SOP Templates > Storm Damage Restoration (Commercial) > Sales Workflow
Sales Workflow
Make initial contact with potential client (phone call or email)
Step 1: Gather Client Information
- Obtain the client’s name contact information (phone number and email) and initial project details Confirm the source of the lead and record any pertinent referral details in the CRM
Step 2: Prepare Introduction
- Draft a professional and friendly script or email template to introduce yourself and your company highlighting key services related to residential roof replacement
- Ensure the message sets expectations for the initial communication
Step 3: Verify Contact Method
- Check whether the client has a preferred contact method (phone call text or email) and adjust your communication approach accordingly
- Make note of the client’s preferred contact time if mentioned
Step 4: Make Contact
- Call or email the client using the prepared script or template Confirm that the client is interested in proceeding with an initial consultation or discovery meeting If leaving a voicemail state your name company and reason for calling clearly
Step 5: Schedule Follow-Up
- If the client does not respond within 48 hours plan to follow up with another call or email
- For follow-up use a slightly revised script or message expressing a willingness to answer any questions they might have
Step 6: Record Contact Outcome
- Update your CRM with the details of the attempted contact including the time date and method used
- Make a note of any specific requests or concerns expressed by the client during the conversation
Step 7: Send Confirmation
- If the client confirms interest send an email summarizing the conversation including any agreed follow-up actions and the next steps for the project
Schedule discovery meeting
Step 1: Propose Meeting Times
- Contact the GC via phone or email to suggest three potential dates and times for the meeting.
- Ensure the proposed times are within normal business hours.
Step 2: Confirm Availability
- Wait for the GC’s response and confirm a mutually convenient time.
- If the initial suggestions don’t work propose alternative dates.
Step 3: Send Confirmation
- Send a calendar invitation to the GC with the confirmed date time and location (or virtual meeting link).
- Include a brief agenda outlining the purpose of the meeting.
Step 4: Prepare Agenda
- Draft an agenda covering key discussion points such as project scope budget timeline and any specific requirements from the GC.
- Share the agenda with the GC ahead of the meeting.
Step 5: Gather Necessary Documents
- Collect any relevant materials or documents needed for the meeting (e.g. brochures past project examples note-taking tools).
Step 6: Prepare Internal Team
- Inform any team members who need to attend the meeting.
- Brief them on their roles and the key points to discuss.
Step 7: Confirm Meeting Details
- Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes.
- Ensure that the meeting room (if in-person) or virtual meeting setup is ready.
Step 8: Record in CRM
- Identify potential risks that could impact project costs or timelines.
- Include contingency amounts in your cost estimate to account for these uncertainties.
Conduct client discovery meeting
Step 1: Prepare for the Meeting
- Review any preliminary information gathered about the clients project requirements
- Bring any necessary forms checklists or documents to the meeting
Step 2: Start the Meeting
- Introduce yourself and any team members present
- Explain the purpose and structure of the meeting
Step 3: Gather Information
- Ask targeted questions to understand the client’s needs preferences and project scope
- Take detailed notes throughout the meeting
Step 4: Address Client Questions
- Allow the client to ask any questions they have regarding the project timeline materials or budget
- Provide clear concise answers and take note of any special requests
Step 5: Conclude the Meeting
- Summarize the key points discussed and the next steps
- Thank the client for their time and express enthusiasm for the project
Step 6: Document Meeting
- Record meeting notes in your CRM and share them with relevant team members
- Assign follow-up tasks as needed to address any questions or action items identified during the meeting
Step 7: Send Meeting Summary
- Send an email to the client summarizing the meeting discussion and agreed next steps
- Include any requested documents or additional information
Qualify client based on project scope, budget, and timeline
Step 1: Review Client Information from Discovery Meeting
- Review the clients information recorded during the discovery meeting
- Focus on the project scope, budget, and timeline details provided by the client
Step 2: Assess Project Alignment with Company Capabilities
- Evaluate whether the clients project aligns with your companys capabilities, resources, and experience
- Consider whether your company can realistically meet the clients requirements
Step 3: Determine Financial Feasibility
- Assess the clients estimated budget against the projected costs for the project
- Identify any gaps or areas of concern related to financial feasibility
Step 4: Evaluate Timeline Requirements
- Determine if the clients preferred timeline aligns with your companys current workload and availability
- Consider potential scheduling conflicts or resource constraints
Step 5: Identify Potential Risks
- Identify any potential risks associated with the clients project, such as budget limitations, tight timelines, or complex requirements
- Document these risks for future reference
Step 6: Decide Whether to Proceed or Decline
- Based on the information gathered, decide whether to proceed with the client or decline the opportunity
