Pre-Construction Workflow
Welcome to the Pre-Construction Workflow SOP Template Library for Storm Damage Restoration (Residential) Roofing. Access free, expertly crafted Standard Operating Procedures for the pre-construction phase of your storm damage restoration projects. Our templates include site assessments, material procurement, and scheduling, ensuring a well-organized start. Download our templates today to streamline your pre-construction activities and set the foundation for a successful project.
Schedule project kickoff meeting
Step 1: Identify Participants
- List all key participants who need to attend the project kickoff meeting
- Include internal team members the GC subcontractors and any other relevant stakeholders
Step 2: Propose Meeting Times
- Contact all participants to propose three potential dates and times for the meeting
- Ensure the proposed times are within normal business hours and convenient for all parties
Step 3: Confirm Availability
- Wait for responses from all participants and confirm a mutually convenient time
- If the initial suggestions dont work propose alternative dates
Step 4: Send Confirmation
- Send a calendar invitation to all participants with the confirmed date time and location (or virtual meeting link)
- Include a brief agenda outlining the purpose of the meeting
Step 5: Prepare Agenda
- Draft an agenda covering key points to discuss during the meeting such as project scope roles and responsibilities timelines and any initial concerns
- Share the agenda with all participants ahead of the meeting
Step 6: Gather Necessary Documents
- Collect all relevant materials or documents needed for the meeting including project plans initial schedules and any supporting information
- Ensure all documents are up-to-date and accurately reflect the project details
Step 7: Notify Internal Team Members
- Inform any internal team members who need to attend the meeting
- Brief them on their roles and the key points to discuss
Step 8: Confirm Meeting Details with GC
- Follow up with the GC a day before the meeting to confirm attendance and address any last-minute changes
- Ensure the GC has all the necessary information and is prepared for the meeting
Step 9: Set Up Meeting Space
- If the meeting is in-person ensure the meeting room is booked and properly set up
- If the meeting is virtual test the online meeting platform to ensure it is working correctly
Step 10: Document the Process
- Record the scheduled meeting details in your CRM or project management system
- Set reminders for the meeting and any follow-up tasks
Hold project kickoff meeting
Step 1: Prepare Meeting Materials
- Ensure all necessary materials are prepared and organized including project plans schedules and any supporting documents
- Bring copies of these materials for all participants or ensure digital access if the meeting is virtual
Step 2: Set Up Meeting Space
- Arrive early to set up the meeting space if the meeting is in-person
- Ensure all equipment such as projectors or video conferencing tools is functioning properly
Step 3: Introduce Participants
- Begin the meeting by introducing yourself and any team members present
- Allow each participant to briefly introduce themselves and their role in the project
Step 4: Outline Meeting Agenda
- Review the meeting agenda to set expectations and ensure all key points will be covered
- Clarify the objectives of the meeting and the desired outcomes
Step 5: Discuss Project Scope and Objectives
- Present an overview of the project scope goals and objectives
- Highlight the key deliverables and success criteria for the project
Step 6: Review Roles and Responsibilities
- Clarify the roles and responsibilities of each team member and stakeholder
- Ensure everyone understands their tasks and how they contribute to the projects success
Step 7: Present Project Timeline
- Walk through the project timeline including key milestones and deadlines
- Discuss any potential challenges or critical paths that may impact the schedule
Step 8: Address Questions and Concerns
- Encourage participants to ask questions and express any concerns they may have
- Provide clear and concise answers to ensure everyone is on the same page
Step 9: Summarize Key Points and Next Steps
- Summarize the main points discussed during the meeting
- Outline the next steps and any immediate actions required from the participants
Step 10: Document Meeting Minutes
- Record detailed minutes of the meeting capturing all key discussions decisions and action items
- Distribute the meeting minutes to all participants and relevant stakeholders
Introduce client to project manager and key team members
