial) projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Review Availability of Key Team Members and Client
• Review the availability of key team members and the client, such as the project manager, site supervisor, and key subcontractors
• Confirm that all necessary personnel are available for the proposed meeting dates
Step 2: Propose Multiple Kickoff Meeting Dates and Times
• Propose multiple kickoff meeting dates and times to the client, offering flexibility to accommodate their schedule
• Clearly communicate the proposed options and confirm the client’s preferred date and time
Step 3: Confirm Meeting Details with Client and Team Members
• Once the client selects a preferred date and time, confirm the meeting details with all participants, including the project team and any necessary stakeholders
• Send a calendar invitation that includes the meeting date, time, location (or virtual link), and a brief agenda
Step 4: Prepare a Kickoff Meeting Agenda and Materials
• Prepare a kickoff meeting agenda and materials, outlining key discussion points such as project goals, roles, timelines, and safety protocols
• Include a project overview and key visuals to guide the discussion and align expectations
Step 5: Send a Meeting Reminder to the Client and Team Members
• Send a meeting reminder to the client and team members one day before the scheduled meeting
• Include any relevant documents or materials that participants should review beforehand
Step 6: Confirm Technical or Venue Arrangements for the Meeting
• Confirm that all technical or venue arrangements are in place, such as virtual meeting links, conference rooms, or presentation equipment
• Test the setup to avoid technical issues during the meeting
Step 7: Document the Kickoff Meeting Schedule and Agenda in CRM
• Document the kickoff meeting schedule and agenda in CRM, linking it to the client’s project file for easy reference during and after the meeting
Hold project kickoff meeting
Step 1: Begin the Meeting with Introductions and Meeting Objectives
• Begin the meeting by introducing all participants, including key project team members, subcontractors, and client representatives
• Outline the objectives of the meeting, such as aligning project goals, roles, and timelines
Step 2: Review the Project Scope, Goals, and Deliverables
• Review the project scope, goals, and deliverables, confirming key milestones and specific requirements with the client
• Reiterate the project’s vision and objectives to establish a shared understanding
Step 3: Discuss the Project Timeline and Key Milestones
• Discuss the project timeline and key milestones, reviewing critical paths, dependencies, and any potential risks or constraints
• Confirm that all participants are aware of the project schedule and their responsibilities
Step 4: Outline Roles, Responsibilities, and Communication Protocols
• Outline the roles and responsibilities of key team members, including the project manager, site supervisor, and subcontractors
• Establish communication protocols and points of contact for issue resolution and progress updates
Step 5: Review Safety Protocols and Quality Control Measures
• Review safety protocols and quality control measures to ensure that all team members understand and are prepared to follow project-specific guidelines
• Highlight critical safety practices and emergency procedures
Step 6: Invite the Client to Share Their Expectations and Priorities
• Invite the client to share their expectations and priorities for the project, encouraging them to provide input on key focus areas
• Take notes on the client’s feedback to align future actions with their preferences
Step 7: Document the Meeting Summary and Agreed Actions in Project Records
• Document the meeting summary and agreed actions in project records and CRM, including notes on key decisions, timelines, and responsibilities
Introduce client to project manager and key team members
Step 1: Schedule a Formal Introduction Session with the Client
• Schedule a formal introduction session with the client to introduce them to the project manager and key team members
• Confirm the meeting date, time, and format (in-person or virtual) with all participants
Step 2: Prepare an Introduction Agenda and Key Talking Points
• Prepare an introduction agenda and key talking points, including team roles, responsibilities, and client expectations
• Highlight the project manager’s role in coordinating the project and addressing client concerns
Step 3: Begin the Introduction with a Brief Overview of the Team
• Begin the introduction with a brief overview of the project team, including each member’s role and area of expertise
• Emphasize the team’s experience and commitment to meeting the client’s goals
Step 4: Facilitate a Discussion Between the Client and Key Team Members
• Facilitate a discussion between the client and key team members, encouraging open dialogue about project expectations, goals, and communication preferences
• Invite the client to ask questions or provide additional input
Step 5: Clarify the Project Manager’s Role and Responsibilities
• Clarify the project manager’s role and responsibilities, emphasizing their role as the client’s primary point of contact for project updates and issue resolution
• Reiterate the project manager’s commitment to maintaining clear and timely communication
Step 6: Establish Communication Protocols for Regular Updates
• Establish communication protocols for regular updates, including progress reports, status meetings, and ad-hoc communications as needed
