Sales Workflow
Make initial contact with potential client (phone call or email)
Step 1: Gather Client Information
-
Obtain the client's name contact information (phone number and email) and initial project details Confirm the source of the lead and record any pertinent referral details in the CRM
Step 2: Prepare Introduction
-
Draft a professional and friendly script or email template to introduce yourself and your company highlighting key services related to residential roof replacement
-
Ensure the message sets expectations for the initial communication
Step 3: Verify Contact Method
-
Check whether the client has a preferred contact method (phone call text or email) and adjust your communication approach accordingly
-
Make note of the client's preferred contact time if mentioned
Step 4: Make Contact
-
Call or email the client using the prepared script or template Confirm that the client is interested in proceeding with an initial consultation or discovery meeting If leaving a voicemail state your name company and reason for calling clearly
Step 5: Schedule Follow-Up
-
If the client does not respond within 48 hours plan to follow up with another call or email
-
For follow-up use a slightly revised script or message expressing a willingness to answer any questions they might have
Step 6: Record Contact Outcome
-
Update your CRM with the details of the attempted contact including the time date and method used
-
Make a note of any specific requests or concerns expressed by the client during the conversation
Step 7: Send Confirmation
-
If the client confirms interest send an email summarizing the conversation including any agreed follow-up actions and the next steps for the project
Schedule discovery meeting
Step 1: Propose Meeting Times
-
Contact the GC via phone or email to suggest three potential dates and times for the meeting.
-
Ensure the proposed times are within normal business hours.
Step 2: Confirm Availability
-
Wait for the GC's response and confirm a mutually convenient time.
-
If the initial suggestions don't work propose alternative dates.
Step 3: Send Confirmation
-
Send a calendar invitation to the GC with the confirmed date time and location (or virtual meeting link).
-
Include a brief agenda outlining the purpose of the meeting.
Step 4: Prepare Agenda
-
Draft an agenda covering key discussion points such as project scope budget timeline and any specific requirements from the GC.
-
Share the agenda with the GC ahead of the meeting.
Step 5: Gather Necessary Documents
-
Collect any relevant materials or documents needed for the meeting (e.g. brochures past project examples note-taking tools).
Step 6: Prepare Internal Team
-
Inform any team members who need to attend the meeting.
-
Brief them on their roles and the key points to discuss.
Step 7: Confirm Meeting Details
-
Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes.
-
Ensure that the meeting room (if in-person) or virtual meeting setup is ready.
Step 8: Record in CRM
-
Update your CRM with the scheduled meeting details and any relevant notes.
-
Set reminders for the team members involved.
Conduct client discovery meeting
Step 1: Prepare for the Meeting
-
Review any preliminary information gathered about the client’s project requirements
-
Bring any necessary forms checklists or documents to the meeting
Step 2: Start the Meeting
-
Introduce yourself and any team members present
-
Explain the purpose and structure of the meeting
Step 3: Gather Information
-
Ask targeted questions to understand the client's needs preferences and project scope
-
Take detailed notes throughout the meeting
Step 4: Address Client Questions
-
Allow the client to ask any questions they have regarding the project timeline materials or budget
-
Provide clear concise answers and take note of any special requests
Step 5: Conclude the Meeting
-
Summarize the key points discussed and the next steps
-
Thank the client for their time and express enthusiasm for the project
Step 6: Document Meeting
-
Record meeting notes in your CRM and share them with relevant team members
-
Assign follow-up tasks as needed to address any questions or action items identified during the meeting
Step 7: Send Meeting Summary
-
Send an email to the client summarizing the meeting discussion and agreed next steps
-
Include any requested documents or additional information
Qualify client based on project scope, budget, and timeline
Step 1: Review Client Information from Discovery Meeting
-
Review the client’s information recorded during the discovery meeting
-
Focus on the project scope, budget, and timeline details provided by the client
Step 2: Assess Project Alignment with Company Capabilities
-
Evaluate whether the client’s project aligns with your company’s capabilities, resources, and experience
-
Consider whether your company can realistically meet the client’s requirements
Step 3: Determine Financial Feasibility
-
Assess the client’s estimated budget against the projected costs for the project
-
Identify any gaps or areas of concern related to financial feasibility
Step 4: Evaluate Timeline Requirements
-
Determine if the client’s preferred timeline aligns with your company’s current workload and availability
-
Consider potential scheduling conflicts or resource constraints
Step 5: Identify Potential Risks
-
Identify any potential risks associated with the client’s project, such as budget limitations, tight timelines, or complex requirements
-
Document these risks for future reference
Step 6: Decide Whether to Proceed or Decline
-
Based on the information gathered, decide whether to proceed with the client or decline the opportunity
-
If declining, prepare a courteous explanation for the client
Step 7: Communicate Decision to Client