Step 1: Schedule Client Introduction Meeting
- Determine a suitable time for the client introduction meeting
- Confirm availability of key team members
Step 2: Prepare a Team Overview Document
- Create a document that introduces each key team member and their role
- Include brief biographies and areas of responsibility
Step 3: Conduct Introduction Meeting
- Begin with introductions of each team member
- Highlight their specific contributions to the project
Step 4: Review Client Expectations
- Discuss client expectations for communication and project updates
- Set a cadence for regular meetings and touchpoints
Step 5: Outline Key Contact Information
- Provide direct contact information for the project manager and client liaison
- Confirm preferred contact methods and times
Step 6: Address Client Questions
- Allow time for the client to ask questions
- Note any specific client concerns for further action
Step 7: Confirm Next Steps
- Summarize key actions and upcoming meetings
- Reiterate project goals and objectives
Conduct detailed storm damage assessment and inspection
Step 1: Review Clients Initial Report and Concerns
- Review the clients initial report and concerns about storm damage, including any photos or notes provided
- Confirm the key areas to inspect based on the clients feedback
Step 2: Prepare Assessment Tools and Documentation
- Prepare the necessary assessment tools, such as cameras, measuring devices, and inspection forms
- Ensure that all team members are clear on their roles during the inspection
Step 3: Conduct Visual Inspection of Exterior and Interior Areas
- Conduct a visual inspection of both exterior and interior areas affected by the storm
- Look for visible signs of damage such as missing shingles, leaks, water stains, or structural damage
Step 4: Take Detailed Notes and Photos of Damage
- Take detailed notes and photos of all damage observed during the inspection
- Ensure that photos are labeled and organized according to the areas inspected
Step 5: Assess Structural Integrity and Safety Risks
- Assess the structural integrity of the affected areas and identify any potential safety risks
- Use appropriate tools and techniques to evaluate the severity of the damage
Step 6: Check for Hidden Damage and Secondary Issues
- Check for hidden damage and secondary issues such as mold, weakened supports, or compromised insulation
- Document any findings that require further inspection or follow-up
Step 7: Communicate Preliminary Findings to Client
- Communicate preliminary findings to the client, explaining the severity and potential impact of the damage
- Offer initial recommendations for repairs or further evaluation
Finalize project plans and specifications
Step 1: Review Initial Project Plans
- Go through the initial project plans and specifications in detail
- Verify that all project elements align with the clients expectations
Step 2: Confirm Material Specifications
- Review the list of materials and their specifications
- Ensure all materials meet quality standards and project requirements
Step 3: Cross-Check Plans with Client Requirements
- Cross-reference final plans with client feedback or adjustments
- Identify any discrepancies or updates needed
Step 4: Verify Compliance with Regulations
- Confirm that plans adhere to all relevant codes and regulations
- Document any required permits or compliance checks
Step 5: Coordinate with Key Team Members
- Share finalized plans with the project manager and lead foreman
- Confirm understanding of key details and deadlines
Step 6: Obtain Client Approval
- Present the finalized plans and specifications to the client
- Obtain formal approval and document their acceptance
Step 7: Distribute Finalized Plans
- Distribute the approved plans to all relevant stakeholders
- Confirm that each stakeholder has the latest version of the project plans
Verify material pricing and lead times
Step 1: Review Project Requirements
- Examine the project scope and identify all materials required for the roofing project
- Ensure you have a comprehensive list of materials with specifications
Step 2: Contact Suppliers
- Reach out to multiple suppliers to request current pricing and lead times for the required materials
- Ensure you provide detailed specifications to get accurate quotes
Step 3: Compare Quotes
- Collect and compare quotes from different suppliers
- Evaluate the pricing lead times and any additional terms or conditions
Step 4: Verify Lead Times
- Confirm the lead times provided by each supplier
- Ensure the lead times align with the project schedule and identify any potential delays
Step 5: Check Supplier Reliability
