Construction Workflow
Welcome to the Construction Workflow SOP Template Library for Storm Damage Restoration (Residential) Roofing. Access free, expertly crafted Standard Operating Procedures to guide your construction phase. Our templates cover every step, from initial setup to final installation, ensuring efficient and high-quality workmanship. Download our templates today to streamline your construction process and achieve outstanding results.
Mobilize roofing crew and set up equipment on site
Step 1: Verify Crew Availability and Schedule
• Verify the availability and schedule of the roofing crew, ensuring that all members are prepared for mobilization
• Confirm that key personnel are aware of their specific responsibilities
Step 2: Review Equipment and Material Requirements
• Review the equipment and material requirements for the roofing crew, ensuring that all necessary items are available on-site
• Conduct a final check of equipment condition and functionality
Step 3: Assign Crew Members to Specific Tasks
• Assign crew members to specific tasks based on their skills and experience
• Confirm that each member understands their assigned responsibilities and timelines
Step 4: Transport Crew and Equipment to Project Site
• Transport the roofing crew and equipment to the project site according to the mobilization plan
• Confirm that all transportation safety protocols are followed
Step 5: Set Up Equipment and Workstations on Site
• Set up equipment and workstations at the project site, ensuring that all items are positioned safely and efficiently
• Confirm that all required tools and materials are accessible to crew members
Step 6: Conduct Equipment Safety Checks on Site
• Conduct equipment safety checks on-site, verifying that all items are properly secured, functional, and compliant with safety standards
• Address any issues immediately
Step 7: Communicate Crew Setup and Readiness to Project Manager
• Communicate the crew’s setup and readiness to the project manager, confirming that all preparations are complete
• Obtain final approval before commencing roofing activities
Conduct site safety briefing with roofing crew
Step 1: Prepare Safety Briefing Agenda and Key Points
• Prepare the safety briefing agenda, focusing on key points such as equipment usage, fall protection, and emergency procedures
• Include updates on any specific site conditions or hazards
Step 2: Gather Roofing Crew for Safety Briefing
• Gather the roofing crew at a designated meeting area on-site for the safety briefing
• Confirm that all crew members are present and attentive
Step 3: Review Key Safety Protocols and Procedures
• Review key safety protocols and procedures with the crew, emphasizing critical tasks such as harness usage, ladder safety, and proper lifting techniques
• Provide clear instructions and visual aids if necessary
Step 4: Discuss Identified Site Hazards and Mitigation Measures
• Discuss identified site hazards and the corresponding mitigation measures with the crew
• Confirm that all members understand the risks and required safety precautions
Step 5: Assign Safety Roles and Responsibilities to Crew Members
• Assign specific safety roles and responsibilities to crew members, such as safety spotters, first aid responders, and equipment inspectors
• Confirm that all members are clear on their roles
Step 6: Conduct Final Check of Safety Equipment
• Conduct a final check of safety equipment, including harnesses, helmets, and protective gear
• Confirm that all items are in good condition and properly fitted
Step 7: Document Safety Briefing and Crew Acknowledgment
• Document the safety briefing, including key points covered and crew acknowledgment of the safety protocols
• Obtain signatures or verbal confirmations as required
Coordinate with any subcontractors on site (if applicable)
Step 1: Confirm Subcontractor Arrival and Scope of Work
• Confirm the arrival of subcontractors on-site and verify that all scheduled subcontractors are present
• Review their assigned scope of work and key deliverables for the day
Step 2: Introduce Subcontractors to Project Manager and Crew
• Introduce subcontractors to the project manager and roofing crew members to establish communication and chain of command
• Provide a brief overview of the day’s planned activities
Step 3: Establish Communication Channels for Coordination
• Establish communication channels between subcontractors and the roofing crew, ensuring that key contact information is exchanged
• Set expectations for regular updates and check-ins throughout the day
Step 4: Verify Subcontractor Safety Compliance
• Verify that all subcontractors comply with site safety protocols, including wearing appropriate personal protective equipment (PPE) and adhering to safety guidelines
• Address any safety concerns immediately
Step 5: Monitor Subcontractor Progress and Performance
• Monitor the progress and performance of subcontractors to ensure that tasks are completed on schedule and according to quality standards
• Provide guidance or support as needed
Step 6: Communicate Key Updates to Project Team
• Communicate key updates from subcontractors to the project team, including progress reports, issues encountered, or changes in scope
• Confirm that all team members are aware of these updates