-
If proceeding, communicate the decision to the client and outline the next steps
-
If declining, thank the client for their interest and provide a clear explanation
Record client information and project details in CRM
Step 1: Access CRM System
-
Log into your company's CRM system using your authorized credentials
Step 2: Create New Client Record
-
Navigate to the section for creating a new client record
-
Select the appropriate project type Roof Replacement – Residential
Step 3: Input Project Details
-
Enter the client’s basic information including name contact details and project scope
-
Include additional notes gathered during initial contact or the discovery meeting
Step 4: Review and Verify Information
-
Double-check all entered information for accuracy
-
Cross-reference with any physical documents or email confirmations from the client
Step 5: Save and Update Status
-
Save the client and project records in the CRM
-
Update the project status to In Progress or a similar status based on company policies
Step 6: Notify Team Members
-
Inform relevant team members that the client information is now available in the CRM
-
Assign any necessary follow-up tasks or schedule internal meetings if needed
Step 7: Regularly Update CRM
-
Set up reminders to regularly update the CRM with new client communications and project progress
-
Ensure that all team members have access to the most recent information
Schedule storm damage assessment with the client
Step 1: Review Client Information and Recent Storm Events
-
Review the client’s information and any relevant details about recent storm events in their area
-
Confirm that the client’s contact information and property details are up-to-date
Step 2: Contact Client to Discuss Assessment Needs
-
Contact the client via their preferred communication method (phone, email, etc.) to discuss their need for a storm damage assessment
-
Briefly explain the purpose and benefits of the assessment
Step 3: Confirm Client’s Availability for Assessment
-
Confirm the client’s availability for scheduling the storm damage assessment, offering flexible date and time options
-
Take note of any specific concerns or areas the client wants assessed
Step 4: Set a Date and Time for the Assessment
-
Set a date and time for the storm damage assessment based on the client’s availability and urgency of the situation
-
Confirm that the scheduled time aligns with your team’s calendar
Step 5: Send Confirmation Details to Client
-
Send a confirmation message to the client with the agreed-upon date and time, including any necessary preparation instructions
-
Provide contact information for rescheduling or questions
Step 6: Assign Team Members for the Assessment
-
Assign the appropriate team members to conduct the storm damage assessment, based on their expertise and availability
-
Confirm that all team members are aware of their roles
Step 7: Document Assessment Schedule in CRM
-
Document the assessment schedule and client details in the CRM, noting the date, time, assigned team members, and any specific client requests
-
Set reminders for the assessment team
Conduct storm damage assessment to evaluate damage and restoration needs
Step 1: Arrive On-Site and Introduce the Assessment Team
-
Arrive on-site at the scheduled time and introduce the assessment team to the client
-
Establish a professional and friendly tone, explaining the purpose of the assessment
Step 2: Review the Scope of the Assessment with the Client
-
Review the scope of the storm damage assessment with the client, including key areas to inspect and evaluate
-
Confirm that the client is aware of the process and timeline
Step 3: Conduct a Thorough Visual Inspection
-
Conduct a thorough visual inspection of the exterior and interior areas affected by the storm
-
Look for signs of damage such as missing shingles, leaks, structural issues, and water intrusion
Step 4: Evaluate Structural Integrity and Safety Hazards
-
Evaluate the structural integrity of the affected areas and identify any potential safety hazards
-
Use appropriate tools and techniques to assess the extent of the damage
Step 5: Check for Hidden Damage or Secondary Issues
-
Check for hidden damage or secondary issues such as mold, weakened support beams, or compromised insulation
-
Document any findings that require further inspection
Step 6: Communicate Findings to the Client
-
Communicate your findings to the client, explaining the severity and potential impact of the damage
-
Offer preliminary recommendations for repairs or restoration
Step 7: Document Key Observations for Follow-Up Report
-
Document key observations from the assessment in preparation for the follow-up report
-
Take detailed notes and ensure all critical points are recorded
Take detailed notes and photos of the damage
Step 1: Prepare for Documentation During Assessment
-
Prepare for the assessment by ensuring all documentation tools are ready, including cameras, notepads, and digital devices
-
Confirm that the team understands the documentation requirements
Step 2: Take Photos of Visible Damage
-
Take photos of all visible damage, focusing on areas of concern identified during the visual inspection
-
Capture images from multiple angles to provide a comprehensive view
Step 3: Document Measurements and Structural Details
-
Document measurements of damaged areas and record structural details such as material type, location, and condition
-
Use a measuring tape or digital tools to ensure accuracy
Step 4: Record Client Feedback and Observations
-
Record any feedback or observations provided by the client during the assessment
-
Take notes on specific areas the client has expressed concerns about
Step 5: Label and Organize Photos for the Report
-