- Assess the reliability of each supplier based on past performance references and reviews
- Ensure they can consistently meet the required delivery schedules
Step 6: Negotiate Terms
- If necessary negotiate better pricing or lead times with the preferred suppliers
- Discuss bulk purchasing discounts or expedited shipping options
Step 7: Document Findings
- Record the verified pricing and lead times for each material
- Include supplier contact information quotes and any negotiated terms
Step 8: Update Project Budget and Schedule
- Send the finalized subcontract documents to the subcontractor for their signature
- Include clear instructions on how and when to return the signed documents
Develop detailed project schedule
Step 1: Outline Project Phases
- Break the project into key phases, such as demolition, installation, and final inspection
- Ensure each phase includes specific goals and deliverables
Step 2: Identify Milestones
- Identify critical milestones within each project phase
- Set deadlines for each milestone based on project scope
Step 3: Assign Responsibilities
- Assign tasks to appropriate team members for each phase
- Define the roles and responsibilities for each team member
Step 4: Estimate Timeframes
- Estimate the time required to complete each task and milestone
- Account for potential delays in critical tasks
Step 5: Review Dependencies
- Identify dependencies between tasks, such as prerequisite tasks
- Address potential bottlenecks early in the planning phase, such as prerequisite tasks
- Address potential bottlenecks early in the planning phase
Step 6: Develop a Timeline
- Create a comprehensive project timeline using project scheduling software
Step 7: Review with Project Team
- Present the schedule to the project team
- Confirm that each team member understands their tasks and deadlines
Confirm clients final selections (materials, colors, etc.)
Step 1: Review Clients Initial Preferences and Selections
- Review the clients initial preferences and selections for materials, colors, and finishes, as documented during previous meetings
- Confirm that all preferences are accurately recorded
Step 2: Present Final Material and Color Options to Client
- Present the final material and color options to the client, including samples or visual aids to help them make informed choices
- Highlight the benefits and features of each option
Step 3: Discuss Any Client Concerns or Preferences Changes
- Discuss any concerns or changes in preferences expressed by the client regarding the materials or colors
- Offer alternatives or suggestions based on their feedback
Step 4: Confirm Clients Final Selections and Document Approval
- Confirm the clients final selections for materials, colors, and finishes, documenting their approval in the project records
- Obtain a signature or written confirmation if required
Step 5: Update Project Plans to Reflect Final Selections
- Update the project plans and specifications to reflect the clients final selections, ensuring that all changes are accurately documented
- Confirm that all team members are informed of these updates
Step 6: Communicate Final Selections to Suppliers and Team
- Communicate the clients final selections to the suppliers and the project team, confirming that all orders and preparations align with the updated specifications
- Verify that everyone is clear on these changes
Step 7: Document Final Selections and Approvals in CRM
- Document the clients final selections and approvals in the CRM, including any related correspondence or approvals
- Ensure that all records are accessible for future reference
Order materials and equipment
Step 1: Review Final Selections and Project Requirements
- Examine the GCs final selections and the project requirements
- Ensure you have a comprehensive list of all materials and equipment needed for the roofing project
Step 2: Verify Supplier Information
- Confirm the contact details and ordering procedures for preferred suppliers
- Ensure you have up-to-date information on pricing lead times and availability
Step 3: Prepare Purchase Orders
- Draft purchase orders (POs) for all required materials and equipment
- Include detailed specifications quantities and any specific delivery instructions
Step 4: Obtain Internal Approvals
- If necessary seek internal approvals for the purchase orders
- Ensure all relevant stakeholders sign off on the orders before proceeding
Step 5: Place Orders with Suppliers
- Submit the purchase orders to the selected suppliers via email phone or online ordering system
- Ensure you receive confirmation of receipt from each supplier
Step 6: Confirm Delivery Schedules
- Verify the delivery schedules provided by the suppliers