Step 7: Document Subcontractor Activities and Status
• Document the activities and status of subcontractors in the project records, including work completed, any delays, and subcontractor feedback
• Maintain accurate records for future reference
Verify delivery and inventory of roofing materials
Step 1: Confirm Scheduled Delivery with Supplier
• Confirm the scheduled delivery of roofing materials with the supplier, verifying delivery dates, quantities, and item details
• Address any discrepancies before delivery
Step 2: Prepare Designated Receiving Area for Materials
• Prepare a designated receiving area for roofing materials on-site, ensuring that it is safe, accessible, and clear of debris
• Mark the area to prevent unauthorized access
Step 3: Inspect Delivered Materials for Accuracy and Quality
• Inspect the delivered roofing materials for accuracy and quality, verifying that quantities, specifications, and item conditions match the order
• Report any damaged or missing items immediately
Step 4: Record Delivery Details and Verify with Supplier
• Record the delivery details, including quantities, delivery date, and supplier confirmation
• Verify the delivery with the supplier, obtaining signatures or receipts as required
Step 5: Secure Roofing Materials in Designated Storage Area
• Secure the roofing materials in the designated storage area, ensuring that items are organized and protected from weather or theft
• Implement safety measures to prevent unauthorized access
Step 6: Communicate Delivery Status to Project Team
• Communicate the delivery status to the project team, confirming that all materials are received, inspected, and secured
• Highlight any issues or discrepancies for resolution
Step 7: Document Material Delivery and Inventory in Project Records
• Document the material delivery and inventory in the project records, including receipts, inspection reports, and communication with the supplier
• Update inventory levels as needed
Prepare roof deck for installation (e.g., clean, inspect)
Step 1: Conduct Visual Inspection of Roof Deck
• Conduct a visual inspection of the roof deck to identify any damage, debris, or structural issues that need attention before installation
• Take notes and photos of any identified issues
Step 2: Clear Debris and Clean Roof Deck Surface
• Clear all debris, loose materials, and dirt from the roof deck surface using appropriate cleaning tools and techniques
• Ensure that the deck is thoroughly clean and dry
Step 3: Inspect Roof Deck for Structural Integrity
• Inspect the roof deck for structural integrity, checking for weak spots, cracks, rot, or water damage
• Confirm that the deck can support the weight and installation of roofing materials
Step 4: Repair Minor Decking Issues as Needed
• Repair minor decking issues as needed, such as sealing small cracks or reinforcing weak areas
• Document all repairs performed and the materials used
Step 5: Verify Alignment and Level of Roof Deck
• Verify the alignment and level of the roof deck using appropriate measuring tools
• Address any misalignments or uneven areas before proceeding with installation
Step 6: Conduct Final Check Before Installation
• Conduct a final check of the roof deck to confirm that it is clean, dry, level, and structurally sound
• Communicate any remaining concerns to the project manager
Step 7: Document Roof Deck Preparation in Project Records
• Document the roof deck preparation in the project records, including inspection notes, repair details, and final checks
• Confirm readiness for installation with the project team
Remove existing damaged roofing materials
Step 1: Conduct Initial Inspection of Damaged Roofing
• Conduct an initial inspection of the damaged roofing materials to assess the extent of damage and determine the scope of removal needed
• Take detailed notes and photos for reference
Step 2: Establish Safety Protocols for Removal Work
• Establish safety protocols for the removal work, including the use of fall protection equipment, safety spotters, and material handling guidelines
• Brief the roofing crew on these protocols
Step 3: Identify and Mark Areas for Material Removal
• Identify and mark the specific areas of the roof where damaged materials will be removed
• Use visible markers or tape to indicate sections for removal
Step 4: Remove Damaged Roofing Materials Using Proper Tools
• Remove the damaged roofing materials using appropriate tools and techniques, ensuring that the underlying deck is not damaged during removal
• Work systematically to avoid missing any sections
Step 5: Dispose of Removed Materials in Designated Waste Area
• Dispose of the removed materials in the designated waste area, following disposal protocols and environmental guidelines
• Confirm that the waste area is secure and accessible
Step 6: Inspect Roof Deck After Removal
• Inspect the roof deck after removal of the damaged materials, checking for any remaining debris or hidden damage
• Address any issues identified during the inspection
Step 7: Document Removal Work and Prepare for Next Steps
• Document the removal work in the project records, including photos, material quantities, and crew activities
• Confirm readiness for deck repairs or new material installation
Repair or replace any damaged decking or structural elements