Label and organize the photos according to the specific areas or types of damage they represent
-
Use consistent naming conventions to make it easy to reference each image in the report
Step 6: Review Notes and Photos for Completeness
-
Review all notes and photos to ensure that no critical information has been missed
-
Confirm that the documentation aligns with the key points discussed during the assessment
Step 7: Save and Back Up All Documentation Files
-
Save and back up all notes, photos, and digital files in the CRM or designated project management system
-
Confirm that the files are secure and accessible for report preparation
Discuss client needs, preferences, and expectations during assessment
Step 1: Engage the Client in a Detailed Conversation
-
Engage the client in a detailed conversation about their needs, preferences, and expectations for the storm damage repairs
-
Ask open-ended questions to encourage the client to share their concerns
Step 2: Clarify Client’s Priorities and Specific Requirements
-
Clarify the client’s priorities and specific requirements for the repair work, such as material choices, timeline constraints, or budget considerations
-
Take notes to document these preferences
Step 3: Address Client Concerns About Damage Severity
-
Address any client concerns about the severity of the damage and its impact on their property
-
Provide clear and accurate information to help the client understand the situation
Step 4: Discuss Repair Options and Potential Solutions
-
Discuss potential repair options and solutions with the client, outlining the pros and cons of each approach
-
Offer recommendations based on the client’s needs and your assessment findings
Step 5: Set Realistic Expectations for the Repair Timeline
-
Set realistic expectations with the client regarding the repair timeline and potential disruptions
-
Confirm that the client understands the steps involved in the restoration process
Step 6: Take Notes on Client’s Preferred Communication Method
-
Take notes on the client’s preferred communication method for receiving updates and information throughout the repair process
-
Confirm that the client is comfortable with the planned communication approach
Step 7: Document Key Points and Client Preferences in CRM
-
Document all key points and client preferences in the CRM for future reference
-
Ensure that the information is accessible to all relevant team members
Answer any initial questions from the client
Step 1: Open the Floor for Questions
-
Invite the client to ask any initial questions they may have after the inspection Encourage them to express any specific concerns about the project
Step 2: Provide Clear Responses
-
Answer each question thoroughly and ensure the client understands your responses Avoid technical jargon and use simple language when possible
Step 3: Take Notes on Client Concerns
-
Record any additional concerns raised by the client that were not previously identified
-
Add these to the project file for future reference
Step 4: Confirm Understanding
-
Ask the client if they have any remaining questions or if they need clarification on any points Reiterate key takeaways from the discussion
Step 5: Follow-Up with Written Summary
-
Send a brief written summary of the Q&A session to the client
-
Include links to any resources or documents that may help answer further questions
Step 6: Verify Client Satisfaction
-
Ask the client if they feel comfortable with the information provided and address any last-minute concerns
-
Confirm next steps with the client
Step 7: Update Client File
-
Update the client’s file with notes from the Q&A session and any follow-up actions required
Prepare preliminary project proposal based on initial consultation and insurance requirements
Step 1: Review Client Consultation Notes and Documentation
-
Review the notes and documentation from the initial consultation, including client needs, project scope, and any specific insurance requirements
-
Confirm that all key information is complete and accurately recorded
Step 2: Gather Relevant Project Data and Insurance Guidelines
-
Gather all relevant project data, such as inspection reports, photos, and client-provided documents
-
Review insurance guidelines to confirm any restrictions, coverage limits, or approval requirements
Step 3: Outline the Preliminary Scope of Work
-
Outline the preliminary scope of work based on the client’s needs and the findings from the damage assessment
-
Break down the key tasks and activities required for the project
Step 4: Align Proposal with Insurance Requirements
-
Align the preliminary project proposal with the insurance requirements, ensuring that all covered items and repair standards are addressed
-
Include any necessary justifications or explanations for insurance claims
Step 5: Create an Initial Project Overview and Timeline
-
Create an initial project overview, including a rough timeline for key activities and milestones
-
Confirm that the proposed timeline aligns with the client’s expectations and urgency
Step 6: Draft the Preliminary Project Proposal Document
-
Draft the preliminary project proposal document, including an introduction, project scope, timeline, and insurance-related considerations
-
Ensure that the document is clear, concise, and professionally formatted
Step 7: Review and Finalize the Draft Proposal
-
Review the draft proposal for accuracy and completeness, making any necessary revisions
-
Confirm that the document aligns with internal standards and client requirements
Develop rough estimate of project costs and timeline
Step 1: Gather Initial Project Information
-
Review all initial project information including scope GC requirements and any preliminary notes from consultations.