- If declining, prepare a courteous explanation for the client
Step 7: Communicate Decision to Client
- If proceeding, communicate the decision to the client and outline the next steps
- If declining, thank the client for their interest and provide a clear explanation
Record client information and project details in CRM
Step 1: Access CRM System
- Log into your company’s CRM system using your authorized credentials
Step 2: Create New Client Record
- Navigate to the section for creating a new client record
- Select the appropriate project type Roof Replacement – Residential
Step 3: Input Project Details
- Enter the clients basic information including name contact details and project scope
- Include additional notes gathered during initial contact or the discovery meeting
Step 4: Review and Verify Information
- Double-check all entered information for accuracy
- Cross-reference with any physical documents or email confirmations from the client
Step 5: Save and Update Status
- Save the client and project records in the CRM
- Update the project status to In Progress or a similar status based on company policies
Step 6: Notify Team Members
- Inform relevant team members that the client information is now available in the CRM
- Assign any necessary follow-up tasks or schedule internal meetings if needed
Step 7: Regularly Update CRM
- Set up reminders to regularly update the CRM with new client communications and project progress
- Ensure that all team members have access to the most recent information
Schedule storm damage assessment with the client
Step 1: Review Client Information and Recent Storm Events
- Review the clients information and any relevant details about recent storm events in their area
- Confirm that the clients contact information and property details are up-to-date
Step 2: Contact Client to Discuss Assessment Needs
- Contact the client via their preferred communication method (phone, email, etc.) to discuss their need for a storm damage assessment
- Briefly explain the purpose and benefits of the assessment
Step 3: Confirm Clients Availability for Assessment
- Confirm the clients availability for scheduling the storm damage assessment, offering flexible date and time options
- Take note of any specific concerns or areas the client wants assessed
Step 4: Set a Date and Time for the Assessment
- Set a date and time for the storm damage assessment based on the clients availability and urgency of the situation
- Confirm that the scheduled time aligns with your teams calendar
Step 5: Send Confirmation Details to Client
- Send a confirmation message to the client with the agreed-upon date and time, including any necessary preparation instructions
- Provide contact information for rescheduling or questions
Step 6: Assign Team Members for the Assessment
- Assign the appropriate team members to conduct the storm damage assessment, based on their expertise and availability
- Confirm that all team members are aware of their roles
Step 7: Document Assessment Schedule in CRM
- Document the assessment schedule and client details in the CRM, noting the date, time, assigned team members, and any specific client requests
- Set reminders for the assessment team
Conduct storm damage assessment to evaluate damage and restoration needs
Step 1: Arrive On-Site and Introduce the Assessment Team
- Arrive on-site at the scheduled time and introduce the assessment team to the client
- Establish a professional and friendly tone, explaining the purpose of the assessment
Step 2: Review the Scope of the Assessment with the Client
- Review the scope of the storm damage assessment with the client, including key areas to inspect and evaluate
- Confirm that the client is aware of the process and timeline
Step 3: Conduct a Thorough Visual Inspection
- Conduct a thorough visual inspection of the exterior and interior areas affected by the storm
- Look for signs of damage such as missing shingles, leaks, structural issues, and water intrusion
Step 4: Evaluate Structural Integrity and Safety Hazards
- Evaluate the structural integrity of the affected areas and identify any potential safety hazards
- Use appropriate tools and techniques to assess the extent of the damage
Step 5: Check for Hidden Damage or Secondary Issues
- Check for hidden damage or secondary issues such as mold, weakened support beams, or compromised insulation
- Document any findings that require further inspection
Step 6: Communicate Findings to the Client
- Communicate your findings to the client, explaining the severity and potential impact of the damage
- Offer preliminary recommendations for repairs or restoration
Step 7: Document Key Observations for Follow-Up Report
- Document key observations from the assessment in preparation for the follow-up report
- Take detailed notes and ensure all critical points are recorded
Take detailed notes and photos of the damage
Step 1: Prepare for Documentation During Assessment
- Prepare for the assessment by ensuring all documentation tools are ready, including cameras, notepads, and digital devices
- Confirm that the team understands the documentation requirements
Step 2: Take Photos of Visible Damage
- Take photos of all visible damage, focusing on areas of concern identified during the visual inspection
- Capture images from multiple angles to provide a comprehensive view
Step 3: Document Measurements and Structural Details
- Document measurements of damaged areas and record structural details such as material type, location, and condition
- Use a measuring tape or digital tools to ensure accuracy
Step 4: Record Client Feedback and Observations
- Record any feedback or observations provided by the client during the assessment
- Take notes on specific areas the client has expressed concerns about