Step 1: Identify Damaged Decking or Structural Elements
• Identify any damaged decking or structural elements that require repair or replacement based on the roof deck inspection
• Confirm the extent of damage and prioritize areas for repair
Step 2: Develop Repair Plan and Allocate Resources
• Develop a repair plan based on the identified damage, including specific tasks, materials, and timelines
• Allocate resources and assign responsibilities to key team members
Step 3: Remove Damaged Decking or Structural Elements
• Remove damaged decking or structural elements carefully, using appropriate tools and techniques to avoid further damage
• Dispose of removed elements according to disposal protocols
Step 4: Install Replacement Decking or Structural Components
• Install replacement decking or structural components, ensuring that new materials match the specifications of the existing structure
• Use proper fastening and sealing methods for a secure fit
Step 5: Inspect Repairs for Quality and Structural Integrity
• Inspect the completed repairs for quality and structural integrity, verifying that all replaced elements are properly secured and aligned
• Confirm that the roof deck is ready for further installation
Step 6: Conduct Final Check of Repair Work
• Conduct a final check of the repair work, addressing any minor adjustments or corrections as needed
• Communicate the repair status to the project manager
Step 7: Document Repairs and Update Project Records
• Document all repairs and replacements in the project records, including photos, materials used, and inspection results
• Confirm that the roof deck is fully prepared for underlayment and roofing material installation
Install roofing underlayment and moisture barrier
Step 1: Prepare Roof Deck for Underlayment Installation
• Verify that the roof deck is clean, dry, and free of debris before beginning the underlayment installation
• Confirm that any structural repairs have been completed
Step 2: Measure and Cut Underlayment Material to Fit
• Measure and cut the underlayment material to fit the roof deck dimensions, ensuring that each section is accurately aligned with the roof edges
• Use straight edges and roofing knives for precise cuts
Step 3: Install Drip Edge Along Roof Perimeter
• Install the drip edge along the roof perimeter to prevent water intrusion and direct runoff into the gutter system
• Confirm that all drip edge sections are securely fastened
Step 4: Begin Installing Underlayment from Bottom Edge
• Begin installing the underlayment from the bottom edge of the roof, overlapping each layer by the recommended amount
• Secure the underlayment with approved roofing nails or staples
Step 5: Overlap Seams and Secure Edges
• Overlap all seams of the underlayment by at least the recommended amount to ensure a watertight barrier
• Secure the edges of each section, paying special attention to valleys and transitions
Step 6: Install Moisture Barrier in Vulnerable Areas
• Install a moisture barrier in vulnerable areas, such as valleys, eaves, and roof penetrations, to provide additional protection against water intrusion
• Use approved sealants where necessary
Step 7: Inspect Underlayment and Moisture Barrier for Gaps or Tears
• Inspect the installed underlayment and moisture barrier for any gaps, tears, or misalignments
• Repair any issues immediately to maintain the integrity of the water barrier
Install roofing materials (e.g., shingles, tiles, metal panels)
Step 1: Prepare Roofing Materials for Installation
• Prepare the roofing materials for installation, ensuring that they are organized and easily accessible on the roof
• Verify that all required materials and fasteners are on-site
Step 2: Begin Installation from the Bottom Edge of the Roof
• Begin installing the roofing materials from the bottom edge of the roof, following the manufacturer’s guidelines for spacing, overlap, and fasteners
• Use chalk lines to ensure straight rows
Step 3: Overlap Roofing Materials to Ensure Proper Water Flow
• Overlap the roofing materials according to the manufacturer’s guidelines to ensure proper water flow and prevent leaks
• Confirm that each section is securely fastened
Step 4: Install Materials in Rows, Moving Upward
• Install the roofing materials in rows, moving upward toward the ridge
• Check alignment periodically to maintain a uniform appearance and fit
Step 5: Secure Roofing Materials with Appropriate Fasteners
• Secure the roofing materials with appropriate fasteners, following the manufacturer’s recommendations for spacing and placement
• Avoid over-tightening or damaging the materials
Step 6: Inspect Installed Roofing Materials for Defects or Misalignment
• Inspect the installed roofing materials for defects, misalignment, or loose sections
• Make any necessary adjustments or repairs immediately
Step 7: Clean Up and Remove Debris After Installation
• Clean up and remove any debris, scrap materials, or excess fasteners from the roof
• Confirm that the work area is clear and safe for further activities
Install flashing and other roof penetrations
Step 1: Identify Locations for Roof Flashing Installation
• Identify the locations for roof flashing installation, focusing on areas where roof surfaces meet, such as valleys, chimneys, skylights, and vents