-
Ensure you have a clear understanding of the project's main components and objectives.
Step 2: Identify Key Project Components
-
Break down the project into key components and tasks.
-
List all major activities materials and resources required for the project.
Step 3: Research Costs for Materials and Labor
-
Collect up-to-date cost data for all materials needed for the project.
-
Consult with suppliers and subcontractors to get current pricing for labor and services.
Step 4: Estimate Labor Costs
-
Calculate the labor costs based on the number of hours required for each task and the hourly rates of your team members.
-
Include any additional labor-related expenses such as overtime or specialized skills.
Step 5: Estimate Material Costs
-
Sum the costs of all materials required for the project.
-
Include potential contingencies for price fluctuations or unforeseen material needs.
Step 6: Calculate Equipment and Overhead Costs
-
Estimate the costs for any equipment rental or usage required for the project.
-
Include overhead costs such as project management administrative expenses and utilities.
Step 7: Develop Preliminary Timeline
-
Outline a rough timeline for the project identifying key milestones and deadlines.
-
Estimate the duration of each task and ensure the timeline aligns with GC expectations.
Step 8: Consider Potential Risks and Contingencies
-
Identify potential risks that could impact project costs or timelines.
-
Include contingency amounts in your cost estimate to account for these uncertainties.
Step 9: Compile the Rough Estimate
-
Combine all cost components (labor materials equipment overhead) into a total project cost estimate.
-
Ensure the estimate is presented clearly with all assumptions and contingencies noted.
Step 10: Review and Validate the Estimate
-
Review the rough estimate with key team members to validate accuracy and completeness.
-
Make any necessary adjustments based on feedback and additional information.
Review preliminary proposal with internal team for accuracy
Step 1: Schedule Review Meeting
-
Organize a meeting with key team members involved in the project.
-
Ensure all relevant participants are available and informed about the purpose of the meeting.
Step 2: Distribute Proposal in Advance
-
Send the preliminary proposal to all team members ahead of the meeting.
-
Allow sufficient time for them to review the document individually.
Step 3: Prepare for the Meeting
-
Highlight key sections of the proposal that require particular attention.
-
Prepare any supporting documents or data that may be needed during the review.
Step 4: Conduct the Review Meeting
-
Begin the meeting by outlining the agenda and goals.
-
Go through the proposal section by section checking for accuracy in project scope cost estimates timelines and deliverables.
Step 5: Identify Errors and Omissions
-
Encourage team members to point out any inaccuracies missing information or inconsistencies.
-
Take detailed notes on all identified issues for correction.
Step 6: Gather Feedback
-
Collect feedback on the proposal's clarity comprehensiveness and alignment with project goals.
-
Note any suggestions for improvement or additional information needed.
Step 7: Assign Corrections
-
Delegate specific tasks for correcting identified issues to appropriate team members.
-
Set deadlines for making the necessary revisions.