- Ensure the delivery dates align with the project schedule and adjust if necessary
Step 7: Track Order Status
- Monitor the status of each order to ensure timely delivery
- Follow up with suppliers if there are any delays or issues with the order
Step 8: Notify Project Team
- Organize training sessions for all team members on the communication plan and tools
- Ensure everyone understands their roles responsibilities and the importance of effective communication
Verify subcontractor availability and schedules
Step 1: Identify Required Subcontractors
- List all subcontractors needed for the project specifying their roles and the tasks they will be responsible for
- Ensure you have up-to-date contact information for each subcontractor
Step 2: Review Project Timeline
- Examine the project timeline to identify key milestones and deadlines relevant to the subcontractors work
- Determine the periods during which subcontractor services will be required
Step 3: Contact Subcontractors
- Reach out to each subcontractor via email or phone to discuss the project requirements and timeline
- Provide details on the scope of work expected start and end dates and any critical deadlines
Step 4: Confirm Availability
- Ask each subcontractor to confirm their availability for the project dates
- Ensure they understand the timeline and can commit to the required schedule
Step 5: Discuss Schedules and Conflicts
- Discuss any potential scheduling conflicts or concerns the subcontractors may have
- Work together to resolve any issues and adjust the schedule if necessary
Step 6: Document Subcontractor Commitments
- Record each subcontractors confirmed availability and schedule in your project management system
- Include start dates end dates and any specific timeframes for their tasks
Step 7: Align Schedules with Project Timeline
- Ensure that the subcontractors schedules align with the overall project timeline
- Make any necessary adjustments to avoid delays or conflicts
Step 8: Communicate Schedule to Team
Step 9: Set Reminders for Follow-Up
Step 10: Monitor and Adjust
Finalize subcontract terms and prepare subcontract documents
Step 1: Review Project Scope and Requirements
- Examine the project scope and specific requirements that pertain to the subcontractors work
- Ensure you have a clear understanding of all tasks and deliverables expected from the subcontractor
Step 2: Draft Subcontract Terms
- Prepare a draft of the subcontract terms including scope of work payment schedule deadlines and any special conditions
- Include relevant details such as quality standards safety requirements and compliance with regulations
Step 3: Consult with Subcontractor
- Share the draft terms with the subcontractor for their review
- Arrange a meeting or call to discuss the terms and address any questions or concerns they may have
Step 4: Negotiate Final Terms
- Negotiate any necessary adjustments to the subcontract terms based on the subcontractors feedback
- Aim to reach a mutually agreeable set of terms that ensures clarity and fairness for both parties
Step 5: Prepare Subcontract Documents
- Once the terms are finalized prepare the formal subcontract documents
- Ensure all agreed-upon terms are clearly stated and legally sound
Step 6: Include Supporting Documentation
- Attach any supporting documentation required for the subcontract such as project plans timelines and specifications
- Ensure these documents are accurate and up-to-date
Step 7: Internal Review and Approval
- Submit the subcontract documents for internal review and approval
- Ensure relevant stakeholders sign off on the final terms before proceeding
Step 8: Send Subcontract to Subcontractor
Step 9: Confirm Receipt and Review
Step 10: Document and Record
Obtain client signatures on subcontract
Step 1: Prepare Final Subcontract Document for Client Signature
- Prepare the final subcontract document for the clients signature, ensuring that all necessary sections are complete and accurate
- Include a summary of key terms if needed
Step 2: Schedule Meeting with Client to Review Subcontract
- Schedule a meeting with the client to review the finalized subcontract and obtain their signature
- Confirm the meeting date, time, and location with the client
Step 3: Review Key Subcontract Terms with Client
- Review the key subcontract terms with the client, focusing on the scope of work, payment schedule, and any contingencies
- Address any client questions or concerns in real-time
Step 4: Guide Client Through the Signing Process
- Guide the client through the signing process, ensuring that all required signatures are obtained in the correct locations