Step 5: Label and Organize Photos for the Report
- Label and organize the photos according to the specific areas or types of damage they represent
- Use consistent naming conventions to make it easy to reference each image in the report
Step 6: Review Notes and Photos for Completeness
- Review all notes and photos to ensure that no critical information has been missed
- Confirm that the documentation aligns with the key points discussed during the assessment
Step 7: Save and Back Up All Documentation Files
- Save and back up all notes, photos, and digital files in the CRM or designated project management system
- Confirm that the files are secure and accessible for report preparation
Discuss client needs, preferences, and expectations during assessment
Step 1: Engage the Client in a Detailed Conversation
- Engage the client in a detailed conversation about their needs, preferences, and expectations for the storm damage repairs
- Ask open-ended questions to encourage the client to share their concerns
Step 2: Clarify Clients Priorities and Specific Requirements
- Clarify the clients priorities and specific requirements for the repair work, such as material choices, timeline constraints, or budget considerations
- Take notes to document these preferences
Step 3: Address Client Concerns About Damage Severity
- Address any client concerns about the severity of the damage and its impact on their property
- Provide clear and accurate information to help the client understand the situation
Step 4: Discuss Repair Options and Potential Solutions
- Discuss potential repair options and solutions with the client, outlining the pros and cons of each approach
- Offer recommendations based on the clients needs and your assessment findings
Step 5: Set Realistic Expectations for the Repair Timeline
- Set realistic expectations with the client regarding the repair timeline and potential disruptions
- Confirm that the client understands the steps involved in the restoration process
Step 6: Take Notes on Clients Preferred Communication Method
- Take notes on the clients preferred communication method for receiving updates and information throughout the repair process
- Confirm that the client is comfortable with the planned communication approach
Step 7: Document Key Points and Client Preferences in CRM
- Document all key points and client preferences in the CRM for future reference
- Ensure that the information is accessible to all relevant team members
Answer any initial questions from the client
Step 1: Open the Floor for Questions
- Invite the client to ask any initial questions they may have after the inspection Encourage them to express any specific concerns about the project
Step 2: Provide Clear Responses
- Answer each question thoroughly and ensure the client understands your responses Avoid technical jargon and use simple language when possible
Step 3: Take Notes on Client Concerns
- Record any additional concerns raised by the client that were not previously identified
- Add these to the project file for future reference
Step 4: Confirm Understanding
- Ask the client if they have any remaining questions or if they need clarification on any points Reiterate key takeaways from the discussion
Step 5: Follow-Up with Written Summary
- Send a brief written summary of the Q&A session to the client
- Include links to any resources or documents that may help answer further questions
Step 6: Verify Client Satisfaction
- Ask the client if they feel comfortable with the information provided and address any last-minute concerns
- Confirm next steps with the client
Step 7: Update Client File
- Update the clients file with notes from the Q&A session and any follow-up actions required
Prepare preliminary project proposal based on initial consultation and insurance requirements
Step 1: Review Client Consultation Notes and Documentation
- Review the notes and documentation from the initial consultation, including client needs, project scope, and any specific insurance requirements
- Confirm that all key information is complete and accurately recorded
Step 2: Gather Relevant Project Data and Insurance Guidelines
- Gather all relevant project data, such as inspection reports, photos, and client-provided documents
- Review insurance guidelines to confirm any restrictions, coverage limits, or approval requirements
Step 3: Outline the Preliminary Scope of Work
- Outline the preliminary scope of work based on the clients needs and the findings from the damage assessment
- Break down the key tasks and activities required for the project
Step 4: Align Proposal with Insurance Requirements
- Align the preliminary project proposal with the insurance requirements, ensuring that all covered items and repair standards are addressed
- Include any necessary justifications or explanations for insurance claims
Step 5: Create an Initial Project Overview and Timeline
- Create an initial project overview, including a rough timeline for key activities and milestones
- Confirm that the proposed timeline aligns with the clients expectations and urgency
Step 6: Draft the Preliminary Project Proposal Document
- Draft the preliminary project proposal document, including an introduction, project scope, timeline, and insurance-related considerations
- Ensure that the document is clear, concise, and professionally formatted
Step 7: Review and Finalize the Draft Proposal
- Review the draft proposal for accuracy and completeness, making any necessary revisions
- Confirm that the document aligns with internal standards and client requirements
Develop rough estimate of project costs and timeline
Step 1: Gather Initial Project Information
- Review all initial project information including scope GC requirements and any preliminary notes from consultations.