Schedule meeting with client to present preliminary proposal
Step 1: Confirm Client’s Availability
-
Contact the client to confirm their availability for a proposal presentation meeting offering multiple date and time options
Step 2: Send Meeting Confirmation
-
Send a confirmation email to the client including the agreed date time and meeting agenda
Step 3: Prepare Meeting Materials
-
Organize and print copies of the preliminary proposal and any supporting documents
-
Prepare a presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Location
-
Confirm the meeting location or virtual meeting setup
-
Test any necessary equipment or presentation software in advance
Step 5: Review Proposal with Internal Team
-
Hold a brief internal meeting to review key points of the proposal and client expectations
-
Assign roles for the meeting such as who will present and who will address specific questions
Step 6: Communicate Meeting Details to Client
-
Send a reminder email to the client a day before the meeting
-
Include any pre-meeting instructions or documents the client should review
Step 7: Update Project Management System
-
Record the scheduled meeting details in the project management system and assign follow-up tasks if necessary
Present preliminary project proposal to client
Step 1: Start with a Brief Introduction
-
Introduce yourself and any team members present at the meeting
-
Briefly explain the purpose of the meeting and the agenda
Step 2: Outline Key Sections of the Proposal
-
Present key sections of the proposal such as project scope timeline and estimated costs
-
Use clear language and avoid technical jargon where possible
Step 3: Highlight Unique Client Requirements
-
Emphasize sections of the proposal that reflect the client’s unique requirements or preferences
-
Offer explanations or context for key decisions in the proposal
Step 4: Address Client Questions
-
Allow the client to ask questions after each section of the presentation
-
Take notes on any areas of concern or additional requests
Step 5: Discuss Potential Adjustments
-
Discuss potential adjustments to the proposal based on the client’s feedback
-
Offer alternative solutions or approaches where needed
Step 6: Confirm Next Steps
-
Confirm the next steps with the client including any follow-up meetings or proposal revisions
-
Set a tentative timeline for finalizing the proposal
Step 7: Document Meeting Outcome
-
Record the outcome of the meeting in your project management system
-
Include key points of discussion client feedback and agreed next steps
Discuss project scope, budget, and timeline in detail
Step 1: Review Proposal and Key Discussion Points with the Team
-
Review the project proposal and key discussion points with the internal team before meeting with the client
-
Confirm that all team members are prepared to address specific aspects of the scope, budget, and timeline
Step 2: Schedule and Confirm a Client Meeting
-
Schedule a meeting with the client to discuss the project scope, budget, and timeline in detail
-
Confirm the date, time, and location with the client, and send a calendar invitation
Step 3: Begin the Meeting with Introductions and Agenda Review
-
Begin the meeting with introductions, and review the meeting agenda with the client
-
Establish a professional tone and set clear expectations for the discussion
Step 4: Present the Detailed Project Scope
-
Present the detailed project scope to the client, highlighting the key deliverables, milestones, and critical activities
-
Use visuals or diagrams if needed to illustrate key aspects
Step 5: Discuss the Preliminary Budget and Cost Breakdown
-
Discuss the preliminary budget and provide a breakdown of key costs, including labor, materials, and any additional expenses
-
Emphasize any cost-saving measures or options available
Step 6: Review and Explain the Proposed Timeline
-
Review and explain the proposed timeline, including key milestones and expected completion dates
-
Address any potential scheduling conflicts or risks identified during planning
Step 7: Encourage Client to Ask Questions and Provide Feedback
-
Encourage the client to ask questions or provide feedback about the project scope, budget, or timeline
-
Take notes on any client concerns or requests for adjustments
Gather feedback from client and address any concerns or questions
Step 1: Listen Actively to Client Feedback
-
Listen actively to the client’s feedback, noting their concerns, preferences, and questions
-
Show empathy and understanding for their perspective
Step 2: Clarify and Address Any Specific Client Concerns
-
Clarify and address any specific concerns raised by the client regarding the scope, budget, or timeline
-
Provide detailed explanations or solutions as needed
Step 3: Discuss Potential Adjustments with Client
-
Discuss potential adjustments to the proposal based on the client’s feedback
-
Offer options or alternatives that align with the client’s goals and constraints
Step 4: Confirm Client’s Priorities and Preferences
-
Confirm the client’s priorities and preferences for the project, such as specific materials, features, or completion deadlines
-
Take detailed notes to ensure accurate adjustments
Step 5: Reiterate Next Steps for Refining the Proposal
-
Reiterate the next steps for refining the proposal, explaining any actions you will take to address the client’s feedback
-
Confirm the timeline for presenting the revised proposal
Step 6: Thank the Client for Their Input
-
Thank the client for their input and reassure them that their feedback is valued
-
Confirm that all concerns and questions have been addressed to their satisfaction
Step 7: Document Client Feedback and Adjustments in CRM
-
Document the client’s feedback and any agreed-upon adjustments in the CRM