- Verify that all parties are aware of their responsibilities
Step 5: Confirm Completion of Client Signature Process
- Confirm that the clients signature has been obtained on all necessary sections of the subcontract
- Double-check that all documents are properly signed and dated
Step 6: Document Signed Subcontract in Project Records
- Document the signed subcontract in the project records, updating the project status to indicate contract completion
- Store digital and physical copies securely
Step 7: Notify Subcontractor of Clients Approval
- Notify the subcontractor that the client has signed the subcontract, confirming that all parties are in agreement
- Provide the subcontractor with a copy of the signed document
Provide subcontractor with a copy of the signed subcontract
Step 1: Prepare a Copy of the Signed Subcontract for Subcontractor
- Prepare a complete copy of the signed subcontract for the subcontractor, ensuring that all pages are properly formatted and legible
- Include a cover letter summarizing key terms if needed
Step 2: Confirm Subcontractors Preferred Delivery Method
- Confirm the subcontractors preferred delivery method for receiving the signed subcontract, such as email, postal mail, or secure portal
- Verify the subcontractors contact details and delivery address
Step 3: Deliver the Signed Subcontract to Subcontractor
- Deliver the signed subcontract to the subcontractor using their preferred delivery method
- Send a confirmation message once the subcontract has been delivered
Step 4: Confirm Receipt and Offer to Review the Subcontract with Subcontractor
- Confirm that the subcontractor has received the signed subcontract and offer to review it with them if they have any additional questions
- Provide contact information for follow-up inquiries
Step 5: Document Delivery of Signed Subcontract in CRM
- Document the delivery of the signed subcontract in the CRM, including the delivery method, date, and subcontractor confirmation
- Update the project status to reflect contract finalization
Step 6: Store Copies of Signed Subcontract in Project Records
- Store copies of the signed subcontract in the project records, both digitally and physically
- Ensure that access is restricted to authorized personnel only
Step 7: Communicate Contract Delivery Status to Project Team
- Communicate the contract delivery status to the project team, confirming that all parties are in agreement
- Assign next steps or tasks as needed
Review permitting requirements
Step 1: Identify Required Permits
- Determine the types of permits required for the roofing project such as building permits zoning permits or environmental permits
- Consult local building codes and regulations to ensure compliance
Step 2: Contact Local Authorities
- Reach out to local building departments or permitting authorities to confirm the specific requirements for your project
- Obtain information on application procedures necessary documentation and associated fees
Step 3: Create a Permit Checklist
- Develop a checklist outlining all the permits needed and the corresponding documentation for each
- Include deadlines for submission and any special conditions that must be met
Procure permit
Step 1: Submit Permit Applications
- Submit all required permit applications to the relevant regulatory authorities
- Include all supporting documents and pay necessary fees
Step 2: Track Permit Status
- Regularly monitor the status of each submitted permit application
- Document all updates in a central tracking system
Step 3: Follow Up with Authorities
- Proactively follow up with regulatory authorities to address any pending issues or delays
- Respond promptly to any requests for additional information
Step 4: Obtain Approved Permits
- Confirm the extent of coverage for key project components, such as materials, labor, and potential contingencies
- Discuss any additional coverage options or endorsements if needed
Step 5: File and Distribute Permits
- Address any concerns or questions raised by the insurance adjuster, providing clear and detailed explanations
- Offer to provide additional documentation or information if required
Coordinate with insurance adjuster and confirm coverage details
Step 1: Schedule a Meeting with the Insurance Adjuster
- Schedule a meeting with the assigned insurance adjuster to discuss coverage details, project scope, and key considerations
- Confirm the date, time, and format of the meeting
Step 2: Prepare Project Documentation and Claims Information
- Prepare all necessary project documentation, including the damage assessment report, photos, cost estimates, and any previous correspondence with the client
- Ensure that all information is complete and organized