- Ensure you have a clear understanding of the project’s main components and objectives.
Step 2: Identify Key Project Components
- Break down the project into key components and tasks.
- List all major activities materials and resources required for the project.
Step 3: Research Costs for Materials and Labor
- Collect up-to-date cost data for all materials needed for the project.
- Consult with suppliers and subcontractors to get current pricing for labor and services.
Step 4: Estimate Labor Costs
- Calculate the labor costs based on the number of hours required for each task and the hourly rates of your team members.
- Include any additional labor-related expenses such as overtime or specialized skills.
Step 5: Estimate Material Costs
- Sum the costs of all materials required for the project.
- Include potential contingencies for price fluctuations or unforeseen material needs.
Step 6: Calculate Equipment and Overhead Costs
- Estimate the costs for any equipment rental or usage required for the project.
- Include overhead costs such as project management administrative expenses and utilities.
Step 7: Develop Preliminary Timeline
- Outline a rough timeline for the project identifying key milestones and deadlines.
- Estimate the duration of each task and ensure the timeline aligns with GC expectations.
Step 8: Consider Potential Risks and Contingencies
Step 9: Compile the Rough Estimate
Step 10: Review and Validate the Estimate
Review preliminary proposal with internal team for accuracy
Step 1: Schedule Review Meeting
- Organize a meeting with key team members involved in the project.
- Ensure all relevant participants are available and informed about the purpose of the meeting.
Step 2: Distribute Proposal in Advance
- Send the preliminary proposal to all team members ahead of the meeting.
- Allow sufficient time for them to review the document individually.
Step 3: Prepare for the Meeting
- Highlight key sections of the proposal that require particular attention.
- Prepare any supporting documents or data that may be needed during the review.
Step 4: Conduct the Review Meeting
- Begin the meeting by outlining the agenda and goals.
- Go through the proposal section by section checking for accuracy in project scope cost estimates timelines and deliverables.
Step 5: Identify Errors and Omissions
- Encourage team members to point out any inaccuracies missing information or inconsistencies.
- Take detailed notes on all identified issues for correction.
Step 6: Gather Feedback
- Collect feedback on the proposal’s clarity comprehensiveness and alignment with project goals.
- Note any suggestions for improvement or additional information needed.
Step 7: Assign Corrections
- Delegate specific tasks for correcting identified issues to appropriate team members.
- Set deadlines for making the necessary revisions.