• Mark these areas for reference
Step 2: Measure and Cut Flashing Materials to Fit
• Measure and cut the flashing materials to fit each specific area, ensuring that each piece extends beyond the vulnerable area for proper coverage
• Use tin snips or specialized cutting tools
Step 3: Install Flashing Around Roof Penetrations
• Install flashing around roof penetrations, such as chimneys, vents, and skylights, securing it with roofing nails and sealing edges with approved sealant
• Ensure a watertight seal around all penetrations
Step 4: Secure Flashing in Valleys and Along Roof Edges
• Secure flashing in valleys and along roof edges to direct water away from critical areas
• Overlap flashing sections as necessary to prevent leaks
Step 5: Install Counterflashing Where Needed
• Install counterflashing over base flashing where needed, such as along chimneys or walls, to provide an additional layer of protection
• Secure counterflashing with fasteners and sealant
Step 6: Inspect Flashing for Proper Fit and Seal
• Inspect all installed flashing for proper fit, alignment, and seal, checking for gaps or loose sections
• Make any necessary adjustments or repairs to ensure a watertight barrier
Step 7: Document Installation of Flashing and Penetrations
• Document the installation of flashing and other roof penetrations in the project records, noting areas completed, materials used, and any challenges encountered
• Confirm that the flashing installation is complete and compliant with project specifications
Conduct weekly quality control inspections
Step 1: Schedule Weekly Quality Control Inspections with Team
• Schedule weekly quality control inspections with the project team, confirming the date and time of each inspection
• Ensure that all key team members are aware of their roles
Step 2: Prepare Quality Control Checklist for Inspection
• Prepare a quality control checklist for the inspection, focusing on key areas such as material installation, flashing, safety compliance, and structural integrity
• Include any specific client requirements
Step 3: Conduct Visual Inspection of Roofing Work
• Conduct a visual inspection of the roofing work, checking for defects, misalignments, or areas that do not meet quality standards
• Use photos and notes to document findings
Step 4: Verify Compliance with Project Specifications and Safety Protocols
• Verify compliance with project specifications and safety protocols, ensuring that all tasks are performed according to guidelines
• Address any safety concerns identified during the inspection
Step 5: Discuss Findings with Project Team and Assign Action Items
• Discuss the inspection findings with the project team, assigning action items to address any issues identified
• Confirm that each team member understands their assigned tasks
Step 6: Reinspect Corrected Areas to Confirm Compliance
• Reinspect corrected areas to confirm compliance with project specifications and quality standards
• Document any remaining issues or necessary follow-up actions
Step 7: Document Quality Control Inspection Results in Project Records
• Document the quality control inspection results in the project records, including photos, action items, and corrective measures taken
• Communicate the results to all stakeholders
Coordinate with insurance adjuster for periodic inspections
Step 1: Schedule Periodic Inspections with Insurance Adjuster
• Schedule periodic inspections with the insurance adjuster, confirming dates and times that align with key project milestones
• Communicate the inspection schedule to all stakeholders
Step 2: Prepare Documentation and Reports for Inspection
• Prepare documentation and reports for the inspection, including progress updates, photos, and any issues encountered during the project
• Organize these materials for easy reference
Step 3: Conduct Walkthrough with Insurance Adjuster
• Conduct a walkthrough of the project site with the insurance adjuster, explaining key milestones, completed tasks, and any challenges faced
• Address any questions or concerns raised by the adjuster
Step 4: Review Insurance Requirements and Compliance
• Review insurance requirements and compliance guidelines with the adjuster, confirming that all tasks meet the required standards
• Note any feedback or recommendations for improvement
Step 5: Document Adjuster’s Feedback and Recommendations
• Document the adjuster’s feedback and recommendations in the project records, including any required follow-up actions
• Ensure that all team members are aware of the feedback received
Step 6: Implement Adjuster’s Recommendations as Needed
• Implement the adjuster’s recommendations as needed to maintain compliance with insurance guidelines
• Confirm that all changes are documented and communicated to the project team
Step 7: Confirm Inspection Completion and Next Steps with Adjuster
• Confirm inspection completion with the insurance adjuster and discuss the next steps or future inspections
• Communicate the next steps to all relevant stakeholders
Perform site cleanup and waste disposal of roofing materials
Step 1: Identify Waste Disposal Areas and Prepare Equipment
• Identify designated waste disposal areas for roofing materials and prepare the necessary equipment, such as dumpsters, trash bins, and recycling containers