Step 3: Review Coverage Details and Limitations with Adjuster
- Review the coverage details and any limitations or exclusions outlined in the clients insurance policy with the adjuster
- Clarify any ambiguous points or terms to ensure full understanding
Step 4: Confirm Coverage for Key Project Components
- Designate safety roles and responsibilities to team members
- Ensure each person understands their duties such as safety monitoring first aid and equipment inspections
Step 5: Address Any Adjuster Concerns or Questions
- Create a site layout plan that highlights safety zones access points and equipment storage areas
- Ensure clear pathways and emergency exits are marked
Step 6: Document Agreed Coverage Details in Project Records
- List all required personal protective equipment (PPE) for fall protection such as harnesses lanyards and anchor points
- Ensure all team members are trained on the proper use and maintenance of PPE
Step 7: Communicate Coverage Confirmation to Client
- Create detailed rescue procedures for situations where a fall occurs
- Include steps for safely retrieving a fallen worker and providing first aid
Create site safety plan
Step 1: Identify Potential Hazards
- Conduct a thorough assessment of the roofing site to identify potential hazards
- Consider factors such as fall risks weather conditions electrical hazards and material handling
Step 2: Review Safety Regulations
- Review relevant safety regulations and standards such as OSHA guidelines for roofing work
- Ensure your safety plan complies with all legal requirements
Step 3: Define Safety Procedures
- Develop specific safety procedures to address the identified hazards
- Include fall protection measures proper use of personal protective equipment (PPE) safe material handling practices and emergency response procedures
Step 4: Assign Safety Roles and Responsibilities
- Develop specific procedures for safe work practices to prevent falls
- Include guidelines for using fall protection equipment accessing and egressing the roof and working near roof edges
Step 5: Develop a Site Layout Plan
- Designate fall protection responsibilities to team members
- Ensure each person understands their duties such as inspecting equipment setting up fall protection systems and monitoring compliance
Step 6: Specify PPE Requirements
- Establish a clear flow of information to ensure that updates and important messages reach all relevant stakeholders
- Specify how information will be documented shared and stored
Step 7: Establish Communication Protocols
- Develop feedback mechanisms to allow team members and stakeholders to provide input and ask questions
- Ensure there is a process for addressing and responding to feedback promptly
Step 8: Include Emergency Procedures
Step 9: Conduct Safety Training
Step 10: Document and Distribute the Plan
Create fall protection plan
Step 1: Create fall protection plan
- Conduct a thorough assessment of the roofing site to identify potential fall hazards
- Focus on areas such as roof edges skylights roof openings and ladders
Step 2: Review Regulatory Requirements
- Review relevant fall protection regulations and standards such as OSHA guidelines for roofing work
- Ensure your fall protection plan complies with all legal requirements
Step 3: Select Appropriate Fall Protection Systems
- Determine the most suitable fall protection systems for the identified hazards
- Options may include guardrails safety nets personal fall arrest systems and warning line systems
Step 4: Define Safe Work Procedures
- Create standardized templates for common communication needs such as project updates meeting agendas and safety alerts
- Ensure templates are clear concise and easy to use
Step 5: Assign Responsibilities
- Ensure all communication channels are set up and functioning properly
- Provide access and training to all team members on how to use the chosen communication tools
Step 6: Specify PPE Requirements
- Prepare a detailed inventory list of all mobilized equipment
- Include serial numbers, quantities, and assigned team members for each item
Step 7: Develop Rescue Procedures
- Share the equipment mobilization plan with the project team
- Confirm that all members understand their roles and responsibilities
Step 8: Conduct Fall Protection Training
Step 9: Install Fall Protection Systems
Step 10: Inspect and Maintain Equipment
Establish project communication plan
Step 1: Identify Communication Needs
- Determine the communication needs for the project including the types of information that need to be shared such as project updates schedule changes and safety alerts