-
Update the project status to reflect the feedback and revision phase
Make adjustments to the proposal as needed based on client feedback
Step 1: Review Client Feedback and Meeting Notes
-
Review the client’s feedback and meeting notes, focusing on the key adjustments requested
-
Confirm that all client concerns and preferences are clearly understood
Step 2: Identify Specific Changes to Project Scope or Details
-
Identify specific changes needed to the project scope, budget, timeline, or other proposal details
-
Determine how these changes impact the overall project plan
Step 3: Revise Project Scope and Key Deliverables
-
Revise the project scope and key deliverables based on the client’s feedback
-
Ensure that the revised scope aligns with the client’s expectations and priorities
Step 4: Update Budget and Cost Estimates
-
Update the budget and cost estimates to reflect any changes made to the project scope, materials, or labor requirements
-
Confirm that the revised estimates remain within the client’s budget constraints
Step 5: Adjust Project Timeline and Milestones
-
Adjust the project timeline and milestones as needed to accommodate any changes in scope or resources
-
Communicate any scheduling changes to the project team
Step 6: Review the Revised Proposal for Accuracy
-
Review the revised proposal for accuracy and completeness, ensuring that all changes are correctly implemented
-
Double-check calculations and timelines to avoid discrepancies
Step 7: Prepare the Revised Proposal Document
-
Prepare the revised proposal document, clearly highlighting the changes made based on the client’s feedback
-
Include a summary of adjustments for easy reference
Refine project proposal based on client feedback
Step 1: Evaluate Client Feedback
-
Assess the feedback received during client discussions
-
Identify key areas where refinement is needed
Step 2: Make Revisions to Key Sections
-
Update key sections such as project scope budget and timeline based on the feedback
-
Ensure that changes are aligned with client expectations
Step 3: Recalculate Costs and Timeline
-
Recalculate the budget and timeline if changes impact project costs or duration
-
Highlight any major deviations from the original proposal
Step 4: Review the Refined Proposal with Stakeholders
-
Conduct an internal review with stakeholders to verify that all feedback has been addressed
-
Make final adjustments as needed
Step 5: Communicate Changes to the Client
-
Summarize the refinements made to the proposal in a follow-up meeting or email
-
Highlight key changes and their implications
Step 6: Confirm Client Satisfaction
-
Ask for final confirmation or approval from the client on the refined proposal
-
Address any last-minute concerns or questions
Step 7: Finalize and Save the Refined Proposal
-
Save the refined proposal in the project management system
-
Share the updated version with the client and internal team
Develop detailed project estimate, including labor, materials, and other costs
Step 1: Review Client Requirements and Scope
-
Review the client’s requirements and project scope based on the information gathered during the discovery meeting and inspection
-
Confirm any specific client preferences or constraints
Step 2: Assess Labor Requirements
-
Determine the labor required to complete the project, considering the scope and complexity
-
Estimate the number of hours needed and the types of workers involved
Step 3: Calculate Material Costs
-
Identify all materials required for the project, including roofing materials, underlayment, flashing, and safety equipment
-
Obtain current pricing from suppliers or the company’s material database
Step 4: Include Additional Costs
-
Account for additional costs such as permits, equipment rentals, disposal fees, and travel expenses
-
Consider contingencies for unforeseen expenses
Step 5: Create a Detailed Cost Breakdown
-
Create a detailed breakdown of all estimated costs, including labor, materials, and additional expenses
-
Separate costs by categories for clarity and transparency
Step 6: Review and Adjust the Estimate
-
Review the detailed estimate for accuracy and completeness
-
Adjust the estimate based on current rates, potential discounts, or negotiated prices
Step 7: Document the Estimate in the Proposal
-
Document the final estimate in the proposal, including the breakdown of costs
-
Ensure that the estimate aligns with the client’s budget and expectations
Create a comprehensive project timeline
Step 1: Review Project Scope and Requirements
-
Examine the project scope deliverables and GC requirements.
-
Ensure you have a clear understanding of all tasks and milestones.
Step 2: Identify Key Phases and Milestones
-
Break the project into key phases and milestones.
-
List all significant events deliverables and deadlines.
Step 3: Define Tasks and Dependencies
-
Detail all tasks required to complete each phase.
-
Identify dependencies between tasks and determine the sequence of activities.
Step 4: Estimate Task Durations
-
Estimate the time required to complete each task.
-
Use past project data and team input to ensure accuracy.
Step 5: Allocate Resources
-
Assign team members subcontractors and equipment to each task.
-
Ensure resources are available and properly allocated.
Step 6: Develop Timeline Draft
-
Create a draft timeline using project management software or tools.
-
Plot tasks durations and dependencies to visualize the project flow.
Step 7: Review and Adjust
-
Share the draft timeline with the project team for feedback.
-
Adjust the timeline based on input and resolve any scheduling conflicts.
Step 8: Incorporate Buffer Time
-
Add buffer time to account for potential delays or unforeseen issues.