Schedule meeting with client to present preliminary proposal
Step 1: Confirm Clients Availability
- Contact the client to confirm their availability for a proposal presentation meeting offering multiple date and time options
Step 2: Send Meeting Confirmation
- Send a confirmation email to the client including the agreed date time and meeting agenda
Step 3: Prepare Meeting Materials
- Organize and print copies of the preliminary proposal and any supporting documents
- Prepare a presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Location
- Confirm the meeting location or virtual meeting setup
- Test any necessary equipment or presentation software in advance
Step 5: Review Proposal with Internal Team
- Hold a brief internal meeting to review key points of the proposal and client expectations
- Assign roles for the meeting such as who will present and who will address specific questions
Step 6: Communicate Meeting Details to Client
- Send a reminder email to the client a day before the meeting
- Include any pre-meeting instructions or documents the client should review
Step 7: Update Project Management System
- Record the scheduled meeting details in the project management system and assign follow-up tasks if necessary
Present preliminary project proposal to client
Step 1: Start with a Brief Introduction
- Introduce yourself and any team members present at the meeting
- Briefly explain the purpose of the meeting and the agenda
Step 2: Outline Key Sections of the Proposal
- Present key sections of the proposal such as project scope timeline and estimated costs
- Use clear language and avoid technical jargon where possible
Step 3: Highlight Unique Client Requirements
- Emphasize sections of the proposal that reflect the clients unique requirements or preferences
- Offer explanations or context for key decisions in the proposal
Step 4: Address Client Questions
- Allow the client to ask questions after each section of the presentation
- Take notes on any areas of concern or additional requests
Step 5: Discuss Potential Adjustments
- Discuss potential adjustments to the proposal based on the clients feedback
- Offer alternative solutions or approaches where needed
Step 6: Confirm Next Steps
- Confirm the next steps with the client including any follow-up meetings or proposal revisions
- Set a tentative timeline for finalizing the proposal
Step 7: Document Meeting Outcome
- Record the outcome of the meeting in your project management system
- Include key points of discussion client feedback and agreed next steps
Discuss project scope, budget, and timeline in detail
Step 1: Review Proposal and Key Discussion Points with the Team
- Review the project proposal and key discussion points with the internal team before meeting with the client
- Confirm that all team members are prepared to address specific aspects of the scope, budget, and timeline
Step 2: Schedule and Confirm a Client Meeting
- Schedule a meeting with the client to discuss the project scope, budget, and timeline in detail
- Confirm the date, time, and location with the client, and send a calendar invitation
Step 3: Begin the Meeting with Introductions and Agenda Review
- Begin the meeting with introductions, and review the meeting agenda with the client
- Establish a professional tone and set clear expectations for the discussion
Step 4: Present the Detailed Project Scope
- Present the detailed project scope to the client, highlighting the key deliverables, milestones, and critical activities
- Use visuals or diagrams if needed to illustrate key aspects
Step 5: Discuss the Preliminary Budget and Cost Breakdown
- Discuss the preliminary budget and provide a breakdown of key costs, including labor, materials, and any additional expenses
- Emphasize any cost-saving measures or options available
Step 6: Review and Explain the Proposed Timeline
- Review and explain the proposed timeline, including key milestones and expected completion dates
- Address any potential scheduling conflicts or risks identified during planning
Step 7: Encourage Client to Ask Questions and Provide Feedback
- Encourage the client to ask questions or provide feedback about the project scope, budget, or timeline
- Take notes on any client concerns or requests for adjustments
Gather feedback from client and address any concerns or questions
Step 1: Listen Actively to Client Feedback
- Listen actively to the clients feedback, noting their concerns, preferences, and questions
- Show empathy and understanding for their perspective
Step 2: Clarify and Address Any Specific Client Concerns
- Clarify and address any specific concerns raised by the client regarding the scope, budget, or timeline
- Provide detailed explanations or solutions as needed
Step 3: Discuss Potential Adjustments with Client
- Discuss potential adjustments to the proposal based on the clients feedback
- Offer options or alternatives that align with the clients goals and constraints
Step 4: Confirm Clients Priorities and Preferences
- Confirm the clients priorities and preferences for the project, such as specific materials, features, or completion deadlines
- Take detailed notes to ensure accurate adjustments
Step 5: Reiterate Next Steps for Refining the Proposal
- Reiterate the next steps for refining the proposal, explaining any actions you will take to address the clients feedback
- Confirm the timeline for presenting the revised proposal