• Ensure that all crew members are aware of disposal protocols
Step 2: Collect and Sort Waste Materials by Type
• Collect and sort waste materials by type, separating recyclable materials, hazardous waste, and general debris
• Confirm that all roofing nails, sharp objects, and scrap materials are safely contained
Step 3: Load Waste Materials for Disposal or Recycling
• Load waste materials into the appropriate containers for disposal or recycling, ensuring that each container is not overloaded and remains safely accessible
• Confirm that hazardous waste is handled according to guidelines
Step 4: Sweep and Clean Work Areas to Remove Debris
• Sweep and clean all work areas, including the roof, ground, and surrounding property, to remove any remaining debris
• Use magnetic sweepers to collect roofing nails and metal fragments
Step 5: Inspect Site for Remaining Waste or Hazards
• Inspect the site for any remaining waste or potential hazards, addressing any issues immediately
• Confirm that all work areas are safe and clear of debris
Step 6: Secure Waste Containers for Transportation
• Secure all waste containers for transportation to the disposal or recycling facility, ensuring that containers are properly sealed and labeled
• Confirm transportation arrangements with the waste disposal team
Step 7: Document Site Cleanup and Waste Disposal in Project Records
• Document the site cleanup and waste disposal activities in the project records, including photos of the cleaned areas and receipts from waste disposal facilities
• Communicate the cleanup status to the project manager
Conduct final inspection of the roofing work
Step 1: Schedule Final Inspection with Project Team
• Schedule a final inspection of the roofing work with the project team, confirming the date and time
• Ensure that all key stakeholders are available to participate in the inspection
Step 2: Prepare Final Inspection Checklist
• Prepare a final inspection checklist, focusing on key areas such as material installation, flashing, roof penetrations, and overall structural integrity
• Include any specific client requirements
Step 3: Conduct Visual Inspection of Roofing Work
• Conduct a visual inspection of the roofing work, checking for defects, misalignments, or areas that do not meet quality standards
• Use photos and notes to document findings
Step 4: Verify Compliance with Project Specifications and Safety Standards
• Verify compliance with project specifications and safety standards, ensuring that all tasks are completed according to guidelines
• Address any safety concerns identified during the inspection
Step 5: Identify Any Outstanding Items or Deficiencies
• Identify any outstanding items or deficiencies that need to be addressed, taking detailed notes for follow-up
• Confirm that all critical tasks are completed satisfactorily
Step 6: Discuss Findings and Assign Action Items
• Discuss the inspection findings with the project team, assigning action items to address any deficiencies identified
• Confirm that each team member understands their assigned tasks
Step 7: Document Final Inspection Results and Prepare for Client Review
• Document the final inspection results in the project records, including photos, action items, and corrective measures taken
• Prepare a summary report for the client review meeting
Notify client that roofing work is substantially complete
Step 1: Prepare Substantial Completion Report for Client
• Prepare a substantial completion report for the client, summarizing the completed roofing work, key milestones, and any outstanding items
• Ensure that the report is clear and professionally formatted
Step 2: Schedule Meeting with Client to Present Completion Report
• Schedule a meeting with the client to present the substantial completion report, confirming the date and time
• Communicate the meeting agenda and purpose to the client
Step 3: Present Substantial Completion Report to Client
• Present the substantial completion report to the client, reviewing key accomplishments, quality checks, and any outstanding items
• Address any questions or concerns raised by the client
Step 4: Confirm Client’s Acknowledgment of Substantial Completion
• Confirm the client’s acknowledgment of substantial completion, obtaining their signature or written confirmation if required
• Document their acknowledgment in the project records
Step 5: Communicate Next Steps and Schedule Final Walkthrough
• Communicate the next steps to the client, including the timeline for addressing any outstanding items
• Schedule a final walkthrough with the client and project manager
Step 6: Update Project Status to “Substantially Complete” in CRM
• Update the project status to “Substantially Complete” in the CRM, noting the date of client acknowledgment and any outstanding items
• Notify all relevant team members of the status update
Step 7: Document Client Acknowledgment and Next Steps in Project Records
• Document the client acknowledgment and next steps in the project records, including meeting minutes and key decisions made
• Confirm that all records are accurate and accessible
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!
Download Our Free eBook
Get Blueprint for Success, our free guide to scaling and systemizing your specialty trade construction business.