-
Ensure the timeline remains realistic and achievable.
Step 9: Finalize the Timeline
-
Review the finalized timeline with key stakeholders.
-
Ensure all parties agree on the schedule and responsibilities.
Step 10: Document and Share
-
Document the comprehensive project timeline in a clear and accessible format.
-
Distribute the timeline to the GC and all relevant team members.
Compile all proposal documents, including scope of work, estimate, timeline, and terms and conditions
Step 1: Gather Key Proposal Documents
-
Collect all necessary documents including cost estimates project plans material lists and client correspondence
-
Ensure that each document is up-to-date and approved
Step 2: Organize Documents by Sections
-
Organize the proposal into clear sections such as project overview budget breakdown timeline and client-specific requirements
-
Label each section for easy navigation
Step 3: Review and Verify Cost Estimates
-
Cross-check cost estimates to ensure consistency with project requirements and client preferences
-
Confirm that all calculations are accurate
Step 4: Create a Table of Contents
-
Develop a table of contents to provide a quick overview of the proposal sections
-
Include page numbers and hyperlinks for digital documents
Step 5: Review Proposal for Completeness
-
Conduct a final review of the compiled proposal documents for accuracy and completeness
-
Verify that all necessary materials such as sample images or product brochures are included
Step 6: Obtain Internal Approval
-
Submit the compiled proposal to relevant stakeholders or supervisors for final approval
-
Address any additional comments or changes
Step 7: Save and Secure Proposal Documents
-
Save the proposal documents in a secure location such as a project management system or cloud storage
-
Ensure that only authorized personnel have access
Schedule follow-up meeting with client to present detailed proposal
Step 1: Propose Meeting Times
-
Contact the client to propose multiple date and time options for the follow-up meeting
-
Ensure that the proposed times align with your team’s availability
Step 2: Confirm Meeting Details
-
Confirm the meeting date time and location (or virtual link) with the client
-
Send a calendar invite and email confirmation with meeting details
Step 3: Prepare Presentation Materials
-
Prepare copies of the detailed proposal and any supporting documents
-
Create a brief presentation outline to guide the discussion with the client
Step 4: Set Up Meeting Room or Virtual Meeting
-
If meeting in person ensure the meeting room is reserved and set up with necessary equipment
-
For virtual meetings test the video conferencing software in advance
Step 5: Assign Presentation Roles
-
Assign roles for the meeting such as who will present each section of the proposal and who will address specific questions
-
Brief your team on the client’s key concerns
Present detailed project proposal to client
Step 1: Start with Introductions
-
Introduce yourself and any other team members present at the meeting
-
Briefly restate the purpose of the meeting and outline the agenda
Step 2: Present Key Proposal Sections
-
Present key sections of the detailed proposal such as the project scope budget timeline and client-specific requirements
-
Use clear visuals or charts to aid understanding
Step 3: Explain Cost Estimates
-
Break down the cost estimates for each section of the proposal
-
Highlight any major cost items or unique pricing considerations
Step 4: Discuss Potential Adjustments
-
Open the floor for discussion on potential adjustments or additional client requests
-
Take detailed notes on the client’s feedback
Step 5: Address Client Questions
-
Allow the client to ask questions at the end of each section
-
Provide clear and concise answers to address their concerns
Step 6: Summarize Key Takeaways
-
Recap the main points of the proposal and any agreed-upon changes
-
Confirm the next steps and follow-up actions with the client
Negotiate contract terms, including scope of work, payment schedule, and any contingencies
Step 1: Review Proposal Terms Internally
-
Meet with your internal team to review the proposed contract terms including scope pricing and timeline
-
Identify key areas for negotiation flexibility
Step 2: Schedule Negotiation Meeting
-
Schedule a negotiation meeting with the client offering a range of date and time options
-
Confirm the meeting details and agenda with the client in advance
Step 3: Prepare Negotiation Strategy
-
Develop a negotiation strategy focusing on client priorities and potential compromises
-
Outline acceptable negotiation limits for each key term
Step 4: Start Negotiation with Key Terms
-
Begin the negotiation by reviewing key contract terms such as scope and pricing
-
Highlight any areas where changes are not feasible due to project constraints
Step 5: Discuss Client’s Counterproposals
-
Allow the client to present their counterproposals or requests for changes
-
Take notes on their feedback and document areas of agreement
Step 6: Reach Agreement on Contract Terms
-
Finalize the negotiation by confirming agreed changes to contract terms
-
Document the agreed terms and set a timeline for contract finalization