Step 6: Thank the Client for Their Input
- Thank the client for their input and reassure them that their feedback is valued
- Confirm that all concerns and questions have been addressed to their satisfaction
Step 7: Document Client Feedback and Adjustments in CRM
- Document the clients feedback and any agreed-upon adjustments in the CRM
- Update the project status to reflect the feedback and revision phase
Make adjustments to the proposal as needed based on client feedback
Step 1: Review Client Feedback and Meeting Notes
- Review the clients feedback and meeting notes, focusing on the key adjustments requested
- Confirm that all client concerns and preferences are clearly understood
Step 2: Identify Specific Changes to Project Scope or Details
- Identify specific changes needed to the project scope, budget, timeline, or other proposal details
- Determine how these changes impact the overall project plan
Step 3: Revise Project Scope and Key Deliverables
- Revise the project scope and key deliverables based on the clients feedback
- Ensure that the revised scope aligns with the clients expectations and priorities
Step 4: Update Budget and Cost Estimates
- Update the budget and cost estimates to reflect any changes made to the project scope, materials, or labor requirements
- Confirm that the revised estimates remain within the clients budget constraints
Step 5: Adjust Project Timeline and Milestones
- Adjust the project timeline and milestones as needed to accommodate any changes in scope or resources
- Communicate any scheduling changes to the project team
Step 6: Review the Revised Proposal for Accuracy
- Review the revised proposal for accuracy and completeness, ensuring that all changes are correctly implemented
- Double-check calculations and timelines to avoid discrepancies
Step 7: Prepare the Revised Proposal Document
- Prepare the revised proposal document, clearly highlighting the changes made based on the clients feedback
- Include a summary of adjustments for easy reference
Refine project proposal based on client feedback
Step 1: Evaluate Client Feedback
- Assess the feedback received during client discussions
- Identify key areas where refinement is needed
Step 2: Make Revisions to Key Sections
- Update key sections such as project scope budget and timeline based on the feedback
- Ensure that changes are aligned with client expectations
Step 3: Recalculate Costs and Timeline
- Recalculate the budget and timeline if changes impact project costs or duration
- Highlight any major deviations from the original proposal
Step 4: Review the Refined Proposal with Stakeholders
- Conduct an internal review with stakeholders to verify that all feedback has been addressed
- Make final adjustments as needed
Step 5: Communicate Changes to the Client
- Summarize the refinements made to the proposal in a follow-up meeting or email
- Highlight key changes and their implications
Step 6: Confirm Client Satisfaction
- Ask for final confirmation or approval from the client on the refined proposal
- Address any last-minute concerns or questions
Step 7: Finalize and Save the Refined Proposal
- Save the refined proposal in the project management system
- Share the updated version with the client and internal team
Develop detailed project estimate, including labor, materials, and other costs
Step 1: Review Client Requirements and Scope
- Review the clients requirements and project scope based on the information gathered during the discovery meeting and inspection
- Confirm any specific client preferences or constraints
Step 2: Assess Labor Requirements
- Determine the labor required to complete the project, considering the scope and complexity
- Estimate the number of hours needed and the types of workers involved
Step 3: Calculate Material Costs
- Identify all materials required for the project, including roofing materials, underlayment, flashing, and safety equipment
- Obtain current pricing from suppliers or the companys material database
Step 4: Include Additional Costs
- Account for additional costs such as permits, equipment rentals, disposal fees, and travel expenses
- Consider contingencies for unforeseen expenses
Step 5: Create a Detailed Cost Breakdown
- Create a detailed breakdown of all estimated costs, including labor, materials, and additional expenses
- Separate costs by categories for clarity and transparency
Step 6: Review and Adjust the Estimate
- Review the detailed estimate for accuracy and completeness
- Adjust the estimate based on current rates, potential discounts, or negotiated prices
Step 7: Document the Estimate in the Proposal
- Document the final estimate in the proposal, including the breakdown of costs
- Ensure that the estimate aligns with the clients budget and expectations
Create a comprehensive project timeline
Step 1: Review Project Scope and Requirements
- Examine the project scope deliverables and GC requirements.
- Ensure you have a clear understanding of all tasks and milestones.
Step 2: Identify Key Phases and Milestones
- Break the project into key phases and milestones.
- List all significant events deliverables and deadlines.
Step 3: Define Tasks and Dependencies
- Detail all tasks required to complete each phase.
- Identify dependencies between tasks and determine the sequence of activities.
Step 4: Estimate Task Durations
- Estimate the time required to complete each task.
- Use past project data and team input to ensure accuracy.