- Consider the stakeholders involved such as the project team subcontractors and the GC
Step 2: Define Communication Methods
- Select the appropriate communication methods for the project such as email phone calls text messages project management software and in-person meetings
- Ensure the chosen methods are accessible and convenient for all stakeholders
Step 3: Establish Communication Schedule
- Create a communication schedule that outlines when and how often updates and meetings will occur
- Include regular progress meetings daily briefings and emergency communication protocols
Step 4: Develop Standardized Templates
- Check that all safety features, such as alarms and safety locks, are functioning correctly
- Test backup systems for critical equipment
Step 5: Set Up Communication Channels
- Coordinate transportation for heavy equipment and tools to the job site
- Ensure that all equipment is securely loaded and protected during transport
Step 6: Define Information Flow
- Install environmental protection measures, such as erosion controls or dust suppression
- Confirm that all measures are in compliance with regulations
Step 7: Implement Feedback Mechanisms
- Hold a meeting with the project team to review site readiness
- Confirm that all members are aware of their initial tasks and responsibilities
Step 8: Conduct Communication Training
Step 9: Monitor and Adjust the Plan
Prepare equipment for mobilization
Step 1: Inspect Equipment Condition
- Conduct a detailed inspection of all equipment to ensure its in good working order
- Record any issues or maintenance requirements
Step 2: Schedule Maintenance and Repairs
- Perform or schedule necessary maintenance and repairs for all equipment
- Document completed maintenance tasks and update equipment logs
Step 3: Organize Equipment by Phase
- Arrange equipment based on the sequence of project phases
- Ensure that critical equipment is readily accessible for initial phases
Step 4: Verify Equipment Safety Features
- Arrange for temporary utilities, such as power, water, and lighting
- Verify that utility setups are safe and adequate for project needs
Step 5: Secure Transport Logistics
- Perform a walkthrough of the site with the safety officer to identify any safety issues
- Address and document issues that need immediate correction
Step 6: Create Equipment Inventory List
- Assign the first set of tasks to team members based on the project schedule
- Provide any necessary resources or support for task completion
Step 7: Communicate Equipment Plan to Team
- Allow team members to ask questions or raise concerns
- Document any key issues or action items for follow-up
Prepare site for construction
Step 1: Set Up Site Access Control
- Establish entry and exit points for workers and equipment
- Implement security measures such as fencing and access badges
Step 2: Install Temporary Facilities
- Set up temporary facilities like restrooms, break areas, and tool storage
- Ensure these facilities are compliant with safety regulations
Step 3: Mark Work Zones and Hazards
- Clearly mark work zones and potential hazards using signage and barriers
- Designate areas for specific tasks, like materials storage and waste disposal
Step 4: Prepare Site Utilities
- Check the availability of materials, equipment, and personnel for the project start date
- Address any resource-related concerns
Step 5: Conduct Initial Safety Walkthrough
- Go over the established communication plan, including reporting schedules and emergency contacts
- Confirm that all team members are clear on communication channels
Step 6: Verify Environmental Protection Measures
Step 7: Review Site Readiness with Team
Conduct final pre-construction review meeting
Step 1: Review Project Scope and Objectives
- Reiterate the project scope and primary objectives to the team
- Ensure all members understand their roles and responsibilities
Step 2: Confirm Permits and Compliance
- Verify that all required permits have been obtained and are up to date
- Review compliance measures and documentation
Step 3: Discuss Safety and Quality Standards
- Reaffirm safety guidelines and protocols with the team
- Highlight quality standards and inspection processes
Step 4: Confirm Resource Availability
Step 5: Review Communication Protocols
Step 6: Establish Initial Task Assignments
Step 7: Open the Floor for Questions
Construction SOPs Your Employees Will Actually Use!
Subtrak’s game-changing SOP software helps contractors effortlessly document their processes and automatically delegate tasks to their entire project team, making sure everyone knows exactly what to do and when.
Schedule a demo today to see how Subtrak can save you time, money, and headaches!