Step 7: Review Final Contract Internally
-
Conduct a final review of the revised contract with your internal team
-
Confirm that all agreed changes have been accurately incorporated
Address any final questions or concerns from the client
Step 1: Schedule a Final Review Meeting
-
Schedule a meeting or call with the client to review any remaining questions or concerns
-
Confirm the meeting details and agenda with the client
Step 2: Open the Discussion for Questions
-
Invite the client to express any final questions or concerns
Step 3: Provide Clear and Concise Answers
-
Address each question or concern individually
-
Use clear language and avoid technical jargon where possible
Step 4: Reiterate Key Project Details
-
Highlight key project details such as scope timeline and budget to reassure the client
Step 5: Document Client Concerns
-
Record the client’s final questions and any decisions made in your project management system
Step 6: Confirm Client’s Satisfaction
-
Confirm that the client feels satisfied and comfortable with moving forward
Finalize contract terms and prepare contract documents
Step 1: Review Agreed Contract Terms
-
Confirm that all previously agreed-upon contract terms including scope pricing and timeline are accurate
Step 2: Prepare Contract Documents
-
Draft the contract documents using a standardized template ensuring that all terms are included
Step 3: Include Relevant Attachments
-
Attach supporting documents like project plans payment schedules and any special conditions
Step 4: Conduct Internal Review of Contract
-
Hold an internal review meeting to verify that all contract terms and attachments are accurate
Step 5: Make Edits Based on Feedback
-
Make necessary edits to the contract documents based on feedback from the internal review
Step 6: Prepare Contract for Client Review
-
Send a finalized version of the contract to the client for their review before the signing meeting
Step 7: Verify Client’s Understanding
-
Follow up with the client to ensure they understand all terms
Review contract documents with client, ensuring all terms are clear
Step 1: Schedule Contract Review Meeting
-
Schedule a meeting with the client to review the contract documents
Step 2: Present the Contract in Sections
-
Review each section of the contract with the client focusing on key terms like scope pricing and timeline
-
Pause after each section to allow the client to ask questions
Step 3: Explain Key Contract Clauses
-
Clearly explain important clauses such as payment terms and warranty conditions
-
Use simple language to clarify any complex legal terms
Step 4: Address Client Questions
-
Allow the client to ask questions about any section of the contract
Step 5: Confirm Client Understanding
-
Ask the client to confirm that they understand and are comfortable with the contract terms
Step 6: Note Any Requested Changes
-
Take detailed notes on any requested changes for later updates to the contract
Obtain client signatures on contract documents
Step 1: Review Final Changes with Client
-
Review any final changes or adjustments made to the contract with the client
Step 2: Prepare Signature Pages
-
Prepare signature pages for the contract verifying all documents are included
Step 3: Obtain Client’s Digital or Physical Signature
-
Meet with the client to obtain their signature on all necessary pages
Step 4: Verify Signatures from Company Representatives
-
Verify that all designated company representatives have signed the contract
Step 5: Confirm Completion of Contract Signing
-
Confirm with the client that the signing process is complete
Step 6: Prepare Copies for All Parties
-
Prepare copies of the signed contract for both the client and the company’s records
Provide client with a copy of the signed contract
Step 1: Prepare Client Copy of Contract
-
Prepare a digital or printed copy of the fully signed contract for the client
Step 2: Review Client Copy for Accuracy
-
Review the client copy to confirm all signatures and terms are accurate
Step 3: Send Contract to Client
-
Send the signed contract to the client via their preferred method such as email or postal mail
Step 4: Confirm Client Receipt
-
Follow up with the client to confirm they have received the signed contract
Step 5: Address Any Final Client Concerns
-
Address any remaining questions the client may have about the signed contract
Record signed contract and update project status in CRM
Step 1: Scan and Upload Signed Contract
-
Scan the signed contract and save a digital copy in your CRM or project management system
Step 2: Update Project Status in CRM
-
Update the project status in your CRM to reflect that the contract has been signed
Step 3: Record Contract Details
-
Record key contract details such as contract number client contact and key dates
Step 4: Notify Team of Contract Completion
-
Notify relevant team members that the contract has been signed and recorded
Step 5: Archive Physical Copy of Contract
-
Archive a physical copy of the signed contract in a secure location
👈 Use this SOP template inside Subtrak
Edit with AI. Customize in seconds. Store and share all your SOPs and checklists in one place.