Step 5: Allocate Resources
- Assign team members subcontractors and equipment to each task.
- Ensure resources are available and properly allocated.
Step 6: Develop Timeline Draft
- Create a draft timeline using project management software or tools.
- Plot tasks durations and dependencies to visualize the project flow.
Step 7: Review and Adjust
- Share the draft timeline with the project team for feedback.
- Adjust the timeline based on input and resolve any scheduling conflicts.
Step 8: Incorporate Buffer Time
Step 9: Finalize the Timeline
Step 10: Document and Share
Compile all proposal documents, including scope of work, estimate, timeline, and terms and conditions
Step 1: Gather Key Proposal Documents
- Collect all necessary documents including cost estimates project plans material lists and client correspondence
- Ensure that each document is up-to-date and approved
Step 2: Organize Documents by Sections
- Organize the proposal into clear sections such as project overview budget breakdown timeline and client-specific requirements
- Label each section for easy navigation
Step 3: Review and Verify Cost Estimates
- Cross-check cost estimates to ensure consistency with project requirements and client preferences
- Confirm that all calculations are accurate
Step 4: Create a Table of Contents
- Develop a table of contents to provide a quick overview of the proposal sections
- Include page numbers and hyperlinks for digital documents
Step 5: Review Proposal for Completeness
- Conduct a final review of the compiled proposal documents for accuracy and completeness
- Verify that all necessary materials such as sample images or product brochures are included
Step 6: Obtain Internal Approval
- Submit the compiled proposal to relevant stakeholders or supervisors for final approval
- Address any additional comments or changes
Step 7: Save and Secure Proposal Documents
- Save the proposal documents in a secure location such as a project management system or cloud storage
- Ensure that only authorized personnel have access
Schedule follow-up meeting with client to present detailed proposal
Step 1: Propose Meeting Times
- Contact the client to propose multiple date and time options for the follow-up meeting
- Ensure that the proposed times align with your teams availability
Step 2: Confirm Meeting Details
- Confirm the meeting date time and location (or virtual link) with the client
- Send a calendar invite and email confirmation with meeting details
Step 3: Prepare Presentation Materials
- Prepare copies of the detailed proposal and any supporting documents
- Create a brief presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Room or Virtual Meeting
- If meeting in person ensure the meeting room is reserved and set up with necessary equipment
- For virtual meetings test the video conferencing software in advance
Step 5: Assign Presentation Roles
- Assign roles for the meeting such as who will present each section of the proposal and who will address specific questions
- Brief your team on the clients key concerns
Present detailed project proposal to client
Step 1: Start with Introductions
- Introduce yourself and any other team members present at the meeting
- Briefly restate the purpose of the meeting and outline the agenda
Step 2: Present Key Proposal Sections
- Present key sections of the detailed proposal such as the project scope budget timeline and client-specific requirements
- Use clear visuals or charts to aid understanding
Step 3: Explain Cost Estimates
- Break down the cost estimates for each section of the proposal
- Highlight any major cost items or unique pricing considerations
Step 4: Discuss Potential Adjustments
- Open the floor for discussion on potential adjustments or additional client requests
- Take detailed notes on the clients feedback
Step 5: Address Client Questions
- Allow the client to ask questions at the end of each section
- Provide clear and concise answers to address their concerns
Step 6: Summarize Key Takeaways
- Finalize the negotiation by confirming agreed changes to contract terms
- Document the agreed terms and set a timeline for contract finalization
Negotiate contract terms, including scope of work, payment schedule, and any contingencies
Step 1: Review Proposal Terms Internally
- Meet with your internal team to review the proposed contract terms including scope pricing and timeline
- Identify key areas for negotiation flexibility
Step 2: Schedule Negotiation Meeting
- Schedule a negotiation meeting with the client offering a range of date and time options
- Confirm the meeting details and agenda with the client in advance
Step 3: Prepare Negotiation Strategy
- Develop a negotiation strategy focusing on client priorities and potential compromises
- Outline acceptable negotiation limits for each key term
Step 4: Start Negotiation with Key Terms
- Begin the negotiation by reviewing key contract terms such as scope and pricing
- Highlight any areas where changes are not feasible due to project constraints
Step 5: Discuss Clients Counterproposals