• Confirm that the client knows who to contact for specific questions or concerns
Step 7: Document the Introduction Session in Project Records and CRM
• Document the introduction session in project records and CRM, including notes on key discussions, agreed actions, and communication preferences
Conduct detailed storm damage assessment and inspection
Step 1: Review Client’s Concerns and Preliminary Assessment Findings
• Review the client’s concerns and any preliminary assessment findings from previous inspections to identify key areas of focus for the detailed assessment
• Confirm the client’s expectations and specific issues they want addressed
Step 2: Prepare a Comprehensive Inspection Checklist
• Prepare a comprehensive inspection checklist that covers all key components of the roof and exterior, including flashing, drainage systems, roof penetrations, and structural integrity
• Use this checklist to ensure that no critical areas are overlooked
Step 3: Perform a Thorough Visual and Structural Inspection
• Perform a thorough visual and structural inspection of the roof, exterior, and surrounding areas, paying close attention to storm-related damage such as missing shingles, dents, leaks, or broken components
• Use specialized tools as needed, such as moisture meters, drones, or infrared cameras
Step 4: Document Identified Damage with Detailed Notes and Photos
• Document identified damage with detailed notes and photos, using clear labels and consistent naming conventions for each damaged area
• Highlight critical issues that require immediate attention or further investigation
Step 5: Evaluate the Condition of Roof Penetrations and Drainage Systems
• Evaluate the condition of roof penetrations, drainage systems, and other vulnerable areas such as skylights, vents, and gutters
• Confirm that these components are properly sealed and functioning correctly
Step 6: Discuss Findings and Preliminary Recommendations with the Client
• Discuss your findings and preliminary recommendations with the client, providing clear explanations and visual references to help them understand the scope of damage and necessary repairs
Step 7: Save the Assessment Report and Photos in Project Records
• Save the detailed assessment report and photos in project records and CRM, linking them to the client’s file for reference during planning and proposal phases
Finalize project plans and specifications
Step 1: Review the Scope of Work and Client’s Requirements
• Review the scope of work and the client’s requirements based on the storm damage assessment and previous consultations
• Confirm that all key elements, such as repair tasks, materials, and timelines, are accurately defined
Step 2: Collaborate with Key Team Members to Finalize Plans
• Collaborate with key team members, such as the project manager, estimator, and quality control personnel, to finalize the project plans and specifications
• Ensure that all team members understand their roles and responsibilities
Step 3: Define Technical Specifications for Materials and Installation
• Define technical specifications for materials and installation methods, considering factors such as manufacturer guidelines, industry standards, and site conditions
• Verify that all specified materials are compatible and meet client expectations
Step 4: Include Safety Protocols and Quality Control Measures
• Include safety protocols and quality control measures in the project plans, outlining key procedures for risk mitigation, compliance, and inspections
• Confirm that all protocols align with company policies and regulatory requirements
Step 5: Prepare a Detailed Scope of Work Document for Client Review
• Prepare a detailed scope of work document for client review, including key sections such as project goals, tasks, materials, and responsibilities
• Use clear and concise language to ensure client understanding
Step 6: Review Finalized Plans and Specifications with the Client
• Review the finalized plans and specifications with the client, addressing any remaining questions or concerns they may have
• Obtain client approval to proceed with the next phases of the project
Step 7: Save Finalized Plans in Project Records and CRM
• Save the finalized plans and specifications in project records and CRM, linking them to the client’s file for reference during execution and quality control
Verify material pricing and lead times
Step 1: Request Updated Quotes from Approved Suppliers
• Request updated quotes from approved suppliers for all required materials, focusing on obtaining current market rates and availability information
• Confirm that the requested quantities and specifications match the project’s requirements
Step 2: Compare Quotes and Identify Cost-Saving Opportunities
• Compare quotes from different suppliers to identify cost-saving opportunities without compromising quality
• Consider factors such as bulk discounts, alternative materials, and supplier reliability
Step 3: Verify Lead Times for Critical Materials
• Verify lead times for critical materials, such as roofing components, flashing, and drainage systems, to ensure timely delivery based on the project timeline
• Consider potential supply chain disruptions and include buffer periods if necessary
Step 4: Review and Update Material Budget Based on Quotes
• Review and update the material budget based on the received quotes, reflecting the latest pricing information and any negotiated discounts
• Confirm that the updated budget aligns with the client’s financial expectations
Step 5: Confirm Material Availability and Order Timelines with Suppliers
• Confirm material availability and order timelines with suppliers, ensuring that all key items can be delivered within the required timeframe
• Document any special instructions or delivery requirements to prevent delays
Step 6: Communicate Updated Pricing and Lead Times to the Project Team
• Communicate the updated pricing and lead times to the project team, highlighting critical items that require close monitoring or expedited actions
• Confirm that all team members are aware of potential risks or constraints
Step 7: Save Updated Quotes and Pricing Information in Project Records
• Save updated quotes and pricing information in project records and CRM, linking them to the client’s file for reference during budgeting and procurement phases
Develop detailed project schedule
Step 1: Break Down the Project Scope into Phases and Key Tasks
• Break down the project scope into phases and key tasks, identifying specific activities, dependencies, and milestones
• Confirm that each phase is clearly defined and aligned with the client’s expectations
Step 2: Estimate Task Durations Based on Historical Data and Standards
• Estimate task durations based on historical data, industry standards, and project-specific conditions
• Confirm that estimated durations are realistic and allow for efficient use of resources
Step 3: Assign Resources to Each Task Based on Availability and Skills
• Assign resources to each task based on team member availability, skills, and experience, ensuring that each task is adequately staffed
• Verify that key personnel are available for critical tasks or high-risk phases
Step 4: Develop a Visual Project Timeline Using Management Software
• Develop a visual project timeline using project management software, such as a Gantt chart or task board, to map out task sequences, dependencies, and deadlines
• Ensure that the timeline is clear and easy to understand for the entire team
Step 5: Establish Buffer Times for High-Risk Tasks or Dependencies
• Establish buffer times for high-risk tasks or dependencies to accommodate potential delays or unforeseen issues
• Identify critical paths and key constraints that require close monitoring
Step 6: Review the Detailed Project Schedule with the Team for Feasibility
• Review the detailed project schedule with the project team to confirm its feasibility and accuracy
• Make necessary adjustments based on team feedback to ensure that the schedule is realistic
Step 7: Save the Finalized Schedule in Project Records and CRM
• Save the finalized schedule in project records and CRM, linking it to the client’s file for reference during execution and monitoring phases
Confirm client's final selections (materials, colors, etc.)
Step 1: Review Material and Design Options with the Client
• Review material and design options with the client, highlighting key choices such as roofing materials, colors, finishes, and design elements
• Provide samples or visual references to help the client make informed decisions
Step 2: Confirm the Client’s Final Selections and Preferences
• Confirm the client’s final selections and preferences, verifying their choices for materials, colors, and any customizations
• Ensure that all selections align with the project’s specifications and budget
Step 3: Document Final Selections in a Client Approval Form
• Document the client’s final selections in a client approval form, including specific details such as material types, colors, finishes, and quantities
• Obtain the client’s signature on the form to confirm their approval
Step 4: Update the Project Plan and Material Orders Based on Selections
• Update the project plan and material orders based on the client’s final selections, ensuring that all specifications are accurately reflected in purchase orders and schedules
• Confirm that suppliers are informed of any changes or special instructions
Step 5: Communicate Final Selections to Key Team Members
• Communicate the client’s final selections to key team members, such as the project manager, site supervisor, and procurement officer
• Highlight any critical details or customizations that require special attention
Step 6: Prepare a Summary of Final Selections for Client Reference
• Prepare a summary of the client’s final selections for their reference, including visual references and key specifications
• Provide a copy to the client for their records and offer additional support if needed
Step 7: Save the Client’s Final Selections in Project Records and CRM
• Save the client’s final selections in project records and CRM, linking them to the client’s file for reference during execution and quality control phases
Order materials and equipment
Step 1: Review Final Material and Equipment Requirements
• Review the final material and equipment requirements based on the client’s confirmed selections, project scope, and updated plans
• Confirm that all quantities, specifications, and special instructions are accurately defined
Step 2: Prepare Purchase Orders for Materials and Equipment
• Prepare purchase orders for all required materials and equipment, ensuring that each order includes detailed specifications, quantities, and delivery timelines
• Verify that purchase orders align with approved supplier quotes and budget allocations
Step 3: Submit Purchase Orders to Approved Suppliers
• Submit purchase orders to approved suppliers, following the established procurement process and company policies
• Confirm that suppliers acknowledge receipt of the orders and agree to the delivery timelines
Step 4: Coordinate Payment and Delivery Arrangements with Suppliers
• Coordinate payment and delivery arrangements with suppliers, confirming the agreed payment terms, delivery schedules, and any special instructions
• Ensure that all payments are processed in accordance with company policies and project budgets
Step 5: Monitor Order Status and Confirm Delivery Dates
• Monitor the status of each order to confirm that materials and equipment will be delivered on time
• Address any delays or issues proactively to prevent project disruptions
Step 6: Communicate Order Details to Key Team Members
• Communicate order details to key team members, such as the project manager, site supervisor, and logistics coordinator
• Provide updates on expected delivery dates and any special handling requirements
Step 7: Save Purchase Orders and Supplier Communications in Project Records
• Save purchase orders and supplier communications in project records and CRM, linking them to the project file for reference during procurement and delivery phases
Verify subcontractor availability and schedules (if applicable)
Step 1: Identify Required Subcontractors Based on Project Scope
• Identify the required subcontractors based on the project scope and specific tasks, such as roofing, electrical work, or inspections
• Confirm that all necessary subcontractor services are clearly defined and aligned with project requirements
Step 2: Contact Subcontractors to Confirm Availability
• Contact each subcontractor to confirm their availability for the project’s planned schedule, discussing key dates, critical tasks, and potential conflicts
• Verify that subcontractors have the necessary resources and capacity to complete the assigned work
Step 3: Review Subcontractor Schedules and Align with Project Timeline
• Review subcontractor schedules to align their availability with the project’s overall timeline and key milestones
• Address any potential conflicts or scheduling challenges with the project team and subcontractors
Step 4: Confirm Lead Times for Subcontractor-Provided Materials or Equipment
• Confirm lead times for any materials or equipment provided by subcontractors, ensuring that these align with the overall project timeline
• Communicate any special requirements or constraints to the subcontractors in advance
Step 5: Establish Communication Protocols for Schedule Updates
• Establish communication protocols for schedule updates, including regular status meetings or progress reports from subcontractors
• Confirm that subcontractors understand their roles and responsibilities in maintaining the project timeline
Step 6: Document Subcontractor Availability and Schedules in Project Records
• Document subcontractor availability and schedules in project records and CRM, linking them to the project file for reference during scheduling and progress tracking
Step 7: Notify Key Team Members of Subcontractor Schedules and Dependencies
• Notify key team members of subcontractor schedules and any dependencies, highlighting critical tasks that require close coordination
Finalize subcontract terms and prepare subcontract documents (if applicable)
Step 1: Review Subcontractor Scope of Work and Responsibilities
• Review the subcontractor’s scope of work and responsibilities based on the project’s final plans and requirements
• Confirm that all tasks, deliverables, and quality standards are clearly defined and understood
Step 2: Draft Subcontract Documents with Agreed Terms and Conditions
• Draft subcontract documents with the agreed terms and conditions, including the scope of work, payment schedule, timeline, and any special requirements
• Use clear and concise language to minimize ambiguity and potential disputes
Step 3: Include Legal and Compliance Requirements in Subcontract
• Include all necessary legal and compliance requirements in the subcontract, such as safety regulations, warranties, liability clauses, and change order procedures
• Verify that the subcontract aligns with industry standards and company policies
Step 4: Review Draft Subcontract with Key Stakeholders for Accuracy
• Review the draft subcontract with key stakeholders, such as the project manager, legal advisor, and subcontractor representatives, to confirm its accuracy and feasibility
• Address any discrepancies or concerns promptly
Step 5: Obtain Internal Approvals for Finalized Subcontract
• Obtain internal approvals for the finalized subcontract from relevant stakeholders, ensuring that all parties agree to the terms and conditions
• Make any final adjustments based on stakeholder feedback
Step 6: Prepare Subcontract Documents for Client and Subcontractor Review
• Prepare the subcontract documents for client and subcontractor review, organizing them into clear sections for easy understanding
• Include signature blocks for all necessary parties and provide instructions for completing the signing process
Step 7: Save Finalized Subcontract Documents in Project Records and CRM
• Save the finalized subcontract documents in project records and CRM, linking them to the project file for reference during execution and compliance monitoring
Obtain client signatures on subcontract (if applicable)
Step 1: Schedule a Meeting or Call to Review Subcontract with the Client
• Schedule a meeting or call with the client to review the subcontract, confirming the date, time, and format (in-person or virtual)
• Send the finalized subcontract documents to the client in advance for their review and preparation
Step 2: Begin the Meeting by Outlining Key Terms and Objectives
• Begin the meeting by outlining the key terms and objectives of the subcontract, such as the scope of work, payment schedule, and key responsibilities
• Confirm that the client understands the purpose of the meeting and the key sections of the subcontract
Step 3: Review Key Sections of the Subcontract in Detail
• Review key sections of the subcontract in detail, focusing on critical elements such as scope, timelines, payment terms, and contingencies
• Invite the client to ask questions or seek clarifications about any sections they find unclear
Step 4: Confirm Client’s Understanding and Agreement on All Terms
• Confirm the client’s understanding and agreement on all terms, ensuring that they fully accept each section of the subcontract
• Reiterate your commitment to meeting their expectations and maintaining transparency
Step 5: Provide Instructions for Signing and Next Steps
• Provide instructions for signing the subcontract and outline the next steps, such as initiating work, making initial payments, or coordinating with subcontractors
• Confirm that the client knows who to contact for further support or questions
Step 6: Obtain Client Signatures and Provide a Signed Copy
• Obtain the client’s signatures on the subcontract, either in person or through a secure digital signature platform
• Provide the client with a signed copy of the subcontract for their records
Step 7: Document the Subcontract Signing in Project Records and CRM
• Document the subcontract signing in project records and CRM, linking the signed subcontract to the client’s file for reference during project execution and compliance tracking
Provide subcontractor with a copy of the signed subcontract (if applicable)
Step 1: Prepare Copies of the Signed Subcontract for Distribution
• Prepare copies of the signed subcontract for distribution to the subcontractor, ensuring that all pages are included and clearly labeled with the project name and date
• Confirm that the subcontractor’s contact information is accurate and up-to-date
Step 2: Send the Signed Subcontract to the Subcontractor
• Send the signed subcontract to the subcontractor, following the agreed-upon method (e.g., email, postal service, or secure digital platform)
• Include a confirmation request to verify receipt of the document
Step 3: Provide Instructions for Subcontractor Reference and Compliance
• Provide instructions for the subcontractor to reference and comply with the signed subcontract, highlighting key sections such as payment terms, safety protocols, and change order procedures
• Offer additional support or clarification if needed
Step 4: Confirm Subcontractor’s Receipt and Agreement to the Terms
• Confirm that the subcontractor has received the signed subcontract and agrees to the terms and conditions outlined in the document
• Address any final questions or concerns they may have before project execution begins
Step 5: Communicate Key Responsibilities and Project Start Dates
• Communicate key responsibilities and project start dates to the subcontractor, ensuring that they are aware of their role and timeline requirements
• Confirm that they have the necessary resources and support to meet project expectations
Step 6: Document the Subcontract Distribution and Confirmation in Project Records
• Document the subcontract distribution and confirmation in project records and CRM, linking it to the project file for reference during project execution
Step 7: Notify Key Team Members of Subcontractor Compliance and Start Dates
• Notify key team members of the subcontractor’s compliance and start dates, highlighting any critical tasks or dependencies that require coordination
Review permitting requirements
Step 1: Identify All Required Permits for the Project
• Identify all required permits for the project based on the scope of work, location, and applicable local regulations
• Confirm specific permit types such as building permits, environmental permits, or safety permits
Step 2: Research Local Regulations and Guidelines
• Research local regulations and guidelines to ensure that all permit applications comply with jurisdiction-specific requirements
• Verify that you have the most up-to-date information regarding codes, standards, and timelines
Step 3: Consult with Relevant Authorities or Consultants (if applicable)
• Consult with relevant authorities or consultants to clarify permit requirements or address any ambiguities
• Establish direct lines of communication with key contacts at permitting offices
Step 4: Review Permit Application Procedures and Deadlines
• Review permit application procedures and deadlines, noting the documentation, forms, and fees required for each permit
• Create a timeline for submitting permit applications to avoid delays
Step 5: Compile Necessary Documentation for Permit Applications
• Compile all necessary documentation for each permit application, such as project plans, site drawings, safety protocols, and contractor licenses
• Ensure that all documents are accurate, complete, and ready for submission
Step 6: Assign Responsibilities for Permit Applications and Follow-Up
• Assign responsibilities for permit applications and follow-up tasks to key team members
• Confirm that all personnel understand their roles and have access to the necessary information
Step 7: Document Permit Requirements and Timeline in Project Records
• Document the permit requirements and application timeline in project records and CRM, linking them to the project file for future reference
Procure necessary permits
Step 1: Prepare All Permit Application Forms and Supporting Documents
• Prepare all permit application forms and supporting documents, ensuring that each form is completed accurately and aligned with regulatory requirements
• Double-check all documentation for consistency and completeness
Step 2: Submit Permit Applications to Relevant Authorities
• Submit permit applications to relevant authorities, following the established submission procedures for each permit
• Use secure and trackable submission methods to confirm receipt of applications
Step 3: Pay Permit Fees and Obtain Payment Receipts
• Pay all required permit fees and obtain payment receipts from the relevant authorities
• Verify that the payments are correctly processed and recorded in the project’s financial records
Step 4: Track the Status of Each Permit Application
• Track the status of each permit application using project management software or a dedicated tracking sheet
• Establish regular follow-ups with permitting authorities to address any potential issues or delays
Step 5: Address Any Issues or Revisions Requested by Authorities
• Address any issues or revisions requested by permitting authorities, working with key team members to make necessary adjustments promptly
• Resubmit revised documents as required to obtain approvals
Step 6: Communicate Permit Approvals to Key Team Members
• Communicate permit approvals to key team members, highlighting any conditions or restrictions imposed by the authorities
• Confirm that the project timeline and tasks are adjusted based on the approved permits
Step 7: Document Approved Permits and Compliance Requirements in Project Records
• Document all approved permits and compliance requirements in project records and CRM, linking them to the project file for easy reference during execution
Coordinate with insurance adjuster and confirm coverage details
Step 1: Contact the Insurance Adjuster to Confirm Key Details
• Contact the insurance adjuster to confirm key details related to the client’s policy, such as coverage limits, deductibles, and approved claims
• Establish clear communication channels to facilitate ongoing coordination
Step 2: Review the Scope of Work and Insurance Policy Terms
• Review the scope of work and the client’s insurance policy terms to confirm that all planned repairs and replacements are covered
• Identify any gaps in coverage or exclusions that may require client approval or additional documentation
Step 3: Schedule a Site Visit or Inspection with the Adjuster (if needed)
• Schedule a site visit or inspection with the insurance adjuster if required to verify the extent of damage and confirm coverage eligibility
• Prepare all necessary documentation, such as assessment reports and photos, for the adjuster’s review
Step 4: Discuss Documentation and Evidence Requirements with the Adjuster
• Discuss documentation and evidence requirements with the adjuster, confirming what is needed to process the client’s claim effectively
• Ensure that all required documents, such as damage reports and cost estimates, are complete and accurate
Step 5: Obtain Written Confirmation of Coverage from the Adjuster
• Obtain written confirmation of coverage from the adjuster, including details on approved repairs, replacements, and reimbursement limits
• Keep copies of all communications and confirmation documents in project records
Step 6: Communicate Coverage Details to the Client and Project Team
• Communicate coverage details to the client and project team, confirming that everyone understands the scope of approved work and any financial considerations
• Highlight any out-of-pocket expenses or additional steps required by the client
Step 7: Document Insurance Coverage Details and Adjuster Communications in Project Records
• Document all insurance coverage details and adjuster communications in project records and CRM, linking them to the client’s file for easy reference during planning and execution
Create site safety plan
Step 1: Identify Potential Hazards and Safety Risks
• Identify potential hazards and safety risks specific to the project site, considering factors such as site conditions, equipment usage, weather, and personnel activities
• Consult previous safety reports or records to identify recurring risks
Step 2: Outline Safety Protocols and Emergency Procedures
• Outline safety protocols and emergency procedures for the project site, including measures such as PPE usage, first aid protocols, and fire evacuation plans
• Ensure that all protocols align with regulatory requirements and industry standards
Step 3: Assign Safety Responsibilities to Key Team Members
• Assign safety responsibilities to key team members, such as the project safety officer, site supervisor, and first aid personnel
• Confirm that each assigned member understands their responsibilities and has access to the necessary resources
Step 4: Prepare a Written Site Safety Plan Document
• Prepare a written site safety plan document that includes all identified hazards, protocols, emergency procedures, and contact information for key personnel
• Use clear and concise language to make the plan accessible to all team members
Step 5: Review and Approve the Safety Plan with Project Manager
• Review and approve the safety plan with the project manager, confirming that all critical risks and protocols have been addressed
• Make any necessary revisions based on the project manager’s feedback
Step 6: Distribute the Site Safety Plan to All Team Members
• Distribute the site safety plan to all team members, ensuring that everyone has a copy and understands their roles and responsibilities
• Provide additional training or briefings if required
Step 7: Save the Approved Site Safety Plan in Project Records and CRM
• Save the approved site safety plan in project records and CRM, linking it to the project file for easy reference during execution and safety audits
Create fall protection plan
Step 1: Assess the Site for Fall Hazards and Risk Areas
• Assess the site for potential fall hazards and risk areas, such as elevated work platforms, roof edges, ladders, and skylights
• Identify critical areas where additional safety measures are needed to prevent falls
Step 2: Select Appropriate Fall Protection Systems and Equipment
• Select appropriate fall protection systems and equipment based on the site assessment, such as guardrails, harnesses, safety nets, and lifelines
• Verify that all selected equipment meets industry standards and regulatory requirements
Step 3: Define Safety Protocols for Using Fall Protection Systems
• Define safety protocols for using fall protection systems, including guidelines for equipment inspection, setup, usage, and maintenance
• Outline specific procedures for situations like ladder work, roof access, and material handling at heights
Step 4: Assign Responsibilities for Fall Protection Monitoring and Compliance
• Assign responsibilities for fall protection monitoring and compliance to key team members, such as the site safety officer and supervisors
• Confirm that each assigned member understands their duties and has received proper training
Step 5: Prepare a Written Fall Protection Plan Document
• Prepare a written fall protection plan document that includes identified hazards, selected systems, safety protocols, and emergency response procedures
• Use clear and concise language to make the plan accessible to all team members
Step 6: Review and Approve the Fall Protection Plan with Project Manager
• Review and approve the fall protection plan with the project manager, ensuring that all critical risks and protocols have been addressed
• Make any necessary revisions based on the project manager’s feedback
Step 7: Distribute the Fall Protection Plan to All Team Members
• Distribute the fall protection plan to all team members, ensuring that everyone has a copy and understands their roles and responsibilities
• Provide additional training or briefings if required
Step 8: Save the Approved Fall Protection Plan in Project Records and CRM
• Save the approved fall protection plan in project records and CRM, linking it to the project file for easy reference during execution and safety audits
Establish project communication plan
Step 1: Identify Key Stakeholders and Communication Requirements
• Identify key stakeholders for the project, including the client, project manager, subcontractors, suppliers, and regulatory authorities
• Define specific communication requirements for each stakeholder based on their roles and responsibilities
Step 2: Outline Communication Protocols and Reporting Structure
• Outline communication protocols and reporting structures, specifying how updates, issues, and approvals will be managed throughout the project
• Establish preferred communication channels (e.g., email, phone, meetings) for each type of interaction
Step 3: Define the Frequency and Format of Project Updates
• Define the frequency and format of project updates, such as weekly status meetings, progress reports, and site visits
• Confirm that all stakeholders understand the schedule and expectations for receiving updates
Step 4: Assign Communication Roles to Key Team Members
• Assign communication roles to key team members, such as the project manager, site supervisor, and client liaison
• Ensure that each team member understands their responsibilities and has access to the necessary tools and information
Step 5: Prepare a Written Project Communication Plan Document
• Prepare a written project communication plan document that includes all key protocols, reporting structures, update schedules, and roles
• Use clear and concise language to make the plan accessible to all stakeholders
Step 6: Review and Approve the Communication Plan with the Project Team
• Review and approve the communication plan with the project team, making any necessary adjustments based on team feedback
• Confirm that all team members are aligned with the plan’s objectives
Step 7: Save the Approved Communication Plan in Project Records and CRM
• Save the approved communication plan in project records and CRM, linking it to the project file for easy reference during execution and stakeholder communications
Prepare equipment for mobilization
Step 1: Review the Project Equipment Requirements and Inventory
• Review the project equipment requirements and inventory, confirming the specific tools, machinery, and safety equipment needed for each task
• Verify that all equipment specifications align with the project’s scope and safety protocols
Step 2: Inspect Equipment for Proper Functionality and Safety
• Inspect all equipment for proper functionality and safety compliance, including checking for damage, wear, or required maintenance
• Ensure that safety features and emergency shut-off systems are operational
Step 3: Coordinate Equipment Transport and Logistics
• Coordinate equipment transport and logistics to the project site, confirming transportation schedules, routes, and any special handling requirements
• Confirm that all necessary permits or approvals for transporting heavy equipment are obtained
Step 4: Prepare Equipment Loading and Unloading Plans
• Prepare equipment loading and unloading plans to ensure safe and efficient handling during mobilization
• Assign responsibilities to key personnel for overseeing the transport and setup of critical equipment
Step 5: Communicate Equipment Mobilization Details to the Project Team
• Communicate equipment mobilization details to the project team, including the transport schedule, handling procedures, and on-site setup plan
• Confirm that all team members understand their roles and responsibilities during mobilization
Step 6: Ensure Backup Equipment and Contingency Plans are in Place
• Ensure that backup equipment and contingency plans are in place in case of equipment failure or unexpected issues
• Verify that spare parts, fuel, and essential supplies are readily available
Step 7: Document Equipment Mobilization Plans and Safety Checks in Project Records
• Document all equipment mobilization plans and safety checks in project records and CRM, linking them to the project file for easy reference during site setup and execution
Prepare site for construction
Step 1: Conduct a Site Inspection to Identify Preparation Tasks
• Conduct a site inspection to identify all necessary preparation tasks, such as clearing debris, leveling ground, and marking access routes
• Confirm that the site conditions align with the project’s plans and requirements
Step 2: Establish Access Routes and Secure Perimeter
• Establish access routes for vehicles and equipment, ensuring that all paths are clearly marked and safe for transport
• Secure the site perimeter using barriers, fencing, and signage to prevent unauthorized access
Step 3: Set Up Temporary Facilities and Utilities (if applicable)
• Set up temporary facilities and utilities if required, such as portable restrooms, storage units, power connections, and water supply
• Confirm that all facilities meet safety and regulatory standards
Step 4: Prepare Material Storage Areas and Equipment Staging Zones
• Prepare designated material storage areas and equipment staging zones, organizing them for easy access and secure storage
• Mark storage zones clearly and provide instructions for proper material handling and stacking
Step 5: Implement Initial Safety Measures and Signage
• Implement initial safety measures and signage, such as installing warning signs, protective barriers, and hazard markers
• Ensure that all safety measures comply with project-specific protocols and regulatory guidelines
Step 6: Coordinate with Subcontractors and Suppliers for Site Deliveries
• Coordinate with subcontractors and suppliers for site deliveries, confirming schedules and unloading procedures
• Establish clear communication protocols for tracking and receiving deliveries on-site
Step 7: Document Site Preparation Activities and Compliance Checks
• Document all site preparation activities and compliance checks in project records and CRM, linking them to the project file for reference during execution and inspections
Conduct final pre-construction review meeting
Step 1: Schedule the Pre-Construction Review Meeting with Key Stakeholders
• Schedule the final pre-construction review meeting with key stakeholders, including the project manager, site supervisor, client, subcontractors, and safety officer
• Confirm the meeting date, time, and format (in-person or virtual) with all participants
Step 2: Prepare a Pre-Construction Review Agenda and Checklist
• Prepare a pre-construction review agenda and checklist, covering critical topics such as project scope, timeline, safety protocols, and responsibilities
• Distribute the agenda to all participants in advance of the meeting
Step 3: Review the Project Scope and Deliverables in Detail
• Review the project scope and deliverables in detail, confirming key milestones, responsibilities, and quality expectations with all stakeholders
• Address any ambiguities or concerns raised during the discussion
Step 4: Discuss the Project Timeline and Critical Milestones
• Discuss the project timeline and critical milestones, confirming task dependencies, start dates, and target completion dates for each phase
• Reiterate the importance of meeting key deadlines to ensure project success
Step 5: Confirm Safety Protocols and Quality Control Measures
• Confirm safety protocols and quality control measures, emphasizing compliance with site-specific safety plans, fall protection protocols, and inspection checklists
• Verify that all participants understand and are committed to enforcing these measures
Step 6: Outline Communication Procedures and Emergency Contacts
• Outline communication procedures and emergency contacts, ensuring that all participants have the necessary contact information for reporting issues or emergencies
• Confirm the schedule for regular progress meetings and updates
Step 7: Document the Pre-Construction Review Meeting in Project Records
• Document the pre-construction review meeting in project records and CRM, including notes on key discussions, agreed actions, and follow-up tasks
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.