- Allow the client to present their counterproposals or requests for changes
- Take notes on their feedback and document areas of agreement
Step 6: Reach Agreement on Contract Terms
- Confirm that the client feels satisfied and comfortable with moving forward
Step 7: Review Final Contract Internally
Address any final questions or concerns from the client
Step 1: Schedule a Final Review Meeting
- Schedule a meeting or call with the client to review any remaining questions or concerns
- Confirm the meeting details and agenda with the client
Step 2: Open the Discussion for Questions
- Invite the client to express any final questions or concerns
Step 3: Provide Clear and Concise Answers
- Address each question or concern individually
- Use clear language and avoid technical jargon where possible
Step 4: Reiterate Key Project Details
- Highlight key project details such as scope timeline and budget to reassure the client
Step 5: Document Client Concerns
- Record the clients final questions and any decisions made in your project management system
Step 6: Confirm Clients Satisfaction
- Send a finalized version of the contract to the client for their review before the signing meeting
Finalize contract terms and prepare contract documents
Step 1: Review Agreed Contract Terms
- Confirm that all previously agreed-upon contract terms including scope pricing and timeline are accurate
Step 2: Prepare Contract Documents
- Draft the contract documents using a standardized template ensuring that all terms are included
Step 3: Include Relevant Attachments
- Attach supporting documents like project plans payment schedules and any special conditions
Step 4: Conduct Internal Review of Contract
- Hold an internal review meeting to verify that all contract terms and attachments are accurate
Step 5: Make Edits Based on Feedback
- Make necessary edits to the contract documents based on feedback from the internal review
Step 6: Prepare Contract for Client Review
- Take detailed notes on any requested changes for later updates to the contract
Step 7: Verify Clients Understanding
Review contract documents with client, ensuring all terms are clear
Step 1: Schedule Contract Review Meeting
- Schedule a meeting with the client to review the contract documents
Step 2: Present the Contract in Sections
- Review each section of the contract with the client focusing on key terms like scope pricing and timeline
- Pause after each section to allow the client to ask questions
Step 3: Explain Key Contract Clauses
- Clearly explain important clauses such as payment terms and warranty conditions
- Use simple language to clarify any complex legal terms
Step 4: Address Client Questions
- Allow the client to ask questions about any section of the contract
Step 5: Confirm Client Understanding
- Ask the client to confirm that they understand and are comfortable with the contract terms
Step 6: Note Any Requested Changes
- Prepare copies of the signed contract for both the client and the companys records
Obtain client signatures on contract documents
Step 1: Review Final Changes with Client
- Review any final changes or adjustments made to the contract with the client
Step 2: Prepare Signature Pages
- Prepare signature pages for the contract verifying all documents are included
Step 3: Obtain Clients Digital or Physical Signature
- Meet with the client to obtain their signature on all necessary pages
Step 4: Verify Signatures from Company Representatives
- Verify that all designated company representatives have signed the contract
Step 5: Confirm Completion of Contract Signing
- Confirm with the client that the signing process is complete
Step 6: Prepare Copies for All Parties
Provide client with a copy of the signed contract
Step 1: Prepare Client Copy of Contract
- Prepare a digital or printed copy of the fully signed contract for the client
Step 2: Review Client Copy for Accuracy
- Review the client copy to confirm all signatures and terms are accurate
Step 3: Send Contract to Client
- Send the signed contract to the client via their preferred method such as email or postal mail
Step 4: Confirm Client Receipt
- Follow up with the client to confirm they have received the signed contract
Step 5: Address Any Final Client Concerns
- Address any remaining questions the client may have about the signed contract
Record signed contract and update project status in CRM
Step 1: Scan and Upload Signed Contract
- Scan the signed contract and save a digital copy in your CRM or project management system
Step 2: Update Project Status in CRM
- Update the project status in your CRM to reflect that the contract has been signed
Step 3: Record Contract Details
- Record key contract details such as contract number client contact and key dates
Step 4: Notify Team of Contract Completion
- Notify relevant team members that the contract has been signed and recorded
Step 5: Archive Physical Copy of Contract
- Archive a physical copy of the signed contract in a secure